Sri Venkateshwara Residency Phase-II

SSV CREATIONS · Karimnagar · RERA P02700003232

SRI VENKATESHWARA RESIDENCY PHASE-II is a residential apartment project in VAVILALAPALLY, Karimnagar district; the mandal is not stated in the supplied record. The registered promoter is SSV CREATIONS, a partnership. The project covers 676.83 sq.m. and comprises one residential building with Stilt + 5 upper floors and 20 2BHK units; the RERA-filed saleable area is 42.59 sq.m. The TG-RERA registration number is P02700003232, and the proposed completion date is 06/10/2024.

01What we found

Period endedTG-RERA registration ran to 6 Oct 2024 - check its extension on TG-RERA
15documents on file - each fact links to its page
1court case on this project's land (survey 1318, Karimnagar)
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameSRI VENKATESHWARA RESIDENCY PHASE-II RERA record
Project type / registered portionResidential apartment project; the registered name identifies Phase-II. The supplied record does not describe the overall development or the scope of any other phase. RERA record RERA filing
TG-RERA registrationP02700003232; Form ‘C’ records a grant under section 5, issued 25/08/2021, with validity from 25/08/2021 to 06/10/2024. The supplied registration record states no extension. Registration validity is not a completion certificate or occupancy certificate. RERA record
Registered promoterSSV CREATIONS; partnership. RERA record Corporate record
RERA status in supplied recordRegistration validity ended 06/10/2024; current registration status is not stated in the supplied record.

Land and geographic identity

ItemRecord
LocalityVAVILALAPALLY; the building-permit record also renders it “Vavilala Pally_W50.” RERA filing
Revenue villageVavilalapally appears in the title and approval records. The RERA land identity fields do not disclose a village; confirm the revenue-village identity against the underlying land records. Land records
MandalNot disclosed in the supplied project record. Land records
District / PINKarimnagar, Telangana; PIN 505212. RERA record
Survey number(s)Sy. No. 1318; no subdivision is supplied. Land records
Site areaTotal/plot area 676.83 sq.m.; road-affected area 85.49 sq.m.; net area 591.34 sq.m. Land records
Boundaries filed with RERAEast: EXISTING BUILDING; West: 15M ROAD; North: EXISTING BUILDING; South: EXISTING BUILDING. RERA filing
Approval drawing road labelsThe drawing extract lists 15.24, 15.24 MT WIDE PROPOSED MASTER PLAN ROAD, 15 M MASTER PLAN ROAD, 50'-0" ROAD, and 30'-0" ROAD. Their relationship to the RERA boundary description is not specified here.

Development identity

ItemRecord
Sanctioning authorityKarimnagar Municipal Corporation. Approvals record
Principal building permissionApproval/file no. 3011/W50/2018/3727, dated 06 October, 2018; approval drawing also lists G1/433-1/2018 and proceedings/application no. 3011/W50/2018/3727. Approvals record
Approved building configurationOne residential building, Stilt + 5 upper floors; the permit extract describes it as a semi-detached dwelling building.
Approved areasThe plan extract separately states Residential Net BUA: 1467.22, BUILT UP AREA: 1812.44, Proposed Net Built up Area: 1467.20, and Total Net Built up Area: 1488.20 sq.m. These are distinct extracted labels, not interchangeable measures.
Approved building heightPermit extract states 14.00 mt. and also 19.65 mt. Total Ht. / 14.00 mt. Excluding Stilt Floor.
Units20 units in the approval-plan extract; TG-RERA filing also records 20 units. RERA unit table
ParkingApproval-plan extract states 4 proposed parkings. The permit requires approved stilt parking to be used exclusively for parking; it does not establish unit-wise allocation.

