Tulasi Lake Front Block 18
TULASI CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200004373
TULASI LAKE FRONT BLOCK 18 is a residential apartment project in SURARAM VILLAGE, Qutballapur, Medchal-Malkajgiri. The registered promoter is TULASI CONSTRUCTIONS, a partnership. The project has a site extent of 668.8 sq. m and one building with 1 Stilt + 5 upper floors, comprising 20 2BHK apartments. Its TG-RERA registration number is P02200004373, and the stated completion date is 21/01/2028.
More from Tulasi Constructions · 7 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | TULASI LAKE FRONT BLOCK 18 RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Registered as Block 18; phase-wise scope is not separately described in the supplied record. RERA record |
| TG-RERA registration | P02200004373; registration certificate issued 04/04/2022, valid through 21/01/2028. RERA record |
| Registration status | TG-RERA record describes the project as New Project; the certificate states a five-year validity period, commencing 04/04/2022 and ending 21/01/2028, unless extended. RERA filing |
| Registered promoter | TULASI CONSTRUCTIONS; partnership. RERA record RERA filing Corporate record |
| Completion deadline stated in project record | 21/01/2028. This is distinct from registration validity and from the occupancy certificate status below. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | SURARAM VILLAGE; the RERA record also spells the village “Suraram Villege”. The building-permit and OC extractions identify SURARAM. RERA record RERA filing |
| Mandal | Qutballapur (also rendered Qutubullapur in the OC extraction). RERA record |
| District / PIN | Medchal-Malkajgiri, 500015. RERA record |
| Project survey numbers | 96/A, 97 & 98. RERA record Land records |
| Survey subdivisions | The project filing names 96/A; it does not identify project-held subdivisions of 97 or 98. The land-record extract separately lists 96/అ, 97/అ, 97/ఆ, 97/ఇ, 97/ఈ, 98/అ, 98/ఆ/1, 98/ఆ/2, 98/ఆ/3 and 98/ఆ/4; the filing does not specify which subdivisions of 97 and 98 correspond to the project. Land records |
| Plot numbers recorded | 96, 97, 116 & 117. RERA filing |
| Site extent | 668.8 sq. m; the building-permit and OC records state 668.80 m2. RERA filing |
| Net / total area | RERA land details show Total Area 668.8, Net Area 668.80, and affected area 00 sq. m. RERA filing |
| Boundaries in RERA land details | East: ROAD WIDTH 9; West: ROAD WIDTH 9; North: PLOT NO 98 115; South: PLOT NO 95 118. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building permit | Approval 2/C26/00070/2022, dated 21 January, 2022; file 2/C26/06782/2021. Approvals record |
| Approved building description | Building - PROPOSED-1; 1 Stilt + 5 upper floors. |
| Approved built-up / floor area | Building-permit extraction: residential area 1,591.35 m2. |
| Approved height | 14.9 m. |
| Buildings / blocks | One building is shown in the RERA project record. RERA unit table |
| Parking provision in permit | Stilt parking area 344.51 m2; parking-space count is not supplied. |
| Approved versus RERA-declared units | GHMC approval states that sanctioned unit numbers must not be increased without prior approval, but the supplied permit extraction does not provide a unit count. TG-RERA records 20 units. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Unit type | 2BHK apartments. RERA unit table |
| RERA-filed saleable area | 93.83 sq. m per unit. RERA unit table |
| Booked / available | 0 booked / 20 available, as shown in the TG-RERA portal data supplied; the record has no booking-count as-of date, so these figures are indicative. RERA unit table |
| Construction stage | The supplied material does not establish current construction progress. The project record is labelled New Project; no independent site-progress verification is provided. RERA filing Document index |
| Original / revised completion date | Promoter’s Form B undertaking states 21/01/202.8 (as extracted); the project record and vendor description give 21/01/2028. No revised completion date is supplied. RERA record |
| Occupancy certificate | An OC for the residential apartment building is on file: GHMC approval 3155/GHMC/KPL/2024-OC, dated 17 October, 2024. The supplied OC extraction identifies the building at the project’s survey numbers and states it was inspected and declared fit for occupation. |
2. The project story
The TG-RERA record describes a single-building residential apartment project, TULASI LAKE FRONT BLOCK 18, at Suraram Village, Qutballapur mandal, Medchal-Malkajgiri district. The registered site is identified by survey numbers 96/A, 97 & 98 and plot numbers 96, 97, 116 & 117, with a recorded extent of 668.8 sq. m. RERA record RERA filing
The GHMC building-permit record provides for one residential building, 1 Stilt + 5 upper floors, with an approved residential area of 1,591.35 m2. The TG-RERA unit schedule records 20 2BHK apartments. RERA unit table
The supplied project file includes a GHMC occupancy certificate dated 17 October, 2024 for a residential apartment building at the same survey numbers. That is an authority-issued OC record; it should not be confused with the separate TG-RERA registration validity through 21/01/2028 or the project completion date stated in the filing. The available evidence does not establish the current on-site construction stage or independently verify present occupation. RERA record
3. Master plan, architecture & building design
The GHMC building permit identifies one proposed residential building with 1 Stilt + 5 upper floors, an approved height of 14.9 m, residential area of 1,591.35 m2, and stilt parking area of 344.51 m2. The site area in that record is 668.8 m2. These are approval-record figures, not saleable or carpet-area figures.
