SRI MALLIKARJUNA APARTMENTS is a residential apartment project in MADHAV NAGAR, NIZAMABAD, NIZAMABAD SOUTH mandal, Nizamabad district, developed by registered promoter V R CONSTRUCTIONS. The project covers 841.07 sq.m. and comprises one residential building with 1 Stilt + 5 upper floors and 20 2BHK units. Its TG-RERA registration number is P03100007400, and the promoter’s Form B states a proposed completion date of 28/03/2025.

01What we found

Period endedTG-RERA registration ran to 28 Mar 2025 - check its extension on TG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldTG-RERA record
Registered nameSRI MALLIKARJUNA APARTMENTS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo phase is separately identified. The registration concerns the project at Plot No. 13 partly; phase scope is not otherwise disclosed.
TG-RERA registrationP03100007400 RERA record
Registration validity19/12/2023 to 28/03/2025; the certificate records no extension. This is registration validity, not a statement of completion or occupancy. Approvals record
Registered promoterV R CONSTRUCTIONS RERA record Corporate record
RERA statusRegistration certificate issued; current post-expiry status is not established by the supplied record.

Land and geographic identity

FieldRecord
LocalityMADHAV NAGAR, NIZAMABAD RERA record RERA filing
Revenue villagePangra (B) Village / Madhav Nagar of Pangra (B) Village, as stated in the filed title and approval records. Land records
MandalNIZAMABAD SOUTH on the TG-RERA registration certificate; not disclosed in the project land identity fields. Land records
District / PINNizamabad / 503230 RERA record
Survey numbers and subdivisions272/AA, 272/E, 272/EE, 272/U and 272/UU Land records
Site extentTotal area 841.07 sq.m.; the building-permit extraction states net area 838.79 m² and road-affected area 0. RERA filing
Boundaries in RERA land recordEast: MAIN ROAD - 9; West: LAND OF SAMBA SHIVA RAO AND OTHERS; North: MAIN ROAD - 9; South: REMAINING PLOT OF PLOT NO 13. RERA filing

Development identity

FieldRecord
Sanctioning authorityNIZAMABAD Municipality/Municipal Corporation Approvals record
Principal building approval0013/BP/3072/2022, approved 29 March, 2022; file no. 002248/BP/DTCP/3072/0026/2022. Approvals record
Approved built-up area2,257.25 sq.m. in the RERA project fields. The permit extraction itemizes residential area as 1,793.15 and stilt area as 448.21; these are presented as separately recorded figures, not combined into a derived area. RERA filing
Building count and configurationOne residential building; sanctioned as 1 Stilt + 5 upper floors. RERA filing
Parking levelsThe permit conditions state that cellar and stilts approved for parking are to be used exclusively for parking; the extracted sanctioned parameters list cellar as 0 and stilt as 448.21.
Unit count20 RERA-filed units; the building-permit extraction does not provide a separate sanctioned unit count. RERA unit table

Offering and status

FieldRecord
Configuration2BHK RERA unit table
RERA-filed saleable area113.15 sq.m. RERA unit table
Booked / available0 booked / 20 available, as last read from TG-RERA; the portal record supplied here has no as-of date. Treat these counts as indicative. RERA unit table
Construction stageThe supplied RERA record gives a completion undertaking and permit, but no independently verified current construction stage.
Completion deadlinePromoter’s Form B states 28/03/2025.
Occupancy / completion certificateThe building-permit extraction records completion as not certified; no occupancy or completion certificate is supplied. The permit requires an occupancy certificate before occupation.

2. The project story

SRI MALLIKARJUNA APARTMENTS is registered as a residential apartment project at Plot No. 13 partly, in the Madhav Nagar area of Pangra (B) Village, Nizamabad district. The registered land description identifies survey subdivisions 272/AA, 272/E, 272/EE, 272/U and 272/UU. RERA record Land records

The filed building permit describes one residential building, “Building - PRAMOD (LAXMI),” with a stilt and five upper floors. TG-RERA records 20 units of the 2BHK configuration. The supplied floor-plan measurements cover eight flat designs; they are measurements from the drawing, not a current site inspection or a RERA-filed carpet-area statement. RERA unit table Floor plans

The promoter’s Form B undertaking gives 28/03/2025 as the completion date. The supplied permit extraction says completion is not certified, and no occupancy certificate is included. The available evidence therefore does not establish the project’s present construction condition or that any portion has received occupancy certification.

