Green Rich High Lands Phase 2
GREEN RICH ESTATES LLP · Rangareddy · RERA P02400006047
GREEN RICH HIGH LANDS PHASE 2 is a plotted development in Lemoor and Thummaloor revenue villages, in Kandukur Mandal and Maheshwaram Mandal, Ranga Reddy District. The registered promoter is GREEN RICH ESTATES LLP. The project has a total site area of 912157.06 sq. m and a net layout/site area of 869467.11 sq. m; the drawing identifies at least 1,006 plots, with two software-read plot sizes ranging from 677.68 sq. m (810.5 sq. yd) to 744.84 sq. m (890.8 sq. yd). It is registered under TG-RERA number P02400006047, and the promoter’s Form B declares completion before 27/12/2025.
📘 Project brochure from the promoter’s website ↗More from Green Rich Estates LLP · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | GREEN RICH HIGH LANDS PHASE 2 RERA record |
| Project type | Plotted development / open-plot layout RERA record |
| Phase / registered portion | Phase 2 RERA record |
| TG-RERA registration | P02400006047; certificate issued 18/04/2023 |
| Registration validity | 18/04/2023 to 02/02/2026, unless extended by the Authority; no extension is recorded in the supplied certificate |
| Registered promoter | GREEN RICH ESTATES LLP RERA record Corporate record |
| RERA status in supplied record | New Project; registration certificate records a grant under section 5 RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / villages | Lemoor and Thummaloor revenue villages RERA record Land records |
| Mandals | Kandukur Mandal (Lemoor) and Maheshwaram Mandal (Thummaloor) |
| District / PIN | Ranga Reddy District; PIN 501359 RERA record |
| Survey numbers and subdivisions—Lemoor | 463/A, 464/A, 465, 465/UU/1, 466, 467, 468, 469, 469/1, 469/3, 470, 470/E, 470/EE, 471, 471/A/1, 471/E, 471/U, 471/RU, 474/RU/2, 474/RU/3, 472/E1/1, 472/2, 475/2, 475/AA/1, 475/AA/2 |
| Survey numbers and subdivisions—Thummaloor | 247/Part, 247/CHA, 247/CHA1/1, 247/CHA1/2, 247/GA, 247/GHA |
| Total site area | 912157.06 sq. m RERA filing |
| Net layout/site area | 869467.11 sq. m RERA filing |
| Area recorded as affected by road widening/FTL/Nala widening | 42689.95 sq. m in the RERA land record RERA filing |
| Boundaries | East: Survey No.—Lemoor Village; West: 30 Wide Road; North: Plot No. 475 Part and Lemoor Village; South: Survey No.—Gudoor Village RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | 000258/LO/Plg/HMDA/2022, approved 27 December 2022 Approvals record |
| Revised draft-layout approval record | HMDA letter 055751/SMD/LT/U6/HMDA/13072022, dated 03-03-2023 Approvals record |
| Approved built-up area | 494093.66 sq. m is recorded as “Approved Built up Area” in the RERA project fields; the supplied record does not identify this as a building or FSI calculation RERA filing |
| Layout scale / organization | Plotted layout; software-read drawing indicates at least 1,006 plots, but the filed plot list is incomplete Layout record |
| Buildings / floors | Not disclosed as a building scheme; no tower count or floor configuration is supplied for this plotted development |
Offering and status
| Field | Record |
|---|---|
| Unit type | Plots; RERA registration and approval records describe an open-plot layout RERA record |
| Plot count and sizes | Drawing software identifies at least 1,006 plots; only two plot sizes were software-read from the drawing, ranging from 677.68 sq. m (810.5 sq. yd) to 744.84 sq. m (890.8 sq. yd). The plot list is incomplete, so these are not a complete inventory Layout record |
| Booked / available counts | Not disclosed in the supplied evidence RERA unit table |
| Construction / development stage | RERA project record labels the project “New Project”; the supplied data does not include a current, independently verified site-progress report RERA record RERA amenities |
| Completion dates | RERA registration certificate validity ends 02/02/2026; Form B declares completion before 27/12/2025. These are separate record entries, not proof of completion |
| Completion / occupancy evidence | An architect’s Form–1A dated 30.09.2024 certifies completion of Phase 2 in all aspects and identifies HMDA permit 000258/LO/Plg/HMDA/2022. The supplied record does not include a separate HMDA-issued final layout release document |
2. The project story
- GREEN RICH HIGH LANDS PHASE 2 is registered as a plotted development spanning land in Lemoor and Thummaloor villages in Ranga Reddy District. The RERA certificate identifies the registered phase and its survey schedule; HMDA’s draft-layout letter describes the development as an open-plot layout, with roads, parks/open space, social infrastructure and plots as planned land uses. RERA record
- The RERA filing identifies the project as a “New Project.” The promoter’s January 2023 Form B undertook to complete it before 27/12/2025. Separately, an architect’s Form–1A dated 30.09.2024 certifies completion in all aspects of Phase 2. That is an architect’s certificate in the supplied file; it is not itself the HMDA final layout-release instrument. RERA record
- The approved layout letter sets out development works and conditions, including road formation, drainage, water-supply lines, parks, plantation and other infrastructure. Those items are approval requirements or stated provisions; the supplied evidence does not establish their current on-site completion through an independent inspection.