The RERA-filed project record lists one building and one proposed building unit, while the unit schedule records 20 apartments. The supplied permit extraction does not state flats per floor, lift or stair numbers, building footprint, detailed circulation, or a floor-by-floor unit schedule. RERA filing RERA unit table
The permit lists 30 Trees, 5 rainwater-harvesting structures, a transformer space, a garbage house and an ETP requirement. It records Tot-lot 0 m2. No detailed landscape plan, open-space allocation or internal-road plan is available in the supplied evidence.
The later GHMC OC extraction records sanctioned floor area of 1,591.35 m2 and site-building-plan floor area of 1,698.09 m2. Full analysis of the recorded plan and site details is addressed in the approvals review; this overview reports the figures as stated in the OC record.
4. Homes, configurations & floor plans
TG-RERA records 20 2BHK units, with filed saleable area of 93.83 sq. m each; the portal snapshot shows 0 booked and 20 available, without an as-of date. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 93.83 sq. m | Software-measured median 62.1 sq. m; measured range 60.8–65.0 sq. m across 8 flat designs | 34% (software-derived from drawing measurements) |
The carpet-area measurements are software measurements from the floor-plan drawing, not TG-RERA disclosures; the supplied drawing record says they need review. The drawing measurement excludes the balcony, which is shown as 1.22 M. WIDE BALC; the cited plan panel also labels living, wash, dining/kitchen, two toilets, bedroom and master bedroom. The plan-derived room and area measurements should be checked against the drawing. Floor plans RERA unit details
Saleable area and carpet area are different measures in this evidence: the RERA-filed figure is saleable area, while the floor-plan figure is software-measured carpet area. The supplied plan data describes saleable area as also accounting for a share of common areas. No separately filed balcony or utility area is provided. RERA unit table Floor plans
5. Parking & vehicle circulation
The GHMC permit records 344.51 m2 of stilt parking area. The OC extraction also records parking area of 344.51 m2 under both the sanctioned-plan and site-building-plan entries. The supplied records do not give a parking-bay count, visitor or accessible-space count, two-wheeler provision, EV charging provision, or unit-wise parking allocations.
The permit extraction identifies road widths as 18 mt. and the RERA land details give east and west boundaries as ROAD WIDTH 9. The material supplied does not include a detailed vehicle-circulation plan or establish exclusive ownership or allocation of any parking bay. RERA filing
6. Amenities, recreation & open spaces
The project amenity record lists facilities and services but shows 0% progress for each listed item; it does not provide independent verification that they have been completed. The GHMC permit separately lists specified site provisions. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / recreational open space | 0 m2 in the permit and OC extracts | No recreational area shown in these records | |
| Trees | 30 Trees | Permit-listed provision; completion not verified | |
| Community buildings | Listed in RERA amenities; no size supplied | RERA amenities | 0% recorded; not independently verified |
| Green strip / tot-lot / park | Listed in RERA amenities; no size supplied | RERA amenities | 0% recorded; not independently verified |
| Internal roads & footpaths | Listed in RERA amenities; no size supplied | RERA amenities | 0% recorded; not independently verified |
7. Utilities, building services & safety
The RERA amenity record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Water Conservation, Rain water Harvesting, Energy management, Fire Protection And Fire Safety Requirements, and Electrical Meter Room, Sub-Station, Receiving Station as available, but records 0% progress for each. It does not specify capacities, equipment or current operating status. RERA amenities
The GHMC permit requires rainwater-harvesting structures, transformer space, a garbage house and an ETP. The OC extraction also records rainwater harvesting. These entries evidence listed requirements or recorded provisions, not independent verification of their current operation.
