CHIRRA INFRA DEVELOPERS PVT LTD · Rangareddy · RERA P02400003060

CHIRRA COUNTRY is a plotted development in LEMOOR, Kandukur mandal, Ranga Reddy district, developed by registered promoter CHIRRA INFRA DEVELOPERS PVT LTD. The registered site extent is 26948.77 sqmts, with affected area of 1146.05 sqmts and net area of 25802.72 sqmts; the offering is plots, with no RERA-filed plot count or plot-size range disclosed. Vendor-reported plot sizes are 1615 sq.ft and 2185 sq.ft. The project is registered under TG-RERA **P02400003060**, with proposed completion **29/03/2024**.

01What we found

Period endedTG-RERA registration ran to 29 Mar 2024 - check its extension on TG-RERA
9documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Lemoor, Kandukur, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameCHIRRA COUNTRY
Project typePlotted development / open-plot layout RERA record
Phase / registered portionNo separate phase name is disclosed; the registration covers the plotted layout identified in Survey Nos. 134/PART and 135 /PART.
TG-RERA registrationP02400003060
Registration validity17/06/2021 to 29/03/2024; the certificate says validity could be extended by the Authority, but records no extension. This is registration validity, not a statement of current construction or occupancy status.
Registered promoterCHIRRA INFRA DEVELOPERS PVT LTD
RERA status in supplied recordRegistration certificate issued; no extension is recorded on the certificate. Current registration status is not independently established by the supplied certificate.

Land and geographic identity

ItemRecord
Locality / revenue villageLEMOOR (also styled Lemoor in the layout letter); one revenue village is identified. RERA record
MandalKandukur RERA record
DistrictRanga Reddy RERA record
PIN501359 RERA record
Project survey numbers134/PART and 135 /PART
Registered site extentThe supplied project identity records a total area of 26948.77 sqmts, affected area of 1146.05 sqmts, and net area of 25802.72 sqmts. RERA filing
Layout-letter area figuresThe HMDA draft layout letter states total site area 26948.75, master plan road affected area 1044.5, and net site area 25802.72 Sq.m.
BoundariesEast: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: ROAD. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal layout approvalLayout Permit No. 000173/LO/Plg/HMDA/2021, dated 30 March, 2021; the document is described as a Draft layout Letter for an open-plot layout.
Approved built-up area15520.36 sqmts is reported in the RERA project information as approved built-up area; the supplied layout letter instead identifies 15520.36 as plotted area. These are reported as labelled in their respective records, not treated as equivalent measures. RERA filing
Plots / layout arrangementThe supplied material does not establish a total plot count or plot-size schedule.
Buildings / floorsNot applicable as a plotted-layout offering; no building or floor configuration is disclosed. RERA record
Layout land-use figures in the draft letterPlotted area 15520.36; open space 650.18; layout road area 7350.38; amenities area 0; any other 0; park 2280.9; social infrastructure ILLEGIBLE.

Offering and status

ItemRecord
Unit typePlots; no RERA-filed unit count or RERA-filed plot-size range is available in the supplied material. RERA record
Vendor-reported plot sizes1615 sq.ft and 2185 sq.ft saleable; these are vendor-supplied details, not established here as RERA-filed plot sizes. Promoter website
Booked / available countsNot disclosed in the supplied project data. RERA unit table
Construction / development stageA project-wide, independently verified stage is not supplied. The RERA filing identifies a new project; the HMDA document is a draft layout letter with development conditions. RERA record
Completion datesRERA project information lists proposed completion 29/03/2024. The promoter’s Form B declaration undertakes completion by 30/09/2024. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied records. The available HMDA document is a draft layout letter, not an occupancy certificate. Document index

2. The project story

CHIRRA COUNTRY is registered as a plotted development at LEMOOR village, Kandukur mandal, Ranga Reddy district, on Survey Nos. 134/PART and 135 /PART. The supplied TG-RERA certificate identifies the project and its promoter; the HMDA-filed material describes an open-plot layout proposal under Layout Permit No. 000173/LO/Plg/HMDA/2021.

The layout letter describes plots, roads, parks and open space, with infrastructure works including road formation, drainage, water-supply lines and electrical services. It also states that the draft permission is not the final layout release and sets conditions relating to development and release of the final layout. The supplied documents do not establish the number of plots sold, the current construction or infrastructure completion stage, or whether the final layout was issued.

