Sreemaavi Meridian
SREEMAAVI INFRA PRIVATE LIMITED · Hanamkonda · RERA P00300007515
SREEMAAVI MERIDIAN is a plotted development in Somidi Revenue Village, Kazipet, Warangal Urban. The registered promoter is SREEMAAVI INFRA PRIVATE LIMITED. The tentative residential layout covers 14 Acer 9.52 Gts 68914 Sq. Yds and records 151 No's; it is a plotted development, with no building or floor configuration stated. It is registered with TG-RERA as P00300007515, and the project record lists a proposed completion date of 22/12/2026.
More from Sreemaavi Infra Pvt Ltd · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SREEMAAVI MERIDIAN RERA record |
| Project type | Plotted development / tentative residential layout RERA record |
| Phase or registered portion | Phase not specified; TG-RERA registration covers the project on the survey numbers listed below |
| TG-RERA registration number | P00300007515 Approvals record |
| Registration validity | 04/01/2024 to 22/08/2026, unless extended by the Authority Approvals record |
| Registered promoter | SREEMAAVI INFRA PRIVATE LIMITED RERA record |
| RERA status in the supplied record | New Project; registration certificate on file. Current validity or any extension after 22/08/2026 is not established by the supplied record. RERA record Approvals record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Somidi / Somidi Revenue Village RERA record Land records |
| Mandal | Kazipet is stated in the approval-plan extraction and Form B; the tentative layout extraction also says “GWMC Mandal.” |
| District | Warangal Urban in the project record; the layout document also describes the district as Warangal (Urban). The approval-plan extraction says Hanumakonda. RERA record RERA filing |
| PIN | 506003 RERA record RERA filing |
| All project survey numbers and subdivisions | 175/E1, 175/D/2, 175/F, 149/A/1, 149/A/2, 149/B/2, 149/B/3, 150/B, 153, 150/A/1, 151/B, 152/A, 152/B/3, 152/B/2, 151/A/1, 150/A/2, 151/A/2, 150/A/3, 150/A/4, 151/A/3, 174/C, 174/1/1, 174/A/1 Land records |
| Registered site extent | Form B declares Ac 14-10 Gts; the tentative layout extraction states 14 Acer 9.52 Gts 68914 Sq. Yds. |
| Layout-plan area figures | The plan extraction records Total Layout Area 57619.03 sq.m, ROAD AFFECTED AREA 550.68, and NET AREA 57068.35. The RERA land record separately lists total/net area as 57620.88 sq.m. RERA filing |
| Boundaries | Not disclosed in the supplied project evidence. Land records |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Warangal Municipal Corporation (GWMC) Approvals record |
| Principal layout approval | 0173/LO/3006/2023, dated 22 August, 2023; the approval-plan extraction separately records 29-06-2023. Approvals record |
| Application number | 004440/LO/DTCP/3006/0173/2023 Approvals record |
| Approved built-up area | Not applicable as a building-area figure in the supplied evidence for this plotted layout; no approved built-up area is stated. RERA filing |
| Plot count | 151 No's in the tentative layout extraction. |
| Buildings, floor configuration and parking levels | No buildings or building-floor configuration are identified in the supplied layout records. |
| Approved common parking area | The approval-plan extraction records 0.00 common parking area. The layout document also lists the mortgaged plots by plot number. |
Offering and status
| Field | Project record |
|---|---|
| Offering | Residential plots; the tentative layout is described as a residential plots layout. |
| Plot sizes, saleable area range and booked/available counts | Not disclosed in the supplied evidence. RERA unit table Layout record |
| Declared completion deadline | Promoter’s Form B undertaking: completion before 22nd August, 2026. |
| Proposed completion date in project record | 22/12/2026. RERA record |
| Construction/development stage | RERA-filed amenity progress percentages are supplied, but they are not independent site verification. No overall completion percentage is provided. RERA amenities |
| Occupancy/completion certificate | No occupancy or completion certificate is included in the supplied project documents. The layout approval is identified as tentative. Document index |
2. The project story
SREEMAAVI MERIDIAN is a proposed residential plotted layout in Somidi Revenue Village, Warangal Urban, registered with TG-RERA as P00300007515. Its registered survey identity comprises land in Survey Nos. 175/E1, 175/D/2, 175/F, 149/A/1, 149/A/2, 149/B/2, 149/B/3, 150/B, 153, 150/A/1, 151/B, 152/A, 152/B/3, 152/B/2, 151/A/1, 150/A/2, 151/A/2, 150/A/3, 150/A/4, 151/A/3, 174/C, 174/1/1 and 174/A/1.