3. Master plan, architecture & building design
- This is a land subdivision, not a tower or apartment scheme in the supplied RERA record. HMDA’s draft-layout letter records a total site area of 912157.06 sq. m, a net site area of 869467.11 sq. m, and a plotted area of 494093.66 sq. m. Its area statement also lists 216820.27 sq. m for layout roads, 92171.43 sq. m for parks, and 66412.61 sq. m for social infrastructure.
- The filed drawing’s software-read area statement gives 92171.43 sq. m for “Parks / open space,” 21898.62 sq. m for “Social infrastructure,” and 44513.99 sq. m for “Amenities”; those values are drawing-derived readings, not independently verified measurements. The drawing extract records roads at 216820.27 sq. m and plots at 494093.66 sq. m. Layout record
- The drawing software identifies at least 1,006 plots; its plot list is incomplete. The approval record lists principal internal-road widths as 18 mts and above and 60 feet and above. The layout approval also requires roads and open-space areas to be handed over to the relevant local body by registered gift deed before final layout release, and specifies other conditions for development and access. Layout record
- No building footprints, tower arrangements, floor plans, apartment configurations, building heights or building-level common-area plans are supplied for this registered plotted phase. The “approved built-up area” of 494093.66 sq. m appears in the RERA project fields; the evidence does not establish that this is building gross floor area or FSI-counted area. RERA filing
4. Homes, configurations & floor plans
The registered offering is plots, not flats. The drawing extract is incomplete: software identifies at least 1,006 plots, but the plot list does not provide a complete count or complete plot-size schedule. Two plot sizes were software-read from the drawing; these should be checked against the original drawing. RERA record Layout record
| Plot information | Drawing-derived record |
|---|---|
| Minimum of two software-read plot sizes | 677.68 sq. m / 810.5 sq. yd |
| Median of two software-read plot sizes | 711.26 sq. m / 850.7 sq. yd |
| Maximum of two software-read plot sizes | 744.84 sq. m / 890.8 sq. yd |
| Size-band extract | 2 plots in the 500–1000 sq. yd band |
| Plot count | At least 1,006; drawing plot list incomplete |
These figures are software-measured from the approved layout drawing, not a complete RERA-filed plot inventory. Booked and available plot counts are not supplied. The floor-plan record contains no apartment measurements; carpet area, saleable area and loading are therefore not applicable on the available evidence. Layout record RERA unit table Floor plans
5. Parking & vehicle circulation
The supplied layout extract does not provide a count of parking spaces or a parking-allocation schedule. HMDA’s approval letter identifies layout roads and requires them to be opened for access to neighbouring sites; it also lists road formation and cycling tracks among the required development works. No dedicated resident, visitor or accessible-parking counts, parking structures, parking allotment terms, vehicle-entry arrangements, or EV-charging provision are established in the supplied records. Layout record
6. Amenities, recreation & open spaces
The HMDA draft-layout letter lists infrastructure and landscape-related works as approval provisions. Its listed areas include 92171.43 sq. m of park, 66412.61 sq. m of social infrastructure and 216820.27 sq. m of layout roads. The RERA amenity record marks the listed categories as available, but reports 0% progress for each; this does not verify completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Parks / organized open space | 92171.43 sq. m | HMDA draft-layout letter; drawing area statement Layout record | In approval/layout records; RERA amenity progress 0%; completion not independently verified |
| Social infrastructure | 66412.61 sq. m in HMDA approval letter; 21898.62 sq. m in software-read drawing statement | Layout record | In approval/layout records; progress/completion not independently verified |
| Internal roads and footpaths | 216820.27 sq. m layout-road area | Layout record RERA amenities | Listed in RERA amenity record; progress 0%; completion not independently verified |
| Green strip / tot lot / park | Area not separately specified | RERA amenities | Listed; progress 0%; completion not independently verified |
| Community buildings | Area / capacity not supplied | RERA amenities | Listed; progress 0%; completion not independently verified |
| Cycling tracks | Size not supplied | HMDA approval condition | Required by approval letter; completion not independently verified |
The developer’s brochure markets additional facilities including a clubhouse, sports and recreation features, a lake, school and commercial uses. These are marketing claims, not established as sanctioned or delivered facilities for this registered phase by the supplied project documents; no sizes or completion evidence for them are included here.