The RERA certificate’s registration period ended on 29/03/2024, while the RERA project information gives proposed completion as 29/03/2024 and the promoter’s Form B states completion by 30/09/2024. These dates concern registration validity and completion declarations respectively; the supplied material does not establish actual completion or occupancy certification. RERA record

3. Master plan, architecture & building design

This is a plotted layout rather than a multi-storey residential building project. The HMDA draft layout letter identifies total site area 26948.75, master plan road affected area 1044.5, and net site area 25802.72 Sq.m. It lists plotted area 15520.36, open space 650.18, layout road area 7350.38, park 2280.9, amenities area 0, and any other area 0; the social-infrastructure figure is illegible in the extraction.

The RERA filing separately labels 15520.36 sqmts as approved built-up area. The HMDA letter labels the same figure as plotted area; this overview preserves each source’s stated label and does not treat the figures as interchangeable. No plot layout drawing, plot count, plot dimensions, road-by-road plan, or final approved layout plan is available in the supplied material. RERA filing

The HMDA letter describes development works including roads, storm-water drainage, underground drainage and a common septic tank / STP, internal water-supply lines, overhead tank, electrical lines and street lights, avenue planting, park development and rainwater-harvesting pits. These are specified works/conditions in the draft layout letter, not confirmation that they have been completed.

4. Homes, configurations & floor plans

The project offering is plots. The supplied RERA material does not provide a plot inventory table with unit counts, booked or available counts, or RERA-filed plot areas. RERA record RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
PlotNot disclosedNot disclosedNot disclosedNot disclosedNot applicable / not suppliedNot supplied

Vendor information lists plot sizes of 1615 sq.ft and 2185 sq.ft as saleable areas; these are vendor-reported, not RERA-filed measurements in the supplied evidence. The drawing data contains two drawings and identifies both as having no flats; it provides no plot measurement or software-measured carpet area. Promoter website Floor plans

5. Parking & vehicle circulation

No car or two-wheeler parking count, visitor or accessible parking allocation, parking layout, or plot-specific parking arrangement is established by the supplied project records. The vendor lists “covered car parking,” but no supporting quantity or layout evidence is supplied; it is therefore a vendor-reported feature only. Promoter website

The HMDA draft layout conditions refer to internal roads, road accessibility and development of footpaths, but the supplied material does not provide a detailed circulation drawing, ramp arrangement, pedestrian-separation plan or EV-charging provision.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park2280.9 in the HMDA draft layout letterDraft layout land-use scheduleIncluded in the draft layout record; completion not established
Open space650.18 in the HMDA draft layout letterDraft layout land-use scheduleIncluded in the draft layout record; completion not established
Green strip / tot lot / parkListed as available “YES”; reported progress 0%RERA-filed amenity data RERA amenitiesDeclared in filing; progress recorded as 0%
Community buildingsListed; reported progress 0%RERA-filed amenity data RERA amenitiesProgress recorded as 0%; no facility size or completion evidence supplied
Internal roads and footpathsListed as available “YES”; reported progress 0%RERA-filed amenity data RERA amenitiesDeclared in filing; progress recorded as 0%
Clubhouse, swimming pool, gym, children’s play area and large green areaListed by vendor; no sizes or quantities suppliedVendor Promoter websiteVendor-reported; not established as sanctioned or completed
Kids’ play areas / sand pitsListed by vendorVendor Promoter websiteVendor-reported; no independent completion evidence

The draft layout letter also describes park development and avenue plantation as layout works. The supplied evidence does not independently verify completion of the park, open spaces or vendor-listed recreation facilities.