The filed tentative layout approval describes 151 residential plots. It allocates land to plotted area, roads, open space, social infrastructure and utilities; the approval conditions also require the developer to provide layout infrastructure and keep roads accessible. The approval is expressly tentative, and the supplied record does not establish that the layout development works are complete or that a final layout release or completion certificate has been issued.
The promoter’s Form B declares that the project will be completed before 22nd August, 2026; the project record separately lists a proposed completion date of 22/12/2026. The supplied data does not establish the current overall site-completion status. The quarterly progress figures available for particular infrastructure items are reported filing data, not an independently verified inspection of the site. RERA record RERA amenities
3. Master plan, architecture & building design
The project is a plotted layout rather than a multi-storey building development. The tentative layout approval records 151 No's and a site extent of 14 Acer 9.52 Gts 68914 Sq. Yds. The filed RERA land record gives 57620.88 sq.m as total and net area; the layout-plan extraction separately states Total Layout Area 57619.03 sq.m, ROAD AFFECTED AREA 550.68, and NET AREA 57068.35. These are source-stated figures; no single reconciled site-area figure is established here. RERA filing
The tentative layout records 55.93% plotted area (7 Acer 35.48 Gts 38174 Sq. Yds), 31.42% road area (4 Acer 17.26 Gts 21448 Sq. Yds), 9.05% open space/park (1 Acer 11.04 Gts 6176 Sq. Yds), 2.58% social infrastructure (0 Acer 14.58 Gts 1764 Sq. Yds) and 1.01% utilities (0 Acer 5.72 Gts 692 Sq. Yds). It also records 15.45 % mortgage area (0 Acer 49.09 Gts 5940 Sq. Yds).
Road widths listed in the approval-plan extraction are 30.48MT, 12.20 MT, 18.00 MT, 24.00 MT, 9.14 and 3.05. The same extraction identifies a proposed 30.48MT road as per KUDA Master Plan 2041. No plot-by-plot dimensions, drawing-based plot arrangement measurements, or building design details are available in the supplied data.
4. Homes, configurations & floor plans
This is a plotted development, so the offering is residential plots rather than apartment configurations. The tentative layout extraction records 151 plots, but plot-size bands, individual plot areas, booked and available plot counts, and RERA-filed saleable-area figures are not supplied. RERA unit table Layout record
The supplied floor-plan package contains two drawings, both scans pending; no measurements were produced. Accordingly, no software-measured carpet areas or room measurements are available. Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 151 plots stated in tentative layout | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
5. Parking & vehicle circulation
The approval-plan extraction records 0.00 common parking area. The supplied tentative layout document identifies 23 plot numbers as mortgaged to the Municipality / Municipal Corporation under mortgage deed 17307/2023: Plot Nos. 30,49,54,55,60,61,68,69,76,50,53,56,59,62,67,51,52,57,58,63,66,65,64. The project evidence does not establish a resident or visitor parking count, parking allocation to individual plots, or EV provision.
The approval requires roads to remain open for access to neighbouring sites and prohibits a compound wall or fencing around the site. Road widths are listed in the approval-plan extraction; detailed driveway, pedestrian-separation or vehicle-circulation drawings are not available in the supplied record.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 1 Acer 11.04 Gts 6176 Sq. Yds; 9.05% of layout, as stated in the tentative layout extraction | Layout allocation is filed; independent completion status not established | |
| Social infrastructure | 0 Acer 14.58 Gts 1764 Sq. Yds; 2.58% | Area allocation filed; no facility details or completion verification supplied | |
| Utility area | 0 Acer 5.72 Gts 692 Sq. Yds; 1.01% | Area allocation filed; no independent completion verification | |
| Green strip / tot lot / park | RERA amenity record marks “YES”; reported progress 10% | RERA amenities | RERA-filed progress; not independently verified |
| Community buildings | Reported progress 0%; availability not stated | RERA amenities | Filing figure only |
| Aggregate recreational open space | Reported progress 0% | RERA amenities | Filing figure only |
The tentative layout approval says the open-space area is to be handed over to the Municipality / Municipal Corporation by registered gift deed before release of the tentative layout. The supplied evidence does not establish that this handover or park development has occurred.
