Tulasi Lake Front Block 19

TULASI CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200004363

TULASI LAKE FRONT BLOCK 19 is a residential apartment project in SURARAM VILLAGE, Qutballapur mandal, Medchal-Malkajgiri district, developed by registered promoter TULASI CONSTRUCTIONS, a partnership. The project has a land area of 668.8 sq.mts and one residential building with 1 Stilt + 5 upper floors. It comprises 20 2BHK apartments, each with a RERA-filed saleable area of 93.83 sq.m. Its TG-RERA registration number is P02200004363, issued 04/04/2022, and its proposed completion date is 21/05/2028.

More from Tulasi Constructions · 7 projects →

01What we found

RegisteredTG-RERA - valid till 21 Jan 2028
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameTULASI LAKE FRONT BLOCK 19 RERA record
Project type and useResidential apartment project RERA record RERA filing
Phase / registered portionRegistered as “BLOCK 19”; the supplied records do not describe a broader phase structure or define the registered portion beyond this name. RERA record
TG-RERA registrationP02200004363, granted under section 5; issued 04/04/2022. RERA record
Registration validityCertificate states validity from 04/04/2022 to 21/01/2028; no extension is recorded in the supplied certificate. Registration validity is distinct from the completion deadline and occupancy status.
Registered promoterTULASI CONSTRUCTIONS, partnership. RERA filing Corporate record
RERA-record statusRegistered project; the registration certificate is on file. RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageLocality: SURARAM VILLAGE; revenue village is recorded as Suraram Villege in the project header and SURARAM in the GHMC documents. RERA record RERA filing
Mandal / district / PINQutballapur / Medchal-Malkajgiri / 500015. RERA record RERA filing
Survey numbers96/A, 97 & 98; the supplied records do not give further project-held subdivision numbers. RERA record Land records
Plot numbers on registration certificate98,99,114 & 115.
Registered site extent668.8 (registration record); the GHMC permit identifies the site extent as 668.8 m2. Land records
Total / net site areaTotal area 668.8 sq.mts and net area 668.80 sq.mts in the project land details. RERA filing
Boundaries in project filingEast: ROAD WIDTH 9; West: ROAD WIDTH 9; North: PLOT NO 100 113; South: PLOT NO 97 116. RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building permitApproval No. 2/C26/00071/2022, approved 21 January, 2022; file No. 2/C26/04623/2021. Approvals record
Approved building configurationOne residential building, 1 Stilt + 5 upper floors; approved height 14.9 m.
Approved built-up areaGHMC permit records residential area 1,591.35 m2.
Building / block countOne building is recorded in the project filing; the permit describes “Building - PROPOSED-1.” RERA filing
Parking levels / approved provisionStilt parking area 344.51 m2 is recorded in the permit. A sanctioned space count is not supplied.
Unit countsGHMC-sanctioned building details record a unit cap but the supplied extraction gives no sanctioned count. RERA records 20 units; all are listed as 2BHK. RERA unit table

Offering and status

ItemRecord
RERA-filed configuration and saleable area2BHK, 93.83 sq.m saleable area per unit. RERA unit table
RERA portal inventory20 total, 0 booked and 20 available in the last-read portal data; that record has no as-of date, so counts are indicative. RERA unit table
Construction / completion statusThe registration record gives a proposed completion date of 21/05/2028; the Form B declaration gives a completion undertaking recorded as 21/01/202.8 (as extracted). The supplied GHMC occupancy certificate records completion date 25/04/2025 and certifies the inspected building fit for occupation. RERA record
Occupancy certificateGHMC Occupancy Certificate No. 000590/GHMC/00472/SWOC/KPL2/2025, approved 30/05/2025, for the residential apartment at Suraram on 96/A, 97 and 98. Approvals record
Registration validity vs completion vs OCRERA registration is stated to run to 21/01/2028; the project header proposes completion by 21/05/2028; the supplied GHMC certificate records an OC for the building. These are distinct record fields and statuses. RERA record

