Silver Oaks Phase II

SHATHABDHI TOWNSHIPS PVT LTD · Rangareddy · RERA P02400002917

SILVER OAKS PHASE II is a plotted residential development in Maheshwaram, Maheshwaram Mandal, Ranga Reddy District, developed by the registered promoter SHATHABDHI TOWNSHIPS PVT LTD. The registered site area is 27001.33 sq. m, and the layout drawing identifies 85 numbered residential plots; plot configurations are not supplied. The project is registered under TG-RERA P02400002917, issued 14/05/2021, with a proposed completion date of 19/06/2025.

More from Shathabdhi Townships Pvt Ltd · 21 projects →

01What we found

Period endedTG-RERA registration ran to 19 Jun 2025 - check its extension on TG-RERA
10documents on file - each fact links to its page
1court case on this project's land (survey 158, Maheshwaram)
11items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemProject record
Registered nameSILVER OAKS PHASE II RERA record
Project typePlotted residential development / open-plot layout RERA record
Phase / registered portionPhase II; TG-RERA registration is for the project identified above. The supplied record does not separately describe other registered phases. RERA record
TG-RERA registrationP02400002917, issued 14/05/2021; certificate states a four-year validity period ending 19/06/2025. The supplied record shows no extension. RERA record
Registered promoterSHATHABDHI TOWNSHIPS PVT LTD RERA record Corporate record
RERA statusThe registration period stated in the certificate has ended; no extension is shown in the supplied evidence. This is registration validity, not a finding about physical completion or occupancy status.

Land and geographic identity

ItemProject record
LocalityMaheshwaram RERA record RERA filing
Revenue villageTooprakhurd / Thuprakhurdu as named in the HMDA layout documents; the project filing identifies Maheshwaram. RERA filing
Mandal / district / PINMaheshwaram / Ranga Reddy / 509325 RERA record
Survey number and subdivisionSurvey No. 158/P RERA record Land records
Registered site extent27001.33 sq. m RERA filing
Total and net site areaTotal Site area 27001.33 sq. m; Net Site Area 27001.33 sq. m
BoundariesNorth, south, east and west: “NEIGHBOURS LAND” in the project filing. RERA filing
HMDA plan identifierLayout Permit No. 000171/LO/Plg/HMDA/2019

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal approvalHMDA Layout Permit No. 000171/LO/Plg/HMDA/2019, dated 19 June 2019; final layout letter dated 03 October 2022.
Approved built-up area15454.13 sq. m is recorded as “Approved Built up Area” in the RERA filing; for this plotted layout, the layout drawing separately labels 15454.13 sq. m as plotted area. These are the supplied labels, not a statement that they are interchangeable. RERA filing Layout record
Buildings / floor configurationNot disclosed in the supplied project record; the approval is for a residential open-plot layout, with individual dwelling permissions to be considered separately.
ParkingNo project-wide parking count or parking-level provision is supplied. RERA filing
Plot count85 plots, plot numbers read from the layout drawing as 1 to 85; software/drawing-derived count, to be checked against the drawing. Plot sizes are not available in the supplied extraction. Layout record
Approved versus RERA-declared unitsThe layout drawing indicates 85 numbered plots. A separate RERA unit inventory/count is not supplied. Layout record

Offering and status

ItemProject record
Offered productResidential plots; individual plot sizes, price range, and booked/available counts are not supplied. RERA record Layout record
Promoter completion undertaking19/06/2025, declared in the Form B affidavit.
Construction / development stageNo current, independently verified site-progress figure is supplied. RERA amenity entries show 0% progress for listed items; this is the filed progress figure in the supplied data, not an independent site inspection. RERA amenities
Completion / occupancy recordHMDA issued a final layout letter dated 03 October 2022. The supplied records do not establish an occupancy certificate for completed individual dwellings or a project-wide building OC.

The project story

  • SILVER OAKS PHASE II is registered as a plotted residential development on Survey No. 158/P, at Tooprakhurd/Thuprakhurdu, Maheshwaram Mandal, Ranga Reddy District. The HMDA documents describe an open-plot layout, rather than an apartment or multi-tower scheme. RERA record
  • The layout plan identifies 85 numbered plots, along with roads, parks/open space and social infrastructure. The drawing-derived plot count is software-read from the plan and should be checked against the approved drawing; plot-size details are not available in the supplied extraction. Layout record
  • HMDA’s record includes a draft layout letter dated 19 June 2019 and a final layout letter dated 03 October 2022. The final letter records that roads and open spaces were taken over by the local authority under registered gift deed No. 11511/2021, and refers to relinquishment deed No. 15262/2022 concerning mortgaged plots.
  • The promoter declared a completion date of 19/06/2025 in its Form B affidavit. The evidence supplied does not provide an independently verified construction-progress update or establish completion of individual homes. The layout approval is not evidence that a dwelling house on any particular plot has been separately approved or completed. RERA amenities

Master plan, architecture & building design

This is a plotted layout, so the available design evidence concerns plot arrangement and site land uses rather than building plans or apartment floor configurations.