7. Utilities, building services & safety
The tentative layout approval describes development works including road formation with black top, storm-water drains, underground drainage lines and a common septic tank / STP, internal water-supply pipelines and overhead tank, an assured water-supply source, electrical supply lines, streetlights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval-condition descriptions; the supplied evidence does not verify completion or disclose capacities.
| Service | Supplied record |
|---|---|
| Water | Layout condition specifies an assured water-supply source, internal pipelines and overhead tank. RERA amenity record reports water-supply progress of 15%. RERA amenities |
| Sewerage and drainage | Layout condition specifies underground drainage and common septic tank / STP. RERA amenity record reports sewerage progress of 25%, treatment/disposal of sewage and sullage water 10%, and storm-water drains 30%. RERA amenities |
| Electrical | Layout condition specifies electrical supply lines, streetlights and transformer. RERA amenity record reports street-lighting progress of 10% and electrical meter room/sub-station/receiving station progress of 15%. RERA amenities |
| Waste management | Layout condition refers to solid-waste management; RERA amenity record reports 20% progress. RERA amenities |
| Water conservation | Layout condition specifies rainwater-harvesting pits; RERA amenity record reports 30% progress for water conservation/rainwater harvesting. RERA amenities |
| Fire safety and accessibility | No fire-protection or accessibility facilities are described in the supplied evidence. The RERA amenity record shows fire-protection/fire-safety progress of 0%. RERA amenities |
8. Location, access & connectivity
The project is registered at Somidi Revenue Village, Warangal Urban, Telangana, PIN 506003. The project record identifies the district as Warangal Urban; the supplied approval-plan extraction identifies Hanumakonda, while the tentative layout document identifies Warangal (Urban). RERA record RERA filing
The supplied location record lists Financial District (Nanakramguda) at 1.2 km. No approach-road description, public-transport information, or further independently verified landmarks are supplied. Location record
See road widths and access conditions above.
9. Developer & development status
The registered promoter is SREEMAAVI INFRA PRIVATE LIMITED, a company. Its supplied corporate identifier is U45100TG2017 PTC 118876 and GSTIN is 36AAPCA9163L1ZZ. The RERA project record gives the promoter address as Flat No 201, Bhavanis YNR Paradise, Employees Colony, Somidi, Warangal Urban, 506003. The registration certificate’s promoter address field is incomplete; the supplied evidence does not provide an official contact number or website for the promoter. Corporate record Parties record RERA filing
The promoter’s Form B affidavit, signed by Director Nagendra Prasad Medishetty and dated November, 2023, declares that the project is based on development agreements with landlords over Ac 14-10 Gts, states that the land is free from encumbrances, and undertakes completion before 22nd August, 2026. These are promoter declarations. The project record also gives 22/12/2026 as the proposed completion date. No current overall development percentage or independent site-progress verification is supplied. RERA record
10. Approvals, official records & documents
| Record | Reference and scope |
|---|---|
| TG-RERA registration certificate | Form C certificate for SREEMAAVI MERIDIAN, registration P00300007515; validity stated as 04/01/2024 to 22/08/2026, unless extended. |
| Tentative layout approval | GWMC approval 0173/LO/3006/2023, dated 22 August, 2023; application 004440/LO/DTCP/3006/0173/2023; residential layout for 151 plots. |
| Approval-plan extraction | GWMC layout plan; extraction records date 29-06-2023, plan references and area allocations. |
| Mortgage deed recorded with layout | 17307/2023, dated 05 August, 2023; the tentative layout extraction identifies the mortgaged plots and Municipality / Municipal Corporation as mortgagee. |
| Form B declaration | Promoter affidavit dated November, 2023, including its development-agreement, encumbrance and completion declarations. |
| Title-search report | Advocate Y. Sreeragava Rao’s report dated 23-10-2023 is on file; it is a title opinion, not a substitute for the underlying registered instruments. |
| Final layout release / completion certificate / occupancy certificate | Not included in the supplied evidence. The layout document is expressly a tentative layout approval. |
| Location and external layout lookup | HMDA approved-layout lookup is reported unavailable through the public portal in the supplied record; that unavailability does not establish a refusal or approval. HMDA |
1. Project at a glance
Project identity
Registered project name: SREEMAAVI MERIDIAN
Project type: Plotted development / tentative residential layout
Phase or registered portion: Phase not specified; TG-RERA registration covers the project on the survey numbers listed below
TG-RERA registration number: P00300007515
Registration validity: 04/01/2024 to 22/08/2026, unless extended by the Authority
Registered promoter: SREEMAAVI INFRA PRIVATE LIMITED
RERA status in the supplied record: New Project; registration certificate on file. Current validity or any extension after 22/08/2026 is not established by the supplied record.