The permit states that an occupancy fire NOC is to be obtained from the Director (EV&DM) before issue of the occupancy certificate. The supplied material does not include a fire NOC document, details of lifts or lift capacity, backup power, CCTV, access control, accessibility features, or a detailed waste-management system.
8. Location, access & connectivity
The registered location is Suraram Village, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500015; the registration certificate spells the village “Suraram Villege.” The building-permit and OC records refer to SURARAM and “Suraram Village-1.” RERA record RERA filing
The RERA land details state ROAD WIDTH 9 on the east and west boundaries; the building-permit extraction records road widths of 18 mt. The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 11.1 km. No additional road, public-transport or landmark distances are provided. RERA filing Location record
9. Developer & development status
The registered promoter is TULASI CONSTRUCTIONS, identified in the RERA filing as a partnership. Its GSTIN is 36AAOFT0091L1ZQ. The project record supplies the promoter’s address as GANESH PLAZA, GANESH NAGAR, SURARAM VILLAGE, SURARAM VILLAGE, Qutballapur, Medchal-Malkajgiri, 500015; a separate office address in the registration certificate is Village: Quthbullapur-1, Mandal: Qutballapur, District: Medchal-Malkajgiri, Pin: 500054. RERA filing Corporate record Parties record
The RERA record names BODDU SUSMA, BODDU RAVI SHANKAR RAO and BODDU VENKATESWARA RAO as partners, and BODDU ASHOK as authorised signatory. The Form B declaration was made by BODDU ASHOK for the promoter and states a completion undertaking of 21/01/202.8 as extracted. Parties record
A current construction-progress report is not present in the supplied evidence. The vendor record describes the project as under construction, but that is a third-party description, not an independently verified site update. The project record’s stated completion date is 21/01/2028; the GHMC OC record separately documents an occupancy certificate for the residential apartment building. Promoter website RERA record
10. Approvals, official records & documents
| Identifier / date | P02200004373; issued 04/04/2022; valid through 21/01/2028 |
|---|---|
| Scope and source | Project registration for TULASI LAKE FRONT BLOCK 18; survey numbers 96/A, 97, 98. |
| Identifier / date | 2/C26/00070/2022, dated 21 January, 2022; file 2/C26/06782/2021 |
|---|---|
| Scope and source | Residential building permit; survey numbers 96/A, 97, 98; one building, 1 Stilt + 5 upper floors. |
| Identifier / date | 3155/GHMC/KPL/2024-OC, dated 17 October, 2024; application 006417/GHMC/3056/KPL2/2024-OC |
|---|---|
| Scope and source | OC record for the residential apartment building at the project survey numbers; completion notice is recorded as submitted 10 June, 2024. |
| Identifier / date | 3155/GHMC/KPL/2024-OC, dated 17 October, 2024 |
|---|---|
| Scope and source | Additional extraction of the same stated approval number; identifies plots 96, 97, 116 & 117 and survey numbers 96/A, 97, 98. |
| Identifier / date | Dated 10/02 / 2022 |
|---|---|
| Scope and source | Promoter-filed declaration covering title basis, encumbrance statement, completion undertaking and project-account commitments. |
| Identifier / date | LRS/4629C-15/NZ/GHMC/2008 |
|---|---|
| Scope and source | Reference recorded in the GHMC permit extraction; an approved layout plan is not included as an extracted drawing in the supplied material. |
| Identifier / date | Document 217094 |
|---|---|
| Scope and source | Drawing-based measurements used for the software-measured carpet-area summary; not a RERA area disclosure. Floor plans |
1. Project at a glance
Project identity
Registered project name: TULASI LAKE FRONT BLOCK 18
Project type: Residential apartment project
Phase / registered portion: Registered as Block 18; phase-wise scope is not separately described in the supplied record.