7. Utilities, building services & safety
- HMDA’s draft-layout approval lists internal water-supply pipelines, an overhead tank, storm-water drainage, underground drainage lines, a common septic tank/STP, rainwater-harvesting pits, a transformer, street lighting, solid-waste disposal space and a bio-compost unit as development provisions. The letter also requires arrangements for potable-water connectivity, underground ducting for utilities, source segregation of garbage and LED street lighting. These are approval-record provisions and conditions; the supplied evidence does not report installed capacities or independently confirm completion.
- The RERA amenity record marks water supply, sewerage, storm-water drains, sewage treatment/disposal, solid-waste management, rainwater harvesting, energy management, street lighting and an electrical meter room/substation/receiving station as available, while recording 0% progress. Fire protection and fire-safety requirements appear in that record without an “available: YES” entry. No capacity or system details are supplied for water storage, STP, electrical backup, fire systems, security, accessibility or other services. RERA amenities
8. Location, access & connectivity
- The project’s registered land is in Lemoor and Thummaloor villages, in Ranga Reddy District: Lemoor falls within Kandukur Mandal and Thummaloor within Maheshwaram Mandal in the HMDA approval records. The registered PIN is 501359. RERA record
- The HMDA approval describes layout roads and requires road access to neighbouring sites. The supplied location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists the Financial District (Nanakramguda) at 1.2 km as an anchor distance. No other independently measured approach-road or public-transport distances are supplied. Location record HMDA
9. Developer & development status
- The registered promoter is GREEN RICH ESTATES LLP, an LLP, with GSTIN 36AAQFG1768F1Z4. The supplied promoter address is Gayathri Enclave, Gandipet Road, Lemoor, Kandukur, Ranga Reddy, PIN 501359. The RERA registration certificate separately records the promoter office as “Village: koKapet, Mandal: Gandipet, District: Ranga Reddy, Pin: 500075.” Corporate record Parties record
- RERA identifies Narsi Reddy Teegela as authorized signatory. The project record identifies Narender Reddy Aluka and Srinivas Karnati as partners and Narsi Reddy Teegala as authorized signatory. Parties record
- The Form B affidavit declares a completion undertaking before 27/12/2025. The architect’s Form–1A dated 30.09.2024 certifies Phase 2 as complete in all aspects. The supplied evidence does not include a current site inspection or a separate HMDA final layout-release document; the RERA registration certificate’s validity period is a distinct registration matter.
10. Approvals, official records & documents
| Identifier / date | P02400006047; issued 18/04/2023; validity to 02/02/2026 |
|---|---|
| What the supplied record establishes | Registration granted to GREEN RICH HIGH LANDS PHASE 2; lists registration conditions including a separate-account requirement |
| Identifier / date | 000258/LO/Plg/HMDA/2022; approved 27 December 2022 |
|---|---|
| What the supplied record establishes | Draft layout approval for the plotted development; states site areas, land uses, mortgage and conditions for development and final release |
| Identifier / date | 055751/SMD/LT/U6/HMDA/13072022; dated 03-03-2023 |
|---|---|
| What the supplied record establishes | Approval of revised draft layout and request to the relevant Gram Panchayaths to collect necessary charges and release the layout to the applicant |
| Identifier / date | Mortgage deed 22975/2022, dated 20/12/2022 |
|---|---|
| What the supplied record establishes | Records 74330.57 sq. m in specified plots mortgaged in favour of the Metropolitan Commissioner, HMDA |
| Identifier / date | 30.09.2024; permit no. 000258/LO/Plg/HMDA/2022 |
|---|---|
| What the supplied record establishes | Architect’s certificate states Phase 2 is complete in all aspects; it is not the HMDA-issued final layout-release document |
| Identifier / date | January 2023 |
|---|---|
| What the supplied record establishes | Promoter declaration on title, encumbrance status, project-account obligations and completion undertaking before 27/12/2025 |
| Identifier / date | Document 304801 |
|---|---|
| What the supplied record establishes | One layout sheet is referenced in the project evidence; drawing-derived plot count and measurements are incomplete/software-read Layout record |
The supplied material does not include a separate HMDA final layout release, a current project-progress certification, or a complete plot inventory.