Land and geographic identity
Locality / revenue village: Somidi / Somidi Revenue Village
Mandal: Kazipet is stated in the approval-plan extraction and Form B; the tentative layout extraction also says “GWMC Mandal.”
District: Warangal Urban in the project record; the layout document also describes the district as Warangal (Urban). The approval-plan extraction says Hanumakonda.
PIN: 506003
All project survey numbers and subdivisions: 175/E1, 175/D/2, 175/F, 149/A/1, 149/A/2, 149/B/2, 149/B/3, 150/B, 153, 150/A/1, 151/B, 152/A, 152/B/3, 152/B/2, 151/A/1, 150/A/2, 151/A/2, 150/A/3, 150/A/4, 151/A/3, 174/C, 174/1/1, 174/A/1
Registered site extent: Form B declares Ac 14-10 Gts; the tentative layout extraction states 14 Acer 9.52 Gts 68914 Sq. Yds.
Layout-plan area figures: The plan extraction records Total Layout Area 57619.03 sq.m, ROAD AFFECTED AREA 550.68, and NET AREA 57068.35. The RERA land record separately lists total/net area as 57620.88 sq.m.
Boundaries: Not disclosed in the supplied project evidence.
Development identity
Sanctioning authority: Greater Warangal Municipal Corporation (GWMC)
Principal layout approval: 0173/LO/3006/2023, dated 22 August, 2023; the approval-plan extraction separately records 29-06-2023.
Application number: 004440/LO/DTCP/3006/0173/2023
Approved built-up area: Not applicable as a building-area figure in the supplied evidence for this plotted layout; no approved built-up area is stated.
Plot count: 151 No's in the tentative layout extraction.
Buildings, floor configuration and parking levels: No buildings or building-floor configuration are identified in the supplied layout records.
Approved common parking area: The approval-plan extraction records 0.00 common parking area. The layout document also lists the mortgaged plots by plot number.
Offering and status
Offering: Residential plots; the tentative layout is described as a residential plots layout.
Plot sizes, saleable area range and booked/available counts: Not disclosed in the supplied evidence.
Declared completion deadline: Promoter’s Form B undertaking: completion before 22nd August, 2026.
Proposed completion date in project record: 22/12/2026.
Construction/development stage: RERA-filed amenity progress percentages are supplied, but they are not independent site verification. No overall completion percentage is provided.
Occupancy/completion certificate: No occupancy or completion certificate is included in the supplied project documents. The layout approval is identified as tentative.
2. The project story
SREEMAAVI MERIDIAN is a proposed residential plotted layout in Somidi Revenue Village, Warangal Urban, registered with TG-RERA as P00300007515. Its registered survey identity comprises land in Survey Nos. 175/E1, 175/D/2, 175/F, 149/A/1, 149/A/2, 149/B/2, 149/B/3, 150/B, 153, 150/A/1, 151/B, 152/A, 152/B/3, 152/B/2, 151/A/1, 150/A/2, 151/A/2, 150/A/3, 150/A/4, 151/A/3, 174/C, 174/1/1 and 174/A/1.
The filed tentative layout approval describes 151 residential plots. It allocates land to plotted area, roads, open space, social infrastructure and utilities; the approval conditions also require the developer to provide layout infrastructure and keep roads accessible. The approval is expressly tentative, and the supplied record does not establish that the layout development works are complete or that a final layout release or completion certificate has been issued.
