Psr County

PANNALA SHRUTHI REDDY AND GORIGE YADAIAH · Rangareddy · RERA P02400007951

PSR COUNTY is a residential plotted development in Lemoor, Kandukur mandal, Ranga Reddy district, developed by registered promoters PANNALA SHRUTHI REDDY and GORIGE YADAIAH. The site area is 38,238.39 sq.m., with a net area of 28,855.68 sq.m.; the layout records 112 residential plots, and no building floors or complete plot-size schedule is supplied. The project is registered under TG-RERA registration P02400007951, and the promoter’s stated completion date is 03/03/2025.

01What we found

Period endedTG-RERA registration ran to 3 Mar 2025 - check its extension on TG-RERA
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Lemoor, Kandukur, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project namePSR COUNTY RERA record
Project typePlotted development / open layout RERA record
Phase or registered portionA separate phase is not identified in the supplied record; the registered land is described as Survey Nos. 347 and 349 PART
TG-RERA registrationP02400007951
Registration validity23/03/2024 to 03/03/2025; this is the registration period, not an occupancy certificate or evidence of completion
Registered promoterPANNALA SHRUTHI REDDY and GORIGE YADAIAH
RERA status in supplied recordThe certificate records registration; no subsequent extension or current registration-status record is supplied

Land and geographic identity

FieldRecord
LocalityLemoor; the HMDA plan also describes the area as “Extended area of Erstwhile HUDA (HMDA)”
Revenue villageLEMOOR
Mandal / district / PINKandukur / Ranga Reddy / 501359
Project survey numbers as registered347 and 349 PART
SubdivisionsNo further subdivision is specified in the registration certificate’s project-land description. The layout and title materials also refer to 347/B and 349/A and, in title-chain material, 347/83, 349/88, 347/49, 347/892 and 349/C9; see the Land & Title review for parcel-level treatment
Total site area38,238.39 sq.m.
Net site area28,855.68 sq.m.
BoundariesNorth: road width 9; South: Survey No. 347P; East and West: Survey Nos. 347P and 349P Land records
RERA-recorded area affected by road widening / FTL / nala widening9,382.71 sq.m.; the supplied record does not break this figure down by cause RERA filing

Development identity

FieldRecord
Principal sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal layout permit000044/LO/Plg/HMDA/2022, dated 04 March 2022
Layout characterResidential open-plot layout; the plan describes the land-use zone as Residential and the plot use as Residential
Plotted area18,384.23 sq.m. in the HMDA layout area statement
Other area allocations in HMDA planRoad area 2,465.61 sq.m.; social infrastructure 721.94 sq.m.; utility area 186.93 sq.m.; mortgage area for Plot Nos. 97–112, 975.45 sq.m.
Plot countThe HMDA proceeding records 112 plots; the supplied drawing-derived plot extraction is incomplete and does not provide a verified plot-by-plot schedule Layout record
Buildings / floors / parking levelsNot applicable to the registered offering as a plotted layout; no building configuration or project parking schedule is supplied

Offering and status

FieldRecord
Unit typeResidential plots RERA record
Plot size range / plot-wise areasNot established from the supplied RERA unit schedule; no complete plot-size schedule is supplied Layout record
Booked / available plotsNot disclosed in the supplied evidence
Development stageThe promoter’s Form B undertakes completion by 03/03/2025. The supplied record does not independently verify on-site progress or completion
Original / revised completion datePromoter-declared completion date: 03/03/2025. No revised date or extension order is supplied
Completion / occupancy certificateNo completion certificate or occupancy certificate is supplied. For this plotted-layout record, the available approval material concerns layout permission and draft layout release, not a project OC Document index

2. The project story

PSR COUNTY is registered as a residential plotted development in Lemoor village, Kandukur mandal, Ranga Reddy district. Its registered land description is Survey Nos. 347 and 349 PART. The HMDA layout material describes a site with a total area of 38,238.39 sq.m. and a net area of 28,855.68 sq.m., arranged as plots, roads, park/open space, social infrastructure and utility land.