3. Master plan, architecture & building design

The RERA record describes a site extent of 841.07 sq.m.; the building-permit extraction separately records net area 838.79 m², road-affected area 0, and a Tot-lot (m2) 45.01 entry. It identifies one residential building and sanctions 1 Stilt + 5 upper floors. No supplied drawing-derived record establishes the building footprint, floor-by-floor unit arrangement, number of flats per floor, lifts, stairs, entrances, or internal circulation. RERA filing

The permit extraction records approved residential area 1,793.15 and stilt area 448.21. The project fields record approved built-up area 2,257.25 sq.m. These are retained as the source-labelled figures; the supplied material does not define a separate FSI-counted area or provide a carpet-area schedule filed by RERA. RERA filing

The permit lists a tot-lot and periphery greenery requirements, including fencing and maintaining the tot-lot as greenery before an occupancy certificate is issued. The approved-plan extraction also lists front, rear and side setbacks as 3 m, 4 m, 4 m and 4 m, respectively.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020113.15 sq.m.Software-measured range: 56.4–95.2 sq.m.; median 68.1 sq.m.40%

RERA records 20 units and a saleable area of 113.15 sq.m. for the 2BHK configuration. Booked and available counts are portal figures without an as-of date in the supplied record. RERA unit table

The carpet-area range, median and loading are software measurements from approved floor-plan drawing geometry, not RERA disclosures; the measured set covers 8 flat designs and is noted as needing review. Saleable area and carpet area are different measures: the supplied drawing-measurement record says saleable area includes the home’s share of common areas, while the software-measured carpet figure is derived from the drawing and should be checked against it. No RERA-filed carpet area is provided here. Floor plans RERA unit details

A measured second-floor flat plan labelled “03” shows a master bedroom, bedroom, hall, foyer, kitchen, two toilets and two balconies labelled 1.20 M. WIDE BALC and 1.43 M. WIDE BALC. These room labels and dimensions are drawing-derived, not a statement that every unit has the same arrangement.

5. Parking & vehicle circulation

The building permit states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use. Its extracted parameters list Cellar 0 and Stilt 448.21; the supplied RERA unit data also marks the units as mortgaged. The record does not establish the number of sanctioned parking spaces, visitor or accessible spaces, parking allocation to individual units, or the number of parking levels beyond the permit’s wording. RERA unit table

The separate vendor specification lists open parking (461 sqm) and 20 Covered Parking spaces; this is a vendor-provided claim, not a confirmed count of sanctioned or legally allocated spaces. No supplied evidence identifies a ramp, EV charging, or a documented unit-wise parking allotment. Promoter website

6. Amenities, recreation & open spaces

Tot-lot / green strip
Description / sizePermit extraction records 45.01 m² for “Tot-lot”; permit conditions require it to be fenced and maintained as greenery.
Declared progress / verified statusSanctioned/conditioned; completion not established.
Periphery greenery
Description / sizePermit requires a greenery strip around the site and tree plantation along the periphery and in front of the premises.
Declared progress / verified statusPermit condition; delivered status not established.
Water supply
Description / sizeListed as available “YES” in the RERA amenities data; the permit says public water supply connections are provided only on production of an occupancy certificate.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-listed; actual connection or operating status not established.
Sewerage
Description / sizeRERA amenities list “Sewerage (Chamber, Lines, Septic Tank, STP)” as available “YES”; no component capacities or completion evidence are supplied.
Evidence sourceRERA amenities
Declared progress / verified statusListed; delivered or operating status not established.
Storm-water drains
Description / sizeListed in the RERA amenities record.
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0%; completion not established.
Rainwater harvesting
Description / sizePermit requires a rainwater-harvesting structure (percolation pit); RERA amenities list water conservation/rainwater harvesting as available “YES”.
Evidence sourceRERA amenities
Declared progress / verified statusRequired/listed; installation status not established.
Transformer space / electrical room
Description / sizePermit requires space for a transformer; RERA amenities list an electrical meter room, sub-station and receiving station as available “YES”.
Evidence sourceRERA amenities
Declared progress / verified statusRequired/listed; installation or operation not established.
Garbage house
Description / sizeRequired within the premises under the building-permit conditions.
Declared progress / verified statusPermit condition; completion not established.

