Sign in

Surya kuteer at kadipikonda prime and also known as surya kuteer kothapally prime

SURYA AGRITECH · Hanamkonda · RERA P00300006800

Surya kuteer at kadipikonda prime and also known as surya kuteer kothapally prime is a plotted development / layout with open plots in Kadipikonda, Khazipet mandal, Warangal Urban district. The registered promoter is Surya Agritech. The project has a registered total land area of 104605.84 sq.m., and the layout drawing’s software-extracted schedule records 299 plots; plot sizes are 141.04–459.48 sq.m. TG-RERA registration number P00300006800 was issued 30/08/2023, and the promoter’s completion undertaking is 15TH DECEMBER,2024.

01What we found

Period endedTG-RERA registration ran to 15 Dec 2024 - check its extension on TG-RERA
125documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameSurya kuteer at kadipikonda prime and also known as surya kuteer kothapally prime RERA record
Project typePlotted development / layout with open plots RERA record
Phase or registered portionNo separate phase name or phase-wise scope disclosed; registration is for the project land and survey numbers listed below
TG-RERA registrationP00300006800
Registration validity30/08/2023 to 15/12/2024; the certificate says the period may be extended by the Authority under the Act and Rules. No extension is recorded in the supplied certificate
Registered promoterSurya Agritech
StatusThe supplied TG-RERA record labels it “New Project.” Registration validity is separate from the promoter’s completion undertaking and from any completion/occupancy certification RERA record RERA filing

Land and geographic identity

FieldProject record
Locality / villageKadipikonda; the registered land description also identifies Kothapally village, rendered as Kothapally Haveli in layout documents RERA record
MandalKhazipet (also rendered as Kazipet in project documents) RERA record
DistrictWarangal Urban in the RERA identity and registration certificate; layout documents also use Hanumakonda District RERA record
PIN506003 RERA record
Registered survey identity223, 238, 239, 240, 241, 242 of Kothapally village; and 386, 387, 393 of Kadipikonda village
Survey subdivisions shown in the layout-plan extraction223/, 223/ /3/1/1/2/2, 223/1A, 223/1B, 223/1C; 238/1/1/1/1, 238/1/1/1/2, 238/1/1/2/1, 238/1/1/2/2, 238/1/2, 238/1/3, 238/3/1/1, 238/3/1/2; 239/A/1, 239/A/5/1, 239/A/5/2, 239/A/6, 239/A/7, 239/B/1/2/1/1/1, 239/B/1/2/1/1/2, 239/B/1/1/3, 239/B/2/2/1, 239/B/1/2/1/2, 239/B/2/1/1, 239/B/2/1/2, 239/B/2/2/2, 239/B/3/1, 239/B/3/2; 240/A, 240/B; 241/A, 241/B/1, 241/B/2, 241/C/1, 241/C/2, 241/D/1, 241/D/2/2, 241/D/3/1, 241/D/3/2, 241/D/2/1, 241/K/1; 242/A/2, 242/C/2/1, 242/C/2/2, 242/C/3; 386/H/2, 387/A, 387/B, 387/C, 387/D, 387/E, 387/F, 387/G, 387/H, 393/A/2. These are drawing-extracted identifiers; the supplied extraction includes malformed text and should be checked against the plan.
Site areaRegistered/plan-stated total 104605.84 sq.m.; plan-stated net layout area 102765.43 sq.m.; the RERA land record gives net area 102765.43 sq.m. and affected area 1840.41 sq.m. RERA record Land records
BoundariesEast: land of Bashboina Saikrishna and others; west: land of Surya Agri Tech and others; north: land of Polepaka Srinu and others; south: land of Surya Agritech and others RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Warangal Municipal Corporation (GWMC); the tentative-layout approval names GWMC Municipality/Municipal Corporation
Principal layout approvalTentative Layout Plan No. 0289/LO/3006/2022, dated 07-11-2022 in the drawing record Approvals record
Other plan references shownTS/069952/2022; 010884/LO/DTCP/3006/0383/2022; 0141/LO/3006/2022; 0062/LO/3006/2022 Approvals record
Approved built-up area59110.63 sq.m. as recorded in the RERA project fields; this is not a plot-area figure RERA filing
Buildings / floorsNot applicable to the registered plotted-layout configuration as described in the supplied records; no tower/block count or building-floor configuration is disclosed for this project
Plot countThe tentative-layout approval extraction states 299 No's; a separate plan extraction states 298. The drawing-based software schedule records 299 plots. Confirm the operative approved plot schedule and final release with the authority Layout record
ParkingThe drawing extraction records PROPOSED NUMBER OF PARKINGS 0 and Common Parking Area 0.00; no separate resident/visitor allocation is disclosed

Offering and status

FieldProject record
Offered productOpen residential plots; the layout approval conditions specify detached single-family dwelling houses on sites
Plot sizesSoftware-measured from the layout drawing: 141.04–459.48 sq.m. (168.7–549.5 sq.yd.); median 195.1 sq.m. (233.3 sq.yd.). These are drawing-derived, not RERA-filed unit-area disclosures Layout record
Booked / available plotsNot disclosed in the supplied unit inventory RERA unit table
Construction stageNo independently verified construction progress or completion status is supplied. RERA amenity-progress fields show 0% for the listed items; that filing data is not an independent site inspection RERA amenities
Completion datePromoter’s Form B undertaking: 15TH DECEMBER,2024
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied evidence; scope/status therefore remains unverified Document index

2. The project story

This is registered as a plotted residential layout spread across land in Kothapally and Kadipikonda villages, Khazipet mandal, PIN 506003. The registered survey identity is 223, 238, 239, 240, 241 and 242 in Kothapally village, and 386, 387 and 393 in Kadipikonda village.