Offering and status

ItemRecord
RERA-filed configuration2BHK, 20 units; 0 booked and 20 available in the portal-derived record. The portal count has no supplied as-of date and is indicative. RERA unit table RERA unit details
RERA-filed saleable area42.59 sq.m. for the 2BHK configuration. RERA unit table RERA unit details
Construction stageNo current construction-progress evidence is supplied. The registration record’s proposed completion date is 06/10/2024; the building permit says completion notice and occupancy certificate are to be obtained after construction. RERA record
Occupancy / completion certificateThe supplied building-permit extraction records completion_certified: false; no occupancy or completion certificate is supplied. This is the record available here, not a fresh authority search.
Booked / available contextCounts are as last read from the TG-RERA portal; no read date is supplied. RERA unit table

2. The project story

SRI VENKATESHWARA RESIDENCY PHASE-II is registered with TG-RERA as a residential apartment project on Sy. No. 1318, in the Vavilalapally locality of Karimnagar district. The RERA land record gives a total area of 676.83 sq.m., including 85.49 sq.m. identified as road-affected, and a net area of 591.34 sq.m. RERA record Land records

The municipal approval describes one residential building with Stilt + 5 upper floors and records 20 units; the RERA unit filing also records 20 2BHK units. The project registration gives a proposed completion date of 06/10/2024, but no current construction update or occupancy certificate is included in the supplied evidence. A completed-project description appears in a third-party vendor record, but it is not used here to establish completion. RERA unit table RERA record

The unit availability figures are portal-derived and have no stated as-of date. They should therefore be read as indicative rather than a live inventory confirmation. RERA unit table

3. Master plan, architecture & building design

The approval-plan extract describes a single residential building on a 676.83 sq.m. plot, with 85.49 sq.m. identified as road-affected and 591.34 sq.m. as net area. It records 297.90 sq.m. vacant plot area and 293.44 sq.m. proposed coverage area, with a stated 49.62% coverage. These are approval-plan figures, not independent measurements.

The building is approved as Stilt + 5 upper floors. The permit extract identifies a 14.00 m height, while the plan extract also states 19.65 mt. Total Ht. / 14.00 mt. Excluding Stilt Floor. The approval extracts show differing built-up-area labels: Residential Net BUA: 1467.22, BUILT UP AREA: 1812.44, Proposed Net Built up Area: 1467.20, and Total Net Built up Area: 1488.20 sq.m. They are presented as recorded; no FSI-counted area or carpet-area schedule is supplied.

The supplied records do not establish flats per floor, floor-by-floor arrangement, lift or stair count, building footprint drawing, or detailed internal circulation. The approval extract lists Green Strip, PARKING, Lift, and STAIRCASE as plan items, but provides no detailed dimensions for those features.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002042.59 sq.m.Not measuredNot supplied

Unit counts, booked/available figures and saleable area are from the TG-RERA-derived unit record. Booked/available counts are indicative because the record provides no as-of date. RERA unit details RERA unit table

Two drawing records were processed, but no plausible 2BHK flat-design carpet measurement was produced. Accordingly, there is no software-measured carpet area to report. A RERA saleable area and a carpet area are different measures; the supplied evidence does not provide the unit’s carpet area, room dimensions, balcony/utility measurements, or common-area loading. Floor plans RERA unit details

5. Parking & vehicle circulation

The approval-plan extract records 4 proposed parkings. The permit states that cellar and stilt areas approved for parking must be used exclusively for parking of vehicles, without partition walls or rolling shutters. The supplied extracts do not identify the number of parking levels, bay dimensions, ramp arrangement, visitor or accessible parking, EV charging, or unit-wise parking allocations. A drawn or sanctioned parking provision does not by itself establish exclusive ownership or allocation to a particular unit.

6. Amenities, recreation & open spaces

The following items appear in the RERA amenity record and municipal approval extracts. The amenity record shows 0% progress for its listed entries; that is not independent verification of whether a facility has been built or is operational.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lotSize not supplied; approval extract calls for a fenced tot-lot maintained as greenery before occupancy certificate.RERA amenitiesRERA amenity record: 0%; completion not independently verified.
Recreational open spaceAggregate area is listed, but no size is supplied.RERA amenitiesRERA amenity record: 0%; completion not independently verified.
Internal roads and footpathsNo dimensions supplied.RERA amenitiesRERA amenity record: 0%; completion not independently verified.
Community buildingsNo facility description or size supplied.RERA amenitiesRERA amenity record: 0%; completion not independently verified.