The RERA amenities data shows progress as 0% for the listed items with percentage fields. Those entries do not independently verify present site conditions. No clubhouse, indoor recreation or sports facility is identified in the supplied records. RERA amenities

7. Utilities, building services & safety

The RERA amenities record lists water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, rainwater harvesting, and an electrical meter room/sub-station/receiving station. The building permit requires a rainwater-harvesting percolation pit, transformer space and a garbage house. No capacities, water-source details, treatment or reuse specifications, backup power details, or completed-service evidence are supplied. RERA amenities

The permit requires sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision, and states that structural and fire safety are the responsibility of the owner, builder/developer, architect and site engineer. It also requires an occupancy certificate before occupation and says public water and electricity connections will be provided only on production of that certificate. These are permit conditions; the supplied record does not establish that the systems are installed, tested or certified.

No lift count or capacity, fire-system specification, escape-stair details, accessibility provisions, CCTV/access-control system, or waste-segregation arrangement is evidenced in the supplied data. RERA amenities

8. Location, access & connectivity

The registered project location is MADHAV NAGAR, NIZAMABAD, district Nizamabad, PIN 503230; the registration certificate identifies the mandal as NIZAMABAD SOUTH. The title and approval records refer to Pangra (B) Village / Madhav Nagar of Pangra (B) Village. The RERA land boundaries identify MAIN ROAD - 9 to the east and north. RERA record

The building permit refers to an 18M road width and conditions concerning the road-facing site. The supplied location data provides a cadastral parcel centroid coordinate of 17.41528, 78.35459. No verified public-transport information or measured distances to local landmarks is supplied. Location record

9. Developer & development status

The TG-RERA registered promoter is V R CONSTRUCTIONS, recorded as a proprietorship. The RERA party record names VEERAMACHANENI PRAMOD KUMAR as authorized signatory. The supplied corporate information does not provide a verified corporate registration number or an independently confirmed registered office; the project record gives a promoter address at B, Madhava Nagar, Pangra, Ward 4, Hyderabad Road, Madhav Nagar, Nizamabad, Telangana 503230. Corporate record Parties record RERA record

The promoter’s Form B, dated 07-10-2023, undertakes to complete the project by 28/03/2025. The supplied evidence does not establish current construction progress, a revised completion date, or occupancy certification. The registration certificate records validity through 28/03/2025 and no extension.

10. Approvals, official records & documents

TG-RERA registration certificate
Reference / scopeForm C; project P03100007400; issued 19/12/2023; validity to 28/03/2025.
Building permit / approval for construction
Reference / scope0013/BP/3072/2022, approved 29 March, 2022; file no. 002248/BP/DTCP/3072/0026/2022; NIZAMABAD Municipality/Municipal Corporation; Plot No. 13 partly and survey subdivisions 272/AA, 272/E, 272/EE, 272/U, 272/UU.
Commencement / building construction approval
Reference / scopeFiled as “Commencement Certificates for each building in each phase”; extracted approval is for one residential building with 1 Stilt + 5 upper floors.
Approved layout plan
Reference / scopeA layout-plan document entry is present, but the supplied record does not include an extracted plan drawing or layout dimensions.
EvidenceDocument index
Form B promoter declaration
Reference / scopeDated 07-10-2023; includes the promoter’s completion undertaking and other declarations.
Occupancy / completion certificate
Reference / scopeNo certificate supplied; building-permit extraction records completion as not certified.
Floor-plan drawing
Reference / scopeDrawing record 357019 supports the software-measured 2BHK floor-plan observations; measurements are not RERA disclosures.

The building permit includes conditions concerning parking use, a tot-lot, rainwater harvesting, transformer space, greenery and obtaining an occupancy certificate before occupation.

Frequently asked questions

Is SRI MALLIKARJUNA APARTMENTS registered with Telangana RERA?

Yes. SRI MALLIKARJUNA APARTMENTS is registered with the Telangana Real Estate Regulatory Authority as P03100007400; the registration status is New Project.

Who is the developer of SRI MALLIKARJUNA APARTMENTS?

The promoter named in the RERA registration is V R CONSTRUCTIONS.

Where is SRI MALLIKARJUNA APARTMENTS located?

SRI MALLIKARJUNA APARTMENTS is in MADHAV NAGAR, NIZAMABAD, Nizamabad, Telangana (503230).

When will SRI MALLIKARJUNA APARTMENTS be completed?

The promoter's proposed date of completion filed with RERA is 28/03/2025. This is the promoter's declaration, not a guarantee.

More projects in Nizamabad