The layout drawing describes a residential open-plot arrangement, with roads, organized open space/parks, social-infrastructure land and utility land. The software-extracted plot schedule identifies 299 plots, but the supplied approval and plan extractions do not agree on the stated plot count; the operative schedule and final layout release should be confirmed. Layout record

The RERA record describes the project as new and records a promoter completion undertaking to 15 December 2024. The supplied material does not establish current on-site progress or show an occupancy/completion certificate. The RERA progress percentages supplied for listed infrastructure items are 0%; they are portal declarations, not independent verification of site conditions. RERA filing RERA amenities Document index

3. Master plan, architecture & building design

The layout drawing records a total site area of 104605.84 sq.m. and net layout area of 102765.43 sq.m. Its land-use table allocates 59110.63 sq.m. (57.52%) to plots, 30697.52 sq.m. (29.87%) to roads, 9249.54 sq.m. (9.00%) to organized open space/parks, 2677.51 sq.m. (2.61%) to social infrastructure and 1027.89 sq.m. (1.00%) to utilities. It shows 0.00 for amenity area and common parking area. These are drawing-extracted layout figures.

The plan extraction records road widths of 12.19M, 9.14M, 18.29MT, 30.00 MT, and references to proposed/existing roads including PROPOSED 100'-0" WIDE ROAD, EXISTING 60'-0" WIDE ROAD, EXISTING 40'-0" WIDE ROAD, and EXISTING 30'-0" WIDE ROAD. It also notes a 30M WIDE BUFFER ZONE, a 2M WIDE BUFFER ZONE, lake/tank/kuntas FTL boundaries, canal/vagu/nala/storm-water-drain boundaries, and a feeder channel of Devadula Canal. These are plan annotations; the supplied material does not establish independent on-ground verification of these features.

The RERA fields state an approved built-up area of 59110.63 sq.m. The layout is not a multi-storey building scheme in the supplied approval records; no tower, floor, apartment, or building-footprint details are disclosed. RERA filing

The plan records a mortgage area of 9079.76 sq.m.; the tentative-layout approval also describes mortgage security and conditions tied to infrastructure completion and release of the final layout.

4. Homes, configurations & floor plans

This is a plotted project, not an apartment configuration schedule. The supplied RERA evidence does not provide booked/available plot inventory or RERA-filed plot saleable areas by unit. The layout drawing’s software-extracted schedule records 299 plots and the following size distribution; measurements are drawing-derived and should be checked against the approved schedule. RERA unit table Layout record

Plot size band (sq.yd.)Plot size band (sq.m.)Plots
150–200125–16768
200–250167–209174
250–300209–25130
300–400251–33423
400–500334–4182
500–1000418–8362

The measured range is 141.04–459.48 sq.m. (168.7–549.5 sq.yd.), with a median of 195.1 sq.m. (233.3 sq.yd.). The plan-derived plot-area sum is reported as matching the plotted area in the drawing’s area statement. No carpet-area, apartment saleable-area, or loading figure applies in the supplied plotted-layout data. Layout record

5. Parking & vehicle circulation

The layout-plan extraction states PROPOSED NUMBER OF PARKINGS 0 and Common Parking Area 0.00. The supplied material does not disclose individual plot parking allocations, visitor parking, accessible spaces, or EV charging.

The layout drawing records internal road widths and road connections, including proposed and existing roads. It does not establish a separate parking structure, parking level, vehicle ramp, or exclusive parking rights for plot purchasers.

6. Amenities, recreation & open spaces

Landscape/open space

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Organized open space / parks9249.54 sq.m. (9.00%) in the layout land-use scheduleDrawing extractionRERA amenity progress field shows 0%; completion not independently verified RERA amenities
Open-space componentsPlan extraction lists OPEN SPACE -2 8017.28 SQ MTS, OPEN SPACE -3 13786.82 SQ MTS, OPEN SPACE -4 1717.85 SQ MTS, and OPEN SPACE -4 557.54 SQ MTSDrawing annotations only; delivery/progress not independently verified
Tot-lotListed as a layout featureNo completed-status evidence supplied
Green strip / tot-lot / parkRERA amenity list marks “YES”RERA amenitiesListed progress is 0%; not independently verified

Convenience/community

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Social infrastructure land2677.51 sq.m. (2.61%) in the land-use tableLand allocation shown; no facility-specific delivery or completion evidence
Utility land1027.89 sq.m. (1.00%) in the land-use tableLand allocation shown; utility delivery is addressed separately below
Community buildingsListed in the RERA amenity schedule without a supplied “YES” status or facility descriptionRERA amenitiesProgress field shows 0%; not independently verified