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage, septic tank/STP, storm-water drains, street lighting, rainwater harvesting, an electrical meter room/sub-station/receiving station, solid-waste management, energy management, and fire protection. Its progress entries show 0%; this does not establish whether the services are installed or operational. RERA amenities

The approval-plan extract lists SEPTIC TANK, RWH, Lift, and STAIRCASE. The building-permit conditions also require provision of transformer space, a garbage house, and a rainwater-harvesting percolation pit. No storage, treatment, lift-capacity, backup-power, fire-system or accessibility specifications are supplied. The permit requires a completion notice and occupancy certificate after construction and states that an occupancy certificate is compulsory before occupation.

8. Location, access & connectivity

The registered project location is Vavilalapally, Karimnagar, Telangana, 505212, on Sy. No. 1318. The RERA boundary record describes the west side as a 15M ROAD and the other three sides as existing buildings. The approval-plan extract also contains several road-width labels, but does not map them to a particular project boundary in the supplied text. RERA record RERA filing RERA filing

The supplied location data includes a cadastral-parcel-centroid coordinate of 17.41528, 78.35459, labelled as such, and one connectivity reference: Financial District (Nanakramguda), 1.2 km. No other verified access, public-transport or travel-time information is provided. Location record

9. Developer & development status

The registered promoter is SSV CREATIONS, identified in the RERA record as a partnership. The supplied corporate records identify T. Sunitha and T. Ramesh as partners; T. Sunitha is described in a project filing as managing partner and authorised signatory. The firm record gives an address at Sri Nilayam, RTC X Roads, Vavilalapally, Karimnagar, Karimnagar, 505212. Corporate record Parties record

The registration certificate’s promoter-office field instead records Village: Mandal: District: Hyderabad, Pin: 500020; that is the certificate’s stated office field, not evidence of the project site location.

The project filing gives a completion deadline of 06/10/2024, while the registration certificate’s validity also ends on 06/10/2024. The supplied evidence does not show a registration extension, current construction progress, or an occupancy/completion certificate. RERA record

10. Approvals, official records & documents

RecordWhat the supplied evidence identifies
TG-RERA registration certificate, Form ‘C’Registration P02700003232 for SRI VENKATESHWARA RESIDENCY PHASE-II; issued 25/08/2021, valid through 06/10/2024 as recorded.
Building permit orderKarimnagar Municipal Corporation; file/approval no. 3011/W50/2018/3727, dated 06 October, 2018, for a Stilt + 5 residential building at Sy. No. 1318, Vavilalapally. The permit extract records validity through 06 October, 2024.
Approval-plan extractPlan identifies one residential building and 20 units; cites approval no. G1/433-1/2018, application/proceedings no. 3011/W50/2018/3727, and previous municipal permission proceedings G2/2589/32/2000.
Commencement / completion / occupancy statusThe permit requires a commencement notice before work and completion notice and occupancy certificate after completion. The supplied permit extraction records completion_certified: false; no occupancy certificate is supplied.
Project declaration, Form BSupplied extraction identifies a Form B declaration whose gist names SRI VENKATESHWARA RESIDENCY PHASE-I, while its completion undertaking gives 06/10/2024. It is not treated here as a Phase-II completion certificate or proof of completion.
Layout lookupNo layout-permission number is disclosed in the RERA land identity. The supplied plan document is an approval-plan extract; a separate approved-layout certificate is not identified in the supplied evidence. Land records

Frequently asked questions

Is SRI VENKATESHWARA RESIDENCY PHASE-II registered with Telangana RERA?

Yes. SRI VENKATESHWARA RESIDENCY PHASE-II is registered with the Telangana Real Estate Regulatory Authority as P02700003232; the registration status is New Project.

Who is the developer of SRI VENKATESHWARA RESIDENCY PHASE-II?

The promoter named in the RERA registration is SSV CREATIONS.

Where is SRI VENKATESHWARA RESIDENCY PHASE-II located?

SRI VENKATESHWARA RESIDENCY PHASE-II is in KARIMNAGAR, Telangana (505212).

When will SRI VENKATESHWARA RESIDENCY PHASE-II be completed?

The promoter's proposed date of completion filed with RERA is 06/10/2024. This is the promoter's declaration, not a guarantee.