TG-RERA registration: P02200004373; registration certificate issued 04/04/2022, valid through 21/01/2028.
Registration status: TG-RERA record describes the project as New Project; the certificate states a five-year validity period, commencing 04/04/2022 and ending 21/01/2028, unless extended.
Registered promoter: TULASI CONSTRUCTIONS; partnership.
Completion deadline stated in project record: 21/01/2028. This is distinct from registration validity and from the occupancy certificate status below.
Land and geographic identity
Locality / revenue village: SURARAM VILLAGE; the RERA record also spells the village “Suraram Villege”. The building-permit and OC extractions identify SURARAM.
Mandal: Qutballapur (also rendered Qutubullapur in the OC extraction).
District / PIN: Medchal-Malkajgiri, 500015.
Project survey numbers: 96/A, 97 & 98.
Survey subdivisions: The project filing names 96/A; it does not identify project-held subdivisions of 97 or 98. The land-record extract separately lists 96/అ, 97/అ, 97/ఆ, 97/ఇ, 97/ఈ, 98/అ, 98/ఆ/1, 98/ఆ/2, 98/ఆ/3 and 98/ఆ/4; the filing does not specify which subdivisions of 97 and 98 correspond to the project.
Plot numbers recorded: 96, 97, 116 & 117.
Site extent: 668.8 sq. m; the building-permit and OC records state 668.80 m2.
Net / total area: RERA land details show Total Area 668.8, Net Area 668.80, and affected area 00 sq. m.
Boundaries in RERA land details: East: ROAD WIDTH 9; West: ROAD WIDTH 9; North: PLOT NO 98 115; South: PLOT NO 95 118.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permit: Approval 2/C26/00070/2022, dated 21 January, 2022; file 2/C26/06782/2021.
Approved building description: Building - PROPOSED-1; 1 Stilt + 5 upper floors.
Approved built-up / floor area: Building-permit extraction: residential area 1,591.35 m2.
Approved height: 14.9 m.
Buildings / blocks: One building is shown in the RERA project record.
Parking provision in permit: Stilt parking area 344.51 m2; parking-space count is not supplied.
Approved versus RERA-declared units: GHMC approval states that sanctioned unit numbers must not be increased without prior approval, but the supplied permit extraction does not provide a unit count. TG-RERA records 20 units.
Offering and status
Unit type: 2BHK apartments.
RERA-filed saleable area: 93.83 sq. m per unit.
Booked / available: 0 booked / 20 available, as shown in the TG-RERA portal data supplied; the record has no booking-count as-of date, so these figures are indicative.
Construction stage: The supplied material does not establish current construction progress. The project record is labelled New Project; no independent site-progress verification is provided.
Original / revised completion date: Promoter’s Form B undertaking states 21/01/202.8 (as extracted); the project record and vendor description give 21/01/2028. No revised completion date is supplied.
Occupancy certificate: An OC for the residential apartment building is on file: GHMC approval 3155/GHMC/KPL/2024-OC, dated 17 October, 2024. The supplied OC extraction identifies the building at the project’s survey numbers and states it was inspected and declared fit for occupation.
2. The project story
The TG-RERA record describes a single-building residential apartment project, TULASI LAKE FRONT BLOCK 18, at Suraram Village, Qutballapur mandal, Medchal-Malkajgiri district. The registered site is identified by survey numbers 96/A, 97 & 98 and plot numbers 96, 97, 116 & 117, with a recorded extent of 668.8 sq. m.
The GHMC building-permit record provides for one residential building, 1 Stilt + 5 upper floors, with an approved residential area of 1,591.35 m2. The TG-RERA unit schedule records 20 2BHK apartments.
The supplied project file includes a GHMC occupancy certificate dated 17 October, 2024 for a residential apartment building at the same survey numbers. That is an authority-issued OC record; it should not be confused with the separate TG-RERA registration validity through 21/01/2028 or the project completion date stated in the filing. The available evidence does not establish the current on-site construction stage or independently verify present occupation.