The promoter’s website lists a swimming pool, gym, garden, jogging/cycling/yoga, children’s play area, temple, security and other features. These are promoter-marketed claims, not confirmed as sanctioned or delivered by the supplied project-file evidence, so they are not treated as established project facilities here. Promoter website

7. Utilities, building services & safety

The tentative-layout approval describes proposed development works including road formation with black top, storm-water drains, underground drainage lines and common septic tank/STP, internal water-supply pipelines and overhead tank, an assured water-supply source, electrical supply lines, street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. The approval also lists water reservoir, septic tank, sewerage treatment plant, electric transformer and solid-waste management among the utility provisions. These are approval conditions/proposed works; no completion verification or capacity figures are supplied.

The RERA amenity schedule marks water supply, sewerage (chambers, lines, septic tank/STP), internal roads and footpaths, street lighting, and electrical meter room/sub-station/receiving station as “YES”; each listed progress field is 0%. Storm-water drains, sewage/sullage treatment, solid-waste management, rainwater harvesting and energy management appear in the schedule, but the supplied record does not establish their completed status. RERA amenities

The supplied project evidence does not specify water-source yield, storage capacity, STP capacity, reuse arrangements, electrical load or backup, fire-safety systems, CCTV/access-control details, or accessibility provisions. No statutory compliance conclusion can be drawn from the available layout descriptions alone. Document index RERA amenities

8. Location, access & connectivity

The registered project location is Kadipikonda, Khazipet mandal, Warangal Urban district, PIN 506003; the registered survey description also includes land in Kothapally village. RERA record

The location record supplies the following sampled distances: Primary Health Centre Kadipikonda 1.1 km; Gramina Vikas Bank, Madikonda 2.0 km; Kazipet Junction 2.3 km; Vishwa Bharathi High School 1.9 km; and the nearest sampled Outer Ring Road interchange approximately 104.0 km. These are location-record distances, not promoter travel-time claims. Location record

9. Developer & development status

The TG-RERA-registered promoter is Surya Agritech, identified in the project records as a partnership. Its GSTIN is 36ABNFS0543E1Z8. Parties record Corporate record

The registration certificate lists the promoter office as Village: GMH Hanmakonda, Mandal: Hanamkonda, District: Warangal Urban, Pin: 506001. A Form B declaration dated 04/03/2023, made by authorized signatory THANGALLAPALLY HARSHA VARDHAN for Surya Agritech, undertakes project completion by 15TH DECEMBER,2024 and includes declarations on title, project funds, audits and pending approvals.

The supplied evidence does not establish current construction progress, completed infrastructure, final layout release, or an occupancy/completion certificate. The RERA registration certificate’s validity ran from 30/08/2023 to 15/12/2024 and records no extension in the supplied certificate. RERA amenities Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP00300006800; issued 30/08/2023; valid to 15/12/2024
What the supplied evidence establishesForm C registration certificate for the named project and promoter; records registration conditions, including separate-account and conveyance requirements
Tentative layout approval
Identifier / date0289/LO/3006/2022; dated 07-11-2022 in the drawing record
What the supplied evidence establishesGWMC tentative-layout approval extraction for a 299-plot residential layout, with stated development conditions
Layout drawing / plan references
Identifier / dateTS/069952/2022; 010884/LO/DTCP/3006/0383/2022; 0141/LO/3006/2022; 0062/LO/3006/2022
What the supplied evidence establishesDrawing-derived identifiers and layout figures; the supplied record includes two plan pages Approvals record
Form B promoter declaration
Identifier / dateDated 04/03/2023
What the supplied evidence establishesAuthorized-signatory declaration for Surya Agritech, including the 15 December 2024 completion undertaking
Completion / occupancy certificate
Identifier / dateNot present in the supplied evidence
What the supplied evidence establishesStatus and scope are not established Document index
HMDA layout lookup
Identifier / dateNot publicly available in the supplied evidence
What the supplied evidence establishesNo public lookup result is provided; this does not establish approval or refusal HMDA

Frequently asked questions

Is Surya kuteer at kadipikonda prime and also known as surya kuteer kothapally prime registered with Telangana RERA?

Yes. Surya kuteer at kadipikonda prime and also known as surya kuteer kothapally prime is registered with the Telangana Real Estate Regulatory Authority as P00300006800; the registration status is New Project.

Who is the developer of Surya kuteer at kadipikonda prime and also known as surya kuteer kothapally prime?

The promoter named in the RERA registration is SURYA AGRITECH.

Where is Surya kuteer at kadipikonda prime and also known as surya kuteer kothapally prime located?

Surya kuteer at kadipikonda prime and also known as surya kuteer kothapally prime is in 506003, Kadipikonda, Khazipet, Hanamkonda, Telangana (506003).

When will Surya kuteer at kadipikonda prime and also known as surya kuteer kothapally prime be completed?

The promoter's proposed date of completion filed with RERA is 15/12/2024. This is the promoter's declaration, not a guarantee.

More projects in Kadipikonda