The HMDA material includes a layout permit dated 04 March 2022 and a later proceeding dated 20 January 2024 that describes release of a draft technical layout pattern. These records do not establish that all layout works have been completed or that a final layout plan has been issued. The promoter’s Form B states a completion undertaking of 03/03/2025; no independent site-progress verification, completion certificate or later revised completion timeline is provided here.

The registered offering is plots, not apartments or completed houses. The registration certificate identifies the project and land but does not provide a complete plot-by-plot size schedule or current sold/unsold inventory in the supplied material. Layout record

3. Master plan, architecture & building design

The project is a plotted layout, so the relevant design evidence concerns land allocation and layout infrastructure rather than building footprints, floor plans or tower arrangements. The HMDA layout record identifies total site area of 38,238.39 sq.m., net area of 28,855.68 sq.m. and plotted area of 18,384.23 sq.m. It also records 2,465.61 sq.m. for roads, 721.94 sq.m. for social infrastructure and 186.93 sq.m. for utility area.

The layout material identifies Plot Nos. 97–112 as mortgaged to HMDA, with the plan stating 2,918.84 sq.m. for those plots; it separately identifies Plot Nos. 90–96 as a 975.45 sq.m. mortgage area. These are approval-related reserved/mortgaged areas, not evidence that those plots are available for sale. The plan’s stated conditions include restrictions on selling mortgaged plots before their release and requirements relating to completion of development works and handing over roads and open spaces.

The HMDA area statement and the January 2024 proceeding describe some land-use components differently; this overview reports the figures as stated in the respective records and does not reconcile them. The software-derived layout extraction is incomplete: plot count and plot sizes have not been verified against a complete plot schedule. Layout record

4. Homes, configurations & floor plans

The registered offering is residential plots. No complete RERA-filed plot-size schedule, plot-wise saleable area, booked inventory or available inventory is supplied, so a configuration table with unit counts and areas cannot be completed from this evidence. Layout record

The layout drawing extraction is incomplete and does not provide a verified list of plot sizes. A vendor record lists “Residential Plot” and “plot 167 sq.yrd,” but this is a third-party/vendor claim rather than a verified RERA plot schedule; it is not used here as the project’s filed plot-size range. Layout record Promoter website

5. Parking & vehicle circulation

The supplied layout records identify internal road areas and road-width references, but do not provide a count or allocation of vehicle-parking spaces, visitor parking, accessible parking, EV charging, or parking allotment arrangements. A drawn plot or road does not establish exclusive parking rights.

6. Amenities, recreation & open spaces

Park / organised open space
Description / size2,465.61 sq.m. in the HMDA layout record; the January 2024 proceeding describes it as park space and requires handover to the local body by registered gift deed before release of final layout plans
Evidence sourceSanctioned/draft layout records
Declared progress / verified statusNo completion or handover evidence supplied
Social infrastructure
Description / size721.94 sq.m.; the HMDA plan identifies this as social infrastructure
Evidence sourceLayout plan
Declared progress / verified statusNo facility type, fit-out or completion evidence supplied
Utility area
Description / size186.93 sq.m. in the HMDA layout area statement
Evidence sourceLayout plan
Declared progress / verified statusNo completion evidence supplied
Internal roads and footpaths
Description / sizeLayout plan includes road areas and road-width references; the approval material requires road and footpath works
Evidence sourceLayout approval conditions
Declared progress / verified statusNo independent completion verification supplied
Avenue planting / green foliage
Description / sizeRequired by the layout proceeding, including avenue plantation where specified and planting before final layout issue
Evidence sourceApproval condition
Declared progress / verified statusRequired/planned; completion not verified

The RERA amenities record marks several layout services as available with 0% progress recorded, including internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/park, street lighting, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station. This is a filed status record, not independent evidence of completion. RERA amenities

7. Utilities, building services & safety

The HMDA layout conditions require arrangements for potable-water connectivity through a relevant approved source, underground ducting of utilities, underground storm-water drainage, street lighting, a transformer yard, source segregation of garbage and space for solid-waste disposal. They also specify that layouts under 10 acres should provide a septage-treatment mechanism in accordance with the Telangana State FSSM policy, while a site over 10 acres should provide an STP area in addition to mandatory open spaces. The supplied evidence does not establish which treatment arrangement has been installed or its capacity.