The HMDA draft layout’s area statement records a total and net site area of 27001.33 sq. m, with 15454.13 sq. m plotted area, 8445.1 sq. m layout road area, 2420.36 sq. m park area and 681.61 sq. m open space; amenities area is recorded as 0. Social infrastructure is listed in the area statement without a corresponding area in the supplied extraction.

The software-read layout data separately labels the uses as plots, roads, parks/open space, and social infrastructure, and records 85 numbered plots. These are drawing-derived figures, not a complete plot schedule: no plot sizes were extracted, and the drawing data itself says the plot information is incomplete. Layout record

HMDA’s final layout letter states that the approved layout is for residential dwelling houses. It says individual building permission is to be considered separately under the applicable building rules; building count, building heights, floor configuration and dwelling designs are not supplied here.

Homes, configurations & floor plans

The RERA record identifies a plotted development. The supplied data does not include plot-wise RERA saleable areas, plot-size bands, booking status, or a measured plot schedule. The layout drawing identifies 85 plots by number, 1 to 85; this is a software-read count and should be verified against the drawing. RERA record Layout record

The floor-plan data contains two layout sheets and reports no apartment-floor plans or measured apartment areas. Consequently, no apartment configuration or carpet-area comparison applies on the available evidence. Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots85 numbered plots (drawing-derived)Not suppliedNot suppliedNot suppliedNot applicable / not suppliedNot supplied

Parking & vehicle circulation

The HMDA draft layout requires roads to be formed and kept open for access, and requires footpaths, including pedestrian space along roads. It also refers to cycle tracks. These are approval conditions; the supplied records do not establish their present completion.

No sanctioned or RERA-filed parking-space count, visitor or accessible parking provision, EV charging provision, parking allocation arrangement, or individual plot parking entitlement is supplied. A project-wide parking count or spaces-per-plot ratio therefore cannot be established from this evidence. RERA filing

Amenities, recreation & open spaces

The RERA amenities data lists internal roads and footpaths, water supply, sewerage, storm-water drains, a green strip/tot lot/park, street lighting, solid-waste management, rainwater harvesting, energy management, electrical facilities and recreational open space. Each listed item has a progress entry of 0% in the supplied data; this is not an independent site verification. RERA amenities

Parks / open space
Description / sizeHMDA area statement: park 2420.36 sq. m and open space 681.61 sq. m.
Evidence sourceHMDA draft layout area statement
Declared progress / verified statusRERA amenity progress is 0%; completion not independently verified. RERA amenities
Social infrastructure
Description / size681.61 sq. m in the drawing-derived layout land-use schedule; the HMDA area statement lists “Social Infrastructure” without a supplied area. Layout record
Evidence sourceHMDA draft layout / drawing-derived schedule
Declared progress / verified statusProgress not established.
Community buildings
Description / sizeListed in the RERA amenities data without an “available” value or size. RERA amenities
Evidence sourceRERA amenities data
Declared progress / verified statusProgress entry: 0%; not independently verified.
Internal roads and footpaths
Description / sizeRequired by the HMDA conditions; road area 8445.1 sq. m in the draft layout area statement.
Evidence sourceHMDA draft layout and RERA amenities data
Declared progress / verified statusRERA progress entry: 0%; not independently verified.
Landscaping / avenue planting
Description / sizeHMDA conditions refer to greenery, avenue plantation and planting in public open spaces.
Evidence sourceHMDA layout conditions
Declared progress / verified statusRequired condition; completion not independently verified.
Promoter-marketed facilities
Description / sizeClubhouse, swimming pool, landscaping, park with children’s play area and security are listed on the promoter/vendor record. Promoter website
Evidence sourcePromoter/vendor material
Declared progress / verified statusMarketing claims; not established as sanctioned or delivered by the supplied project documents.