The promoter’s Form B declares that the project will be completed before 22nd August, 2026; the project record separately lists a proposed completion date of 22/12/2026. The supplied data does not establish the current overall site-completion status. The quarterly progress figures available for particular infrastructure items are reported filing data, not an independently verified inspection of the site.
3. Master plan, architecture & building design
The project is a plotted layout rather than a multi-storey building development. The tentative layout approval records 151 No's and a site extent of 14 Acer 9.52 Gts 68914 Sq. Yds. The filed RERA land record gives 57620.88 sq.m as total and net area; the layout-plan extraction separately states Total Layout Area 57619.03 sq.m, ROAD AFFECTED AREA 550.68, and NET AREA 57068.35. These are source-stated figures; no single reconciled site-area figure is established here.
The tentative layout records 55.93% plotted area (7 Acer 35.48 Gts 38174 Sq. Yds), 31.42% road area (4 Acer 17.26 Gts 21448 Sq. Yds), 9.05% open space/park (1 Acer 11.04 Gts 6176 Sq. Yds), 2.58% social infrastructure (0 Acer 14.58 Gts 1764 Sq. Yds) and 1.01% utilities (0 Acer 5.72 Gts 692 Sq. Yds). It also records 15.45 % mortgage area (0 Acer 49.09 Gts 5940 Sq. Yds).
Road widths listed in the approval-plan extraction are 30.48MT, 12.20 MT, 18.00 MT, 24.00 MT, 9.14 and 3.05. The same extraction identifies a proposed 30.48MT road as per KUDA Master Plan 2041. No plot-by-plot dimensions, drawing-based plot arrangement measurements, or building design details are available in the supplied data.
4. Homes, configurations & floor plans
This is a plotted development, so the offering is residential plots rather than apartment configurations. The tentative layout extraction records 151 plots, but plot-size bands, individual plot areas, booked and available plot counts, and RERA-filed saleable-area figures are not supplied.
The supplied floor-plan package contains two drawings, both scans pending; no measurements were produced. Accordingly, no software-measured carpet areas or room measurements are available.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 151 plots stated in tentative layout | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
5. Parking & vehicle circulation
The approval-plan extraction records 0.00 common parking area. The supplied tentative layout document identifies 23 plot numbers as mortgaged to the Municipality / Municipal Corporation under mortgage deed 17307/2023: Plot Nos. 30,49,54,55,60,61,68,69,76,50,53,56,59,62,67,51,52,57,58,63,66,65,64. The project evidence does not establish a resident or visitor parking count, parking allocation to individual plots, or EV provision.
The approval requires roads to remain open for access to neighbouring sites and prohibits a compound wall or fencing around the site. Road widths are listed in the approval-plan extraction; detailed driveway, pedestrian-separation or vehicle-circulation drawings are not available in the supplied record.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 1 Acer 11.04 Gts 6176 Sq. Yds; 9.05% of layout, as stated in the tentative layout extraction | Layout allocation is filed; independent completion status not established | |
| Social infrastructure | 0 Acer 14.58 Gts 1764 Sq. Yds; 2.58% | Area allocation filed; no facility details or completion verification supplied | |
| Utility area | 0 Acer 5.72 Gts 692 Sq. Yds; 1.01% | Area allocation filed; no independent completion verification | |
| Green strip / tot lot / park | RERA amenity record marks “YES”; reported progress 10% | RERA-filed progress; not independently verified | |
| Community buildings | Reported progress 0%; availability not stated | Filing figure only | |
| Aggregate recreational open space | Reported progress 0% | Filing figure only |
The tentative layout approval says the open-space area is to be handed over to the Municipality / Municipal Corporation by registered gift deed before release of the tentative layout. The supplied evidence does not establish that this handover or park development has occurred.
7. Utilities, building services & safety
The tentative layout approval describes development works including road formation with black top, storm-water drains, underground drainage lines and a common septic tank / STP, internal water-supply pipelines and overhead tank, an assured water-supply source, electrical supply lines, streetlights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval-condition descriptions; the supplied evidence does not verify completion or disclose capacities.