1. Project at a glance
Project identity
Registered project name: GREEN RICH HIGH LANDS PHASE 2
Project type: Plotted development / open-plot layout
Phase / registered portion: Phase 2
TG-RERA registration: P02400006047; certificate issued 18/04/2023
Registration validity: 18/04/2023 to 02/02/2026, unless extended by the Authority; no extension is recorded in the supplied certificate
Registered promoter: GREEN RICH ESTATES LLP
RERA status in supplied record: New Project; registration certificate records a grant under section 5
Land and geographic identity
Locality / villages: Lemoor and Thummaloor revenue villages
Mandals: Kandukur Mandal (Lemoor) and Maheshwaram Mandal (Thummaloor)
District / PIN: Ranga Reddy District; PIN 501359
Survey numbers and subdivisions—Lemoor: 463/A, 464/A, 465, 465/UU/1, 466, 467, 468, 469, 469/1, 469/3, 470, 470/E, 470/EE, 471, 471/A/1, 471/E, 471/U, 471/RU, 474/RU/2, 474/RU/3, 472/E1/1, 472/2, 475/2, 475/AA/1, 475/AA/2
Survey numbers and subdivisions—Thummaloor: 247/Part, 247/CHA, 247/CHA1/1, 247/CHA1/2, 247/GA, 247/GHA
Total site area: 912157.06 sq. m
Net layout/site area: 869467.11 sq. m
Area recorded as affected by road widening/FTL/Nala widening: 42689.95 sq. m in the RERA land record
Boundaries: East: Survey No.—Lemoor Village; West: 30 Wide Road; North: Plot No. 475 Part and Lemoor Village; South: Survey No.—Gudoor Village
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: 000258/LO/Plg/HMDA/2022, approved 27 December 2022
Revised draft-layout approval record: HMDA letter 055751/SMD/LT/U6/HMDA/13072022, dated 03-03-2023
Approved built-up area: 494093.66 sq. m is recorded as “Approved Built up Area” in the RERA project fields; the supplied record does not identify this as a building or FSI calculation
Layout scale / organization: Plotted layout; software-read drawing indicates at least 1,006 plots, but the filed plot list is incomplete
Buildings / floors: Not disclosed as a building scheme; no tower count or floor configuration is supplied for this plotted development
Offering and status
Unit type: Plots; RERA registration and approval records describe an open-plot layout
Plot count and sizes: Drawing software identifies at least 1,006 plots; only two plot sizes were software-read from the drawing, ranging from 677.68 sq. m (810.5 sq. yd) to 744.84 sq. m (890.8 sq. yd). The plot list is incomplete, so these are not a complete inventory
Booked / available counts: Not disclosed in the supplied evidence
Construction / development stage: RERA project record labels the project “New Project”; the supplied data does not include a current, independently verified site-progress report
Completion dates: RERA registration certificate validity ends 02/02/2026; Form B declares completion before 27/12/2025. These are separate record entries, not proof of completion
Completion / occupancy evidence: An architect’s Form–1A dated 30.09.2024 certifies completion of Phase 2 in all aspects and identifies HMDA permit 000258/LO/Plg/HMDA/2022. The supplied record does not include a separate HMDA-issued final layout release document
2. The project story
- GREEN RICH HIGH LANDS PHASE 2 is registered as a plotted development spanning land in Lemoor and Thummaloor villages in Ranga Reddy District. The RERA certificate identifies the registered phase and its survey schedule; HMDA’s draft-layout letter describes the development as an open-plot layout, with roads, parks/open space, social infrastructure and plots as planned land uses.
- The RERA filing identifies the project as a “New Project.” The promoter’s January 2023 Form B undertook to complete it before 27/12/2025. Separately, an architect’s Form–1A dated 30.09.2024 certifies completion in all aspects of Phase 2. That is an architect’s certificate in the supplied file; it is not itself the HMDA final layout-release instrument.
- The approved layout letter sets out development works and conditions, including road formation, drainage, water-supply lines, parks, plantation and other infrastructure. Those items are approval requirements or stated provisions; the supplied evidence does not establish their current on-site completion through an independent inspection.