The RERA amenities record lists water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress for the listed items. It also lists fire-safety requirements without an availability entry. No utility capacities, commissioning records, fire-clearance evidence, security-system details or accessibility provisions are supplied. RERA amenities

8. Location, access & connectivity

The registered location is LEMOOR village, Kandukur mandal, Ranga Reddy district, Telangana, PIN 501359. The supplied location record geocodes the project area at 17.1415483, 78.5167704. Location record

The layout approval material identifies road connections and road widths, including references to 12.00 and 9.14, and the RERA land record gives the north boundary as “ROAD WIDTH 9.” The location evidence records the nearest sampled Outer Ring Road interchange at approximately 11.5 km. No public-transport information or independently sourced travel times to landmarks is supplied. Land records Location record

9. Developer & development status

The registered promoters are PANNALA SHRUTHI REDDY and GORIGE YADAIAH. The supplied records identify the promoter organization type as “Others”; a more specific legal-entity type and corporate registration identifier are not established. The registration certificate gives the promoters’ addresses as Balapur, Ranga Reddy district, PIN 500005. RERA filing Corporate record

PANNALA SHRUTHI REDDY’s filed Form B declares that the project would be completed by 03/03/2025. The supplied evidence contains no revised completion date, extension order, independently verified construction progress or completion certificate. Registration validity ended on 03/03/2025 according to the certificate, which is distinct from the promoter’s completion undertaking and from any completion/occupancy certification.

10. Approvals, official records & documents

TG-RERA registration
DetailsPSR COUNTY, registration P02400007951; certificate states validity from 23/03/2024 to 03/03/2025
EvidenceForm C registration certificate
Principal layout permit
DetailsHMDA Layout Permit No. 000044/LO/Plg/HMDA/2022, dated 04 March 2022; application/file references include 043879/SMD/LT/U6/HMDA/06032021
EvidenceHMDA layout plan/permit
Draft layout proceeding
DetailsProceeding dated 20.01.2024 concerning a draft layout pattern for Survey Nos. 347 and 349 at Lemoor
EvidenceGram Panchayat proceeding
HMDA draft layout letter
DetailsTechnical approval/forwarding of the draft open-plot layout proposal, dated 04 March 2022; the document states that permission is not proof of title
EvidenceHMDA Planning Department letter
Promoter declaration
DetailsForm B affidavit by PANNALA SHRUTHI REDDY, including the completion undertaking and declarations concerning title and encumbrances
EvidenceRERA-filed declaration
Completion / occupancy certificate
DetailsNone supplied
EvidenceNot established in the supplied project documents

The HMDA layout records list mortgage deeds 4133/2022 and 4134/2022 in favour of the Metropolitan Commissioner, HMDA, for specified plots as security connected with layout development conditions.

Frequently asked questions

Is PSR COUNTY registered with Telangana RERA?

Yes. PSR COUNTY is registered with the Telangana Real Estate Regulatory Authority as P02400007951; the registration status is New Project.

Who is the developer of PSR COUNTY?

The promoter named in the RERA registration is PANNALA SHRUTHI REDDY AND GORIGE YADAIAH.

Where is PSR COUNTY located?

PSR COUNTY is in KANDUKUR, LEMOOR, Rangareddy, Telangana (501359).

When will PSR COUNTY be completed?

The promoter's proposed date of completion filed with RERA is 03/03/2025. This is the promoter's declaration, not a guarantee.