Utilities, building services & safety

  • HMDA’s draft layout conditions call for a protected water supply, including an overhead tank and sumps; sewerage disposal; storm-water drainage; underground ducting for utilities; street lighting; and a transformer yard. The final layout letter also lists water supply, sewerage, drainage disposal systems, street lighting, rainwater-harvesting structures and civic amenities. These are approval-document references, not verification that the facilities have been completed or are operating.
  • The HMDA draft conditions specify a septage-treatment mechanism for layouts under 10 acres and an STP for layouts over 10 acres, and include solid-waste disposal and source-segregation provisions. The supplied record does not identify a specific treatment installation, capacity, operating status, or service connection for this layout.
  • The RERA amenities record lists water supply, sewerage, storm-water drains, solid-waste management, rainwater harvesting, energy management and electrical meter room/sub-station/receiving station, each with a 0% progress entry. It does not provide capacities, detailed equipment specifications or verified completion status. Fire-protection and fire-safety requirements are listed without an “available” value; no specific system or clearance is documented in the supplied material. RERA amenities
  • No evidence supplied establishes completed security systems, accessibility features, or building-level lifts or fire-escape arrangements. The project is a plotted layout, and individual dwelling service and safety details are not provided here.

Location, access & connectivity

  • The project filing identifies Maheshwaram, Maheshwaram Mandal, Ranga Reddy District, PIN 509325, and Survey No. 158/P. The HMDA layout documents identify the site at Tooprakhurd/Thuprakhurdu. RERA record RERA filing
  • The supplied location data gives the nearest sampled Outer Ring Road interchange at 7.0 km (approx.). The promoter/vendor material separately describes access to the Hyderabad–Shadnagar–Bangalore Highway, Timmapur Terminal, Symbiosis University and the airport, but provides no measured distances in the supplied evidence. Location record Promoter website

Developer & development status

  • The registered promoter is SHATHABDHI TOWNSHIPS PVT LTD, identified in the project record as a company. The HMDA draft and final layout letters name the company as applicant, represented by managing director K Srinivas Reddy; the RERA Form B affidavit is signed by K. Srinivas Reddy on the company’s behalf. Corporate record
  • The registration certificate lists the promoter’s office as Village: AMBEDKAR NAGAR (Banjara Hills), Mandal: Shaikpet, District: Hyderabad, Pin: 500034. A different address is also present in the project filing, but no additional verified contact details are supplied here.
  • The promoter’s Form B affidavit declares a completion date of 19/06/2025. No revised completion date or extension is shown in the supplied evidence. The RERA amenity data records 0% progress for listed facilities, and no independent site inspection or current progress certificate is supplied. RERA amenities

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400002917; issued 14/05/2021; certificate states validity ending 19/06/2025
What the supplied record establishesForm C registration for SILVER OAKS PHASE II; no extension is shown in the supplied evidence.
HMDA draft layout letter
Identifier / dateLayout Permit No. 000171/LO/Plg/HMDA/2019; 19 June 2019
What the supplied record establishesDraft layout letter for an open-plot layout in Survey No. 158/P; includes development conditions and a mortgage of 13 plots.
HMDA final layout letter
Identifier / dateFile No. 053598/LT/SMD/FLT/U6/HMDA/30032022; 03 October 2022
What the supplied record establishesFinal residential open-plot layout approval for 27,001.33 sq. m in Survey No. 158/P, subject to conditions.
RERA Form B declaration
Identifier / date22-3-2021
What the supplied record establishesPromoter declaration concerning title, encumbrances, project funds and completion by 19/06/2025.
Layout drawing
Identifier / dateDocument 103093
What the supplied record establishesApproved layout drawing is identified in the project record; the supplied extraction is not a complete plot schedule.
Gift deed and relinquishment deed referenced by HMDA
Identifier / dateGift deed No. 11511/2021, dated 10-06-2021; relinquishment deed No. 15262/2022, dated 1/8/2022
What the supplied record establishesHMDA final letter records the roads/open spaces as taken over by the local authority under the gift deed and refers to relinquishment concerning mortgaged plots.
Individual dwelling approvals / completion certificates
Identifier / dateNot supplied
What the supplied record establishesHMDA’s final letter states that individual building permission is to be considered separately. No individual dwelling approval or building OC is established by the supplied evidence.

Other registrations of Silver Oaks

Frequently asked questions

Is SILVER OAKS PHASE II registered with Telangana RERA?

Yes. SILVER OAKS PHASE II is registered with the Telangana Real Estate Regulatory Authority as P02400002917; the registration status is New Project.

Who is the developer of SILVER OAKS PHASE II?

The promoter named in the RERA registration is SHATHABDHI TOWNSHIPS PVT LTD.

Where is SILVER OAKS PHASE II located?

SILVER OAKS PHASE II is in MAHESWARAM, Maheshwaram, Rangareddy, Telangana (509325).

When will SILVER OAKS PHASE II be completed?

The promoter's proposed date of completion filed with RERA is 19/06/2025. This is the promoter's declaration, not a guarantee.

More projects in Maheshwaram