3. Master plan, architecture & building design
The GHMC building permit identifies one proposed residential building with 1 Stilt + 5 upper floors, an approved height of 14.9 m, residential area of 1,591.35 m2, and stilt parking area of 344.51 m2. The site area in that record is 668.8 m2. These are approval-record figures, not saleable or carpet-area figures.
The RERA-filed project record lists one building and one proposed building unit, while the unit schedule records 20 apartments. The supplied permit extraction does not state flats per floor, lift or stair numbers, building footprint, detailed circulation, or a floor-by-floor unit schedule.
The permit lists 30 Trees, 5 rainwater-harvesting structures, a transformer space, a garbage house and an ETP requirement. It records Tot-lot 0 m2. No detailed landscape plan, open-space allocation or internal-road plan is available in the supplied evidence.
The later GHMC OC extraction records sanctioned floor area of 1,591.35 m2 and site-building-plan floor area of 1,698.09 m2. Full analysis of the recorded plan and site details is addressed in the approvals review; this overview reports the figures as stated in the OC record.
4. Homes, configurations & floor plans
TG-RERA records 20 2BHK units, with filed saleable area of 93.83 sq. m each; the portal snapshot shows 0 booked and 20 available, without an as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 93.83 sq. m | Software-measured median 62.1 sq. m; measured range 60.8–65.0 sq. m across 8 flat designs | 34% (software-derived from drawing measurements) |
The carpet-area measurements are software measurements from the floor-plan drawing, not TG-RERA disclosures; the supplied drawing record says they need review. The drawing measurement excludes the balcony, which is shown as 1.22 M. WIDE BALC; the cited plan panel also labels living, wash, dining/kitchen, two toilets, bedroom and master bedroom. The plan-derived room and area measurements should be checked against the drawing.
Saleable area and carpet area are different measures in this evidence: the RERA-filed figure is saleable area, while the floor-plan figure is software-measured carpet area. The supplied plan data describes saleable area as also accounting for a share of common areas. No separately filed balcony or utility area is provided.
5. Parking & vehicle circulation
The GHMC permit records 344.51 m2 of stilt parking area. The OC extraction also records parking area of 344.51 m2 under both the sanctioned-plan and site-building-plan entries. The supplied records do not give a parking-bay count, visitor or accessible-space count, two-wheeler provision, EV charging provision, or unit-wise parking allocations.
The permit extraction identifies road widths as 18 mt. and the RERA land details give east and west boundaries as ROAD WIDTH 9. The material supplied does not include a detailed vehicle-circulation plan or establish exclusive ownership or allocation of any parking bay.
6. Amenities, recreation & open spaces
The project amenity record lists facilities and services but shows 0% progress for each listed item; it does not provide independent verification that they have been completed. The GHMC permit separately lists specified site provisions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / recreational open space | 0 m2 in the permit and OC extracts | No recreational area shown in these records | |
| Trees | 30 Trees | Permit-listed provision; completion not verified | |
| Community buildings | Listed in RERA amenities; no size supplied | 0% recorded; not independently verified | |
| Green strip / tot-lot / park | Listed in RERA amenities; no size supplied | 0% recorded; not independently verified | |
| Internal roads & footpaths | Listed in RERA amenities; no size supplied | 0% recorded; not independently verified |
7. Utilities, building services & safety
The RERA amenity record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Water Conservation, Rain water Harvesting, Energy management, Fire Protection And Fire Safety Requirements, and Electrical Meter Room, Sub-Station, Receiving Station as available, but records 0% progress for each. It does not specify capacities, equipment or current operating status.
The GHMC permit requires rainwater-harvesting structures, transformer space, a garbage house and an ETP. The OC extraction also records rainwater harvesting. These entries evidence listed requirements or recorded provisions, not independent verification of their current operation.
The permit states that an occupancy fire NOC is to be obtained from the Director (EV&DM) before issue of the occupancy certificate. The supplied material does not include a fire NOC document, details of lifts or lift capacity, backup power, CCTV, access control, accessibility features, or a detailed waste-management system.