7. Utilities, building services & safety

Water
Evidence in supplied recordHMDA draft conditions call for an assured water-supply source, protected water supply, internal water-supply lines, an overhead tank and sumps. RERA-filed amenity data lists water supply with progress 0%. RERA amenities
Status / limitationSpecified / filed; no source, storage capacity or completed-service verification supplied
Sewerage and drainage
Evidence in supplied recordDraft conditions describe underground drainage, a common septic tank / STP, independent sewerage disposal, storm-water drains and rainwater harvesting pits. RERA-filed amenity data lists sewerage and storm-water drains with progress 0%. RERA amenities
Status / limitationProposed / filed; no capacity, commissioning or completion evidence supplied
Electrical
Evidence in supplied recordDraft conditions call for electrical supply lines, transformer and street lighting. RERA-filed data lists street lighting with progress 0%. RERA amenities
Status / limitationSpecified / filed; no supply capacity or completion evidence supplied
Solid waste
Evidence in supplied recordDraft conditions refer to space for solid-waste disposal, a bio-compost unit and source segregation; RERA-filed waste-management progress is 0%. RERA amenities
Status / limitationSpecified / filed; implementation and operating status not established
Water conservation
Evidence in supplied recordDraft conditions include rainwater-harvesting pits; RERA-filed water-conservation / rainwater-harvesting progress is 0%. RERA amenities
Status / limitationSpecified / filed; completion not established
Fire and safety
Evidence in supplied recordRERA-filed amenity data lists fire protection and fire-safety requirements with progress 0%; the vendor also lists fire safety. RERA amenities Promoter website
Status / limitationNo system details, clearances or completion evidence supplied
Other services
Evidence in supplied recordThe RERA-filed amenity record lists energy management and electrical meter room / sub-station / receiving station, each with progress 0%. RERA amenities
Status / limitationNo design detail or completion evidence supplied

8. Location, access & connectivity

The registered project location is LEMOOR, Kandukur mandal, Ranga Reddy district, Telangana, PIN 501359. The project is identified on Survey Nos. 134/PART and 135 /PART. RERA record

The supplied location data gives the Outer Ring Road nearest sampled interchange as approximately 11.5 km and the Primary Health Centre, Lemoor as 0.0 km. The project data also identifies the southern boundary as a road. No approach-road name, public-transport route or verified travel-time information is supplied. Location record RERA filing

9. Developer & development status

The registered legal promoter is CHIRRA INFRA DEVELOPERS PVT LTD, identified as a company. The supplied records name CHIRRA RAMAKRISHNA REDDY as an authorized signatory and director; the HMDA draft layout letter names CHIRRA RAMA KRISHNA REDDY as managing director representing the applicant. Corporate record Parties record

The registration certificate gives the promoter office as Village: Peerjadiguda, Mandal: Medipally, District: Medchal­Malkajgiri, Pin: 500098. The promoter address in the project filing is Annapurna Colony, LEMOOR, Kandukur, Ranga Reddy, PIN 501359. No official website or contact details are supplied. Parties record

The promoter’s Form B declaration dated 26 day of April 2021 undertakes project completion by 30/09/2024. The supplied material does not include verified construction progress, a final layout release, or an occupancy/completion certificate.

10. Approvals, official records & documents

TG-RERA registration certificate
DetailsForm C; P02400003060; issued 17/06/2021; stated validity to 29/03/2024, unless extended by the Authority
HMDA layout permission
DetailsDraft layout Letter; Layout Permit No. 000173/LO/Plg/HMDA/2021; approved date 30 March, 2021; open-plot layout for Survey Nos. 134/PART and 135/PART
HMDA application
Details030816/SMD/LT/U6/HMDA/21112019; application date 21 November, 2019
Promoter declaration
DetailsForm B affidavit dated 26 day of April 2021, including the promoter’s title, encumbrance and completion declarations
Layout and construction drawings
DetailsThe listed layout-plan document is not extracted; no approved plot drawing is supplied in the reviewed material.
Completion / occupancy documentation
DetailsNo completion certificate or occupancy certificate supplied
EvidenceDocument index
HMDA layout lookup
DetailsPublic approved-layout lookup was unavailable in the supplied record; this does not establish whether a final layout was issued.
EvidenceHMDA

Frequently asked questions

Is CHIRRA COUNTRY registered with Telangana RERA?

Yes. CHIRRA COUNTRY is registered with the Telangana Real Estate Regulatory Authority as P02400003060; the registration status is New Project.

Who is the developer of CHIRRA COUNTRY?

The promoter named in the RERA registration is CHIRRA INFRA DEVELOPERS PVT LTD.

Where is CHIRRA COUNTRY located?

CHIRRA COUNTRY is in LEMOOR, Kandukur, Rangareddy, Telangana (501359).

When will CHIRRA COUNTRY be completed?

The promoter's proposed date of completion filed with RERA is 29/03/2024. This is the promoter's declaration, not a guarantee.

More projects in Lemoor