2. The project story

  • TULASI LAKE FRONT BLOCK 19 is recorded with TG-RERA as a residential apartment project in Suraram, Qutballapur mandal, Medchal-Malkajgiri district, on survey numbers 96/A, 97 and 98. The project filing describes one building and 20 two-bedroom apartments; the GHMC building permit describes a stilt and five upper floors. RERA record Land records RERA unit table
  • The RERA inventory snapshot lists all 20 apartments as available and none booked, but has no recorded as-of date. It should therefore be treated as an indicative portal snapshot, not a current unit-by-unit sales confirmation. RERA unit table
  • The GHMC-issued occupancy certificate identifies a residential apartment building on the same survey numbers and records the inspected building as fit for occupation. It is an authority-issued certificate, not an independent site inspection for this report. The project’s RERA registration validity, proposed completion date and the OC record should be read separately. RERA record

3. Master plan, architecture & building design

  • The filed GHMC building permit describes one proposed residential building, “Building - PROPOSED-1,” on a site extent of 668.8 m2, with 1 Stilt + 5 upper floors and an approved height of 14.9 m. The sanctioned residential area is recorded as 1,591.35 m2; the permit also lists 344.51 m2 of stilt parking area. These are approval-document figures, not RERA saleable or carpet-area figures.
  • The permit lists 30 Trees, a tot-lot, a rain-water-harvesting structure, transformer space, a garbage house and an ETP. It also requires a fire NOC before issue of an occupancy certificate. These are recorded as permit provisions/conditions; the supplied evidence does not establish the present completion or operation of each feature.
  • A project filing records one approved building unit and one proposed building unit. The supplied drawing-derived material includes one measured floor-plan document and one drawing awaiting scan review; it does not provide a complete architectural schedule of entries, lifts, stairs, floor-by-floor unit arrangement, open-space areas or common-area distribution. RERA filing Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002093.83 sq.m60.8–65.0 sq.m; median 62.1 sq.m (software-measured from drawings)34%
  • RERA records the 2BHK saleable area as 93.83 sq.m. The carpet measurements are software-derived from the supplied floor-plan drawing geometry, cover 8 measured flat designs, and are not RERA-filed measurements; the record flags them for review. RERA unit table Floor plans
  • For one measured flat, the drawing lists a living/dining room of 3.02 × 6.41 m, two bedrooms of 3.02 × 3.47 m and 3.04 × 3.07 m, a kitchen of 2.29 × 3.04 m, two toilets of 1.56 × 1.86 m and 1.55 × 1.86 m, and a wash area of 1.11 × 3.04 m. These are drawing-based software measurements, not RERA disclosures. RERA unit details
  • Carpet area refers to the usable area measured within the apartment under the supplied drawing analysis; saleable area is the RERA-filed unit area and may include the unit’s share of common areas. The supplied data does not provide a RERA-filed carpet area or a separately verified loading calculation. RERA unit table Floor plans

5. Parking & vehicle circulation

  • The GHMC permit records 344.51 m2 of stilt parking area. The supplied project data does not establish a sanctioned parking-space count, visitor or accessible spaces, a separate two-wheeler provision, EV charging, ramp or driveway layout, or unit-specific parking allocations. A parking area on a permit does not by itself establish exclusive allocation to any apartment. RERA amenities

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lotSize not suppliedGHMC permitListed as a permit provision; completion not established.
Green strip / tot-lot / parkSize not suppliedRERA amenities recordListed; progress shown as 0%. RERA amenities
Rain-water harvestingPercolation pit; permit lists 5 RWHPsGHMC permit; RERA amenities recordRequired/listed; completion not established. RERA amenities
Trees30 TreesGHMC permitPermit figure; planting or current condition not established.
Community buildingsNo size or facility description suppliedRERA amenities recordListed; progress shown as 0%. RERA amenities
Internal roads and footpathsNo dimensions suppliedRERA amenities recordListed; progress shown as 0%. RERA amenities

No clubhouse or specific indoor or sports facility is described in the supplied evidence. The amenities progress percentages are RERA-record fields and are not independent verification of site completion. RERA amenities