Water: Layout condition specifies an assured water-supply source, internal pipelines and overhead tank. RERA amenity record reports water-supply progress of 15%.
Sewerage and drainage: Layout condition specifies underground drainage and common septic tank / STP. RERA amenity record reports sewerage progress of 25%, treatment/disposal of sewage and sullage water 10%, and storm-water drains 30%.
Electrical: Layout condition specifies electrical supply lines, streetlights and transformer. RERA amenity record reports street-lighting progress of 10% and electrical meter room/sub-station/receiving station progress of 15%.
Waste management: Layout condition refers to solid-waste management; RERA amenity record reports 20% progress.
Water conservation: Layout condition specifies rainwater-harvesting pits; RERA amenity record reports 30% progress for water conservation/rainwater harvesting.
Fire safety and accessibility: No fire-protection or accessibility facilities are described in the supplied evidence. The RERA amenity record shows fire-protection/fire-safety progress of 0%.
8. Location, access & connectivity
The project is registered at Somidi Revenue Village, Warangal Urban, Telangana, PIN 506003. The project record identifies the district as Warangal Urban; the supplied approval-plan extraction identifies Hanumakonda, while the tentative layout document identifies Warangal (Urban).
The supplied location record lists Financial District (Nanakramguda) at 1.2 km. No approach-road description, public-transport information, or further independently verified landmarks are supplied.
See road widths and access conditions above.
9. Developer & development status
The registered promoter is SREEMAAVI INFRA PRIVATE LIMITED, a company. Its supplied corporate identifier is U45100TG2017 PTC 118876 and GSTIN is 36AAPCA9163L1ZZ. The RERA project record gives the promoter address as Flat No 201, Bhavanis YNR Paradise, Employees Colony, Somidi, Warangal Urban, 506003. The registration certificate’s promoter address field is incomplete; the supplied evidence does not provide an official contact number or website for the promoter.
The promoter’s Form B affidavit, signed by Director Nagendra Prasad Medishetty and dated November, 2023, declares that the project is based on development agreements with landlords over Ac 14-10 Gts, states that the land is free from encumbrances, and undertakes completion before 22nd August, 2026. These are promoter declarations. The project record also gives 22/12/2026 as the proposed completion date. No current overall development percentage or independent site-progress verification is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C certificate for SREEMAAVI MERIDIAN, registration P00300007515; validity stated as 04/01/2024 to 22/08/2026, unless extended.
Tentative layout approval: GWMC approval 0173/LO/3006/2023, dated 22 August, 2023; application 004440/LO/DTCP/3006/0173/2023; residential layout for 151 plots.
Approval-plan extraction: GWMC layout plan; extraction records date 29-06-2023, plan references and area allocations.
Mortgage deed recorded with layout: 17307/2023, dated 05 August, 2023; the tentative layout extraction identifies the mortgaged plots and Municipality / Municipal Corporation as mortgagee.
Form B declaration: Promoter affidavit dated November, 2023, including its development-agreement, encumbrance and completion declarations.
Title-search report: Advocate Y. Sreeragava Rao’s report dated 23-10-2023 is on file; it is a title opinion, not a substitute for the underlying registered instruments.
Final layout release / completion certificate / occupancy certificate: Not included in the supplied evidence. The layout document is expressly a tentative layout approval.
Location and external layout lookup: HMDA approved-layout lookup is reported unavailable through the public portal in the supplied record; that unavailability does not establish a refusal or approval.
Frequently asked questions
Is SREEMAAVI MERIDIAN registered with Telangana RERA?
Yes. SREEMAAVI MERIDIAN is registered with the Telangana Real Estate Regulatory Authority as P00300007515; the registration status is New Project.
Who is the developer of SREEMAAVI MERIDIAN?
The promoter named in the RERA registration is SREEMAAVI INFRA PRIVATE LIMITED.
Where is SREEMAAVI MERIDIAN located?
SREEMAAVI MERIDIAN is in Somidi, Hanamkonda, Telangana (506003).
When will SREEMAAVI MERIDIAN be completed?
The promoter's proposed date of completion filed with RERA is 22/12/2026. This is the promoter's declaration, not a guarantee.
More projects in Hanamkonda