8. Location, access & connectivity
The registered location is Suraram Village, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500015; the registration certificate spells the village “Suraram Villege.” The building-permit and OC records refer to SURARAM and “Suraram Village-1.”
The RERA land details state ROAD WIDTH 9 on the east and west boundaries; the building-permit extraction records road widths of 18 mt. The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 11.1 km. No additional road, public-transport or landmark distances are provided.
9. Developer & development status
The registered promoter is TULASI CONSTRUCTIONS, identified in the RERA filing as a partnership. Its GSTIN is 36AAOFT0091L1ZQ. The project record supplies the promoter’s address as GANESH PLAZA, GANESH NAGAR, SURARAM VILLAGE, SURARAM VILLAGE, Qutballapur, Medchal-Malkajgiri, 500015; a separate office address in the registration certificate is Village: Quthbullapur-1, Mandal: Qutballapur, District: Medchal-Malkajgiri, Pin: 500054.
The RERA record names BODDU SUSMA, BODDU RAVI SHANKAR RAO and BODDU VENKATESWARA RAO as partners, and BODDU ASHOK as authorised signatory. The Form B declaration was made by BODDU ASHOK for the promoter and states a completion undertaking of 21/01/202.8 as extracted.
A current construction-progress report is not present in the supplied evidence. The vendor record describes the project as under construction, but that is a third-party description, not an independently verified site update. The project record’s stated completion date is 21/01/2028; the GHMC OC record separately documents an occupancy certificate for the residential apartment building.
10. Approvals, official records & documents
| Identifier / date | P02200004373; issued 04/04/2022; valid through 21/01/2028 |
|---|---|
| Scope and source | Project registration for TULASI LAKE FRONT BLOCK 18; survey numbers 96/A, 97, 98. |
| Identifier / date | 2/C26/00070/2022, dated 21 January, 2022; file 2/C26/06782/2021 |
|---|---|
| Scope and source | Residential building permit; survey numbers 96/A, 97, 98; one building, 1 Stilt + 5 upper floors. |
| Identifier / date | 3155/GHMC/KPL/2024-OC, dated 17 October, 2024; application 006417/GHMC/3056/KPL2/2024-OC |
|---|---|
| Scope and source | OC record for the residential apartment building at the project survey numbers; completion notice is recorded as submitted 10 June, 2024. |
| Identifier / date | 3155/GHMC/KPL/2024-OC, dated 17 October, 2024 |
|---|---|
| Scope and source | Additional extraction of the same stated approval number; identifies plots 96, 97, 116 & 117 and survey numbers 96/A, 97, 98. |
| Identifier / date | Dated 10/02 / 2022 |
|---|---|
| Scope and source | Promoter-filed declaration covering title basis, encumbrance statement, completion undertaking and project-account commitments. |
| Identifier / date | LRS/4629C-15/NZ/GHMC/2008 |
|---|---|
| Scope and source | Reference recorded in the GHMC permit extraction; an approved layout plan is not included as an extracted drawing in the supplied material. |
| Identifier / date | Document 217094 |
|---|---|
| Scope and source | Drawing-based measurements used for the software-measured carpet-area summary; not a RERA area disclosure. |
Other registrations of Tulasi Lake Front
Frequently asked questions
Is TULASI LAKE FRONT BLOCK 18 registered with Telangana RERA?
Yes. TULASI LAKE FRONT BLOCK 18 is registered with the Telangana Real Estate Regulatory Authority as P02200004373; the registration status is New Project.
Who is the developer of TULASI LAKE FRONT BLOCK 18?
The promoter named in the RERA registration is TULASI CONSTRUCTIONS.
Where is TULASI LAKE FRONT BLOCK 18 located?
TULASI LAKE FRONT BLOCK 18 is in SURARAM VILLAGE, Suraram Villege, Qutballapur, Medchal-Malkajgiri, Telangana (500015).
When will TULASI LAKE FRONT BLOCK 18 be completed?
The promoter's proposed date of completion filed with RERA is 21/01/2028. This is the promoter's declaration, not a guarantee.
More projects in Suraram Villege