3. Master plan, architecture & building design
- This is a land subdivision, not a tower or apartment scheme in the supplied RERA record. HMDA’s draft-layout letter records a total site area of 912157.06 sq. m, a net site area of 869467.11 sq. m, and a plotted area of 494093.66 sq. m. Its area statement also lists 216820.27 sq. m for layout roads, 92171.43 sq. m for parks, and 66412.61 sq. m for social infrastructure.
- The filed drawing’s software-read area statement gives 92171.43 sq. m for “Parks / open space,” 21898.62 sq. m for “Social infrastructure,” and 44513.99 sq. m for “Amenities”; those values are drawing-derived readings, not independently verified measurements. The drawing extract records roads at 216820.27 sq. m and plots at 494093.66 sq. m.
- The drawing software identifies at least 1,006 plots; its plot list is incomplete. The approval record lists principal internal-road widths as 18 mts and above and 60 feet and above. The layout approval also requires roads and open-space areas to be handed over to the relevant local body by registered gift deed before final layout release, and specifies other conditions for development and access.
- No building footprints, tower arrangements, floor plans, apartment configurations, building heights or building-level common-area plans are supplied for this registered plotted phase. The “approved built-up area” of 494093.66 sq. m appears in the RERA project fields; the evidence does not establish that this is building gross floor area or FSI-counted area.
4. Homes, configurations & floor plans
The registered offering is plots, not flats. The drawing extract is incomplete: software identifies at least 1,006 plots, but the plot list does not provide a complete count or complete plot-size schedule. Two plot sizes were software-read from the drawing; these should be checked against the original drawing.
Minimum of two software-read plot sizes: 677.68 sq. m / 810.5 sq. yd
Median of two software-read plot sizes: 711.26 sq. m / 850.7 sq. yd
Maximum of two software-read plot sizes: 744.84 sq. m / 890.8 sq. yd
Size-band extract: 2 plots in the 500–1000 sq. yd band
Plot count: At least 1,006; drawing plot list incomplete
These figures are software-measured from the approved layout drawing, not a complete RERA-filed plot inventory. Booked and available plot counts are not supplied. The floor-plan record contains no apartment measurements; carpet area, saleable area and loading are therefore not applicable on the available evidence.
5. Parking & vehicle circulation
The supplied layout extract does not provide a count of parking spaces or a parking-allocation schedule. HMDA’s approval letter identifies layout roads and requires them to be opened for access to neighbouring sites; it also lists road formation and cycling tracks among the required development works. No dedicated resident, visitor or accessible-parking counts, parking structures, parking allotment terms, vehicle-entry arrangements, or EV-charging provision are established in the supplied records.
6. Amenities, recreation & open spaces
The HMDA draft-layout letter lists infrastructure and landscape-related works as approval provisions. Its listed areas include 92171.43 sq. m of park, 66412.61 sq. m of social infrastructure and 216820.27 sq. m of layout roads. The RERA amenity record marks the listed categories as available, but reports 0% progress for each; this does not verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Parks / organized open space | 92171.43 sq. m | HMDA draft-layout letter; drawing area statement | In approval/layout records; RERA amenity progress 0%; completion not independently verified |
| Social infrastructure | 66412.61 sq. m in HMDA approval letter; 21898.62 sq. m in software-read drawing statement | In approval/layout records; progress/completion not independently verified | |
| Internal roads and footpaths | 216820.27 sq. m layout-road area | Listed in RERA amenity record; progress 0%; completion not independently verified | |
| Green strip / tot lot / park | Area not separately specified | Listed; progress 0%; completion not independently verified | |
| Community buildings | Area / capacity not supplied | Listed; progress 0%; completion not independently verified | |
| Cycling tracks | Size not supplied | HMDA approval condition | Required by approval letter; completion not independently verified |
The developer’s brochure markets additional facilities including a clubhouse, sports and recreation features, a lake, school and commercial uses. These are marketing claims, not established as sanctioned or delivered facilities for this registered phase by the supplied project documents; no sizes or completion evidence for them are included here.
7. Utilities, building services & safety
- HMDA’s draft-layout approval lists internal water-supply pipelines, an overhead tank, storm-water drainage, underground drainage lines, a common septic tank/STP, rainwater-harvesting pits, a transformer, street lighting, solid-waste disposal space and a bio-compost unit as development provisions. The letter also requires arrangements for potable-water connectivity, underground ducting for utilities, source segregation of garbage and LED street lighting. These are approval-record provisions and conditions; the supplied evidence does not report installed capacities or independently confirm completion.