7. Utilities, building services & safety

  • The RERA amenities record marks water supply, sewerage, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/sub-station/receiving station as available, but records 0% progress for each. The GHMC permit lists a rain-water-harvesting percolation pit, transformer space, garbage house and ETP; it does not provide capacities or confirm current operation. RERA amenities
  • The permit also lists storm-water drains, sewage/sullage treatment and disposal, solid-waste management, and fire-safety requirements as project provisions. It requires a fire NOC from the Director (EV&DM) before issue of an occupancy certificate and states that an occupancy certificate is compulsory before occupation. The supplied evidence does not provide lift details, backup-power capacity, water-storage or treatment capacities, CCTV/security systems, accessibility provisions or emergency-access specifications. RERA amenities

8. Location, access & connectivity

  • The registered project location is SURARAM VILLAGE, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500015. The GHMC permit describes the site as Suraram and records a road width of 18 mt.; the project filing lists roads of width 9 on the east and west boundaries, without specifying units for those boundary entries. RERA record RERA filing RERA filing
  • The supplied location record places the cadastral parcel centroid at 17.54056, 78.43449 and gives the nearest sampled Outer Ring Road interchange at approximately 11.1 km. No public-transport details, other landmark distances or travel-time measurements are supplied. Location record

9. Developer & development status

  • The registered promoter is TULASI CONSTRUCTIONS, identified in the filing as a partnership. Its listed partners are BODDU SUSMA, BODDU RAVI SHANKAR RAO and BODDU VENKATESWARA RAO; BODDU ASHOK is recorded as authorised signatory. GSTIN is 36AAOFT0091L1ZQ. Corporate record RERA filing Parties record
  • The project record gives a proposed completion date of 21/05/2028. The Form B declaration by authorised signatory Boddu Ashok, dated 10/02/2022, records a completion undertaking extracted as 21/01/202.8. The supplied GHMC OC document records building completion date 25/04/2025 and an occupancy certificate for the residential apartment. These records describe different filing and authority fields; this overview does not independently verify physical construction progress. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200004363, issued 04/04/2022; valid to 21/01/2028
EvidenceRegistration certificate, Form C.
GHMC building permit
Identifier / dateApproval No. 2/C26/00071/2022, approved 21 January, 2022; File No. 2/C26/04623/2021
EvidenceConditional building permit for a residential building.
GHMC occupancy certificate
Identifier / dateApproval/proceedings No. 000590/GHMC/00472/SWOC/KPL2/2025, approved 30/05/2025
EvidenceCertificate for the residential apartment on survey numbers 96/A, 97 and 98.
RERA project declaration
Identifier / dateForm B, dated 10/02/2022
EvidencePromoter declaration by Boddu Ashok, authorised signatory.
Other filed project documents
Identifier / dateTitle report, title-chain documents, encumbrance statement, draft agreement for sale and layout-plan document listing
EvidenceRERA document register; the layout-plan entry is not extracted as an approval drawing in the supplied data. Document index
Layout-plan reference in permit
Identifier / dateLRS 4629/C-15/NZ/GHMC/2008
EvidenceIdentifier listed in the building-permit record.

The supplied evidence does not include an extracted approved layout drawing or a complete set of architectural floor plans. The plan-related records above identify the documents and approval references available in the project file; they do not reproduce all sanctioned conditions or establish the completion status of individual amenities. Document index

Other registrations of Tulasi Lake Front

Frequently asked questions

Is TULASI LAKE FRONT BLOCK 19 registered with Telangana RERA?

Yes. TULASI LAKE FRONT BLOCK 19 is registered with the Telangana Real Estate Regulatory Authority as P02200004363; the registration status is New Project.

Who is the developer of TULASI LAKE FRONT BLOCK 19?

The promoter named in the RERA registration is TULASI CONSTRUCTIONS.

Where is TULASI LAKE FRONT BLOCK 19 located?

TULASI LAKE FRONT BLOCK 19 is in SURARAM VILLAGE, Suraram Villege, Qutballapur, Medchal-Malkajgiri, Telangana (500015).

When will TULASI LAKE FRONT BLOCK 19 be completed?

The promoter's proposed date of completion filed with RERA is 21/05/2028. This is the promoter's declaration, not a guarantee.