- The RERA amenity record marks water supply, sewerage, storm-water drains, sewage treatment/disposal, solid-waste management, rainwater harvesting, energy management, street lighting and an electrical meter room/substation/receiving station as available, while recording 0% progress. Fire protection and fire-safety requirements appear in that record without an “available: YES” entry. No capacity or system details are supplied for water storage, STP, electrical backup, fire systems, security, accessibility or other services.
8. Location, access & connectivity
- The project’s registered land is in Lemoor and Thummaloor villages, in Ranga Reddy District: Lemoor falls within Kandukur Mandal and Thummaloor within Maheshwaram Mandal in the HMDA approval records. The registered PIN is 501359.
- The HMDA approval describes layout roads and requires road access to neighbouring sites. The supplied location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists the Financial District (Nanakramguda) at 1.2 km as an anchor distance. No other independently measured approach-road or public-transport distances are supplied.
9. Developer & development status
- The registered promoter is GREEN RICH ESTATES LLP, an LLP, with GSTIN 36AAQFG1768F1Z4. The supplied promoter address is Gayathri Enclave, Gandipet Road, Lemoor, Kandukur, Ranga Reddy, PIN 501359. The RERA registration certificate separately records the promoter office as “Village: koKapet, Mandal: Gandipet, District: Ranga Reddy, Pin: 500075.”
- RERA identifies Narsi Reddy Teegela as authorized signatory. The project record identifies Narender Reddy Aluka and Srinivas Karnati as partners and Narsi Reddy Teegala as authorized signatory.
- The Form B affidavit declares a completion undertaking before 27/12/2025. The architect’s Form–1A dated 30.09.2024 certifies Phase 2 as complete in all aspects. The supplied evidence does not include a current site inspection or a separate HMDA final layout-release document; the RERA registration certificate’s validity period is a distinct registration matter.
10. Approvals, official records & documents
| Identifier / date | P02400006047; issued 18/04/2023; validity to 02/02/2026 |
|---|---|
| What the supplied record establishes | Registration granted to GREEN RICH HIGH LANDS PHASE 2; lists registration conditions including a separate-account requirement |
| Identifier / date | 000258/LO/Plg/HMDA/2022; approved 27 December 2022 |
|---|---|
| What the supplied record establishes | Draft layout approval for the plotted development; states site areas, land uses, mortgage and conditions for development and final release |
| Identifier / date | 055751/SMD/LT/U6/HMDA/13072022; dated 03-03-2023 |
|---|---|
| What the supplied record establishes | Approval of revised draft layout and request to the relevant Gram Panchayaths to collect necessary charges and release the layout to the applicant |
| Identifier / date | Mortgage deed 22975/2022, dated 20/12/2022 |
|---|---|
| What the supplied record establishes | Records 74330.57 sq. m in specified plots mortgaged in favour of the Metropolitan Commissioner, HMDA |
| Identifier / date | 30.09.2024; permit no. 000258/LO/Plg/HMDA/2022 |
|---|---|
| What the supplied record establishes | Architect’s certificate states Phase 2 is complete in all aspects; it is not the HMDA-issued final layout-release document |
| Identifier / date | January 2023 |
|---|---|
| What the supplied record establishes | Promoter declaration on title, encumbrance status, project-account obligations and completion undertaking before 27/12/2025 |
| Identifier / date | Document 304801 |
|---|---|
| What the supplied record establishes | One layout sheet is referenced in the project evidence; drawing-derived plot count and measurements are incomplete/software-read |
The supplied material does not include a separate HMDA final layout release, a current project-progress certification, or a complete plot inventory.
Other registrations of Green Rich High Lands
Frequently asked questions
Is GREEN RICH HIGH LANDS PHASE 2 registered with Telangana RERA?
Yes. GREEN RICH HIGH LANDS PHASE 2 is registered with the Telangana Real Estate Regulatory Authority as P02400006047; the registration status is New Project.
Who is the developer of GREEN RICH HIGH LANDS PHASE 2?
The promoter named in the RERA registration is GREEN RICH ESTATES LLP.
Where is GREEN RICH HIGH LANDS PHASE 2 located?
GREEN RICH HIGH LANDS PHASE 2 is in Lemoor, Kandukur, Rangareddy, Telangana (501359).
When will GREEN RICH HIGH LANDS PHASE 2 be completed?
The promoter's proposed date of completion filed with RERA is 02/02/2026. This is the promoter's declaration, not a guarantee.