Premium County 4

KATYAYANI CONSTRUCTIONS · Rangareddy · RERA P02400004140

PREMIUM COUNTY 4 is a plotted development in Lemoor, Kandukur mandal, Ranga Reddy district, developed by registered promoter Katyayani Constructions. The project covers a total site area of 73,240.62 sq. m in Survey Nos. 257/P and 258/P and is an open-plot layout; the number of plots and plot-size configurations are not disclosed. It is registered under TG-RERA registration number P02400004140, granted 25 February 2022, and the promoter’s Form B undertaking states completion by 8 September 2024.

More from Katyayani Constructions · 3 projects →

01What we found

Period endedTG-RERA registration ran to 8 Sep 2024 - check its extension on TG-RERA
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Lemoor, Kandukur, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project namePREMIUM COUNTY 4 RERA record
Project typePlotted development / proposed open-plot layout RERA record
Phase / registered portionNot separately identified; the registration covers the project in Survey Nos. 257/P and 258/P
TG-RERA registrationP02400004140, granted 25 February 2022; registration certificate states validity through 8 September 2024 and no extension is recorded in the supplied certificate
Registered promoterKatyayani Constructions
RERA status in supplied recordNew project; registration validity has ended, and the supplied certificate records no extension. This is separate from the project’s completion undertaking and from any occupancy or completion certification. RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageLemoor (also recorded as LEMOOR and “Lemoor Village”) RERA record
MandalKandukur RERA record
DistrictRanga Reddy RERA record
PIN501359 RERA record
Project survey numbers257/P and 258/P
Total site area73,240.62 sq. m Land records
Area affected by master-plan road7,814.4 sq. m Land records
Net site area65,426.22 sq. m Land records
Boundaries recorded in RERA dataEast: other land; West: existing 12-meter road; North: other land; South: other land RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the draft layout letter forwards the plans to Lemoor Gram Panchayath for further action and release Approvals record
Principal layout approval000320/LO/Plg/HMDA/2021, dated 08 September 2021; application number 046770/SMD/LT/U6/HMDA/01072021 Approvals record
Approved built-up area42,855.25 sq. m is recorded as “Approved Built up Area” in the RERA filing; the layout drawing’s area statement labels this figure “Plotted Area.” It is not a building floor-area schedule. RERA filing Layout record
Development form / building configurationOpen-plot layout. Building count, floors, parking levels and apartment configuration are not disclosed in the supplied project record. RERA filing
Layout land-use statementPlotted area 42,855.25 sq. m; layout roads 15,972.37 sq. m; park 4,957.58 sq. m; social infrastructure 1,639.76 sq. m; amenities area 0. The drawing-derived figures are reported as stated in the filed layout material. Layout record
Authority-mortgaged plotsPlot Nos. 111 and 114 to 156, extent 8,623.04 sq. m, mortgaged to the Metropolitan Commissioner, HMDA under Document No. 17063/2021, dated 23 August 2021

Offering and status

ItemRecord
Offered productPlots; individual plot count, plot-number schedule and plot-size bands are not established by the supplied structured layout data. RERA record Layout record
Booked / available plotsNot disclosed in the supplied evidence.
Construction / development stageNo independently verified site-progress information is supplied. RERA-filed amenity progress fields show 0% for the listed items; these are filing entries, not independent site verification. RERA amenities
Completion dateThe promoter’s Form B undertaking states completion by 8 September 2024.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied evidence. The development is a plotted layout; the supplied HMDA document is described as a draft layout letter, with final layout release subject to stated conditions.

2. The project story

PREMIUM COUNTY 4 is a proposed open-plot layout in Lemoor village, Kandukur mandal, Ranga Reddy district, covering Survey Nos. 257/P and 258/P. Its filed land statement gives a total site area of 73,240.62 sq. m, including 7,814.4 sq. m affected by master-plan road, and a net site area of 65,426.22 sq. m. RERA record Land records

The principal approval record is an HMDA draft layout letter dated 8 September 2021. It records technical approval and forwarding to Lemoor Gram Panchayath for further action and release of plans. The letter also sets out infrastructure and handover requirements and says development works are to be completed within three years. It describes a layout—not apartment blocks or completed homes—and directs that buildings not be constructed on the plots until final layout issuance.

The promoter’s Form B declares a completion undertaking of 8 September 2024. The supplied record does not establish actual construction or infrastructure completion, final layout release, or an occupancy/completion certificate.

3. Master plan, architecture & building design

This is a plotted layout, so the relevant design evidence is the layout area statement rather than a building or floor-plan schedule. The filed figures give 65,426.22 sq. m net layout area, divided in the drawing’s statement into 42,855.25 sq. m plotted area, 15,972.37 sq. m layout roads, 4,957.58 sq. m park, and 1,639.76 sq. m social infrastructure; amenities area is recorded as 0. The source labels these as layout land uses, not building floor areas. Layout record

The drawing-derived plot schedule is incomplete in the supplied data: plot count and plot-size bands are not available for reporting. No building footprint, tower/block arrangement, floor configuration, or building circulation plan is established. The HMDA letter specifies road widths of 18 mts and above and 60 feet and above in the supplied approval extraction. Layout record

The HMDA letter requires roads and open spaces to be handed over to the local body by registered gift deed before final layout release; it records a gift deed for the 7,814.40 sq. m road-affected area under Document No. 16757/2021, dated 17 August 2021. It also records the separate HMDA mortgage over the specified plots.

4. Homes, configurations & floor plans

The registered offering is plots, not apartments. The supplied evidence does not provide a verified total plot count, individual plot-size schedule, booked/available inventory, or plot-wise RERA saleable areas. RERA record Layout record

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
PlotsNot disclosedNot disclosedNot disclosedNot disclosedNot applicable / not suppliedNot supplied

The two supplied drawing records are layout sheets, with no apartment floor plans or software-measured home areas. Floor plans Layout record

5. Parking & vehicle circulation

The supplied record does not establish a parking count, visitor or accessible parking provision, parking allocation to individual plots, or vehicle-entry and driveway arrangement. The layout approval extraction specifies internal roads and footpaths, including road widths of 18 mts and above and 60 feet and above, and requires all roads to be opened for access to neighbouring sites. It also requires footpaths to be paved and cycling tracks to be developed. These are approval conditions, not evidence of completed works.

6. Amenities, recreation & open spaces

The RERA-filed amenity list records availability as “YES” for the listed items, while the associated progress fields are 0%. Treat these as filing declarations, not independent confirmation of delivery. The HMDA draft letter separately includes infrastructure and landscape conditions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Clubhouse / indoor
Community buildingsNo size or facility schedule suppliedRERA-filed amenity list RERA amenitiesListed “YES”; 0% progress; not independently verified
Sports / recreation
Cycling tracksRequired within the layout; no length or quantity suppliedHMDA draft layout conditionsApproval condition; completion not verified
Landscape / open space
Park4,957.58 sq. m in the layout area statementLayout area statement Layout recordArea shown in layout record; completion not verified
Green strip / tot lot / parkNo separate size or facility schedule suppliedRERA-filed amenity list RERA amenitiesListed “YES”; 0% progress; not independently verified
Avenue plantation / landscape and tree plantingHMDA letter calls for avenue plantation and planned green foliage; no supplied quantity or areaHMDA draft layout conditions Promoter websiteRequired or listed; completion not verified
Convenience / community
Social infrastructure1,639.76 sq. m in the layout area statementLayout area statement Layout recordArea shown in layout record; handover/completion not verified
Amenities area0 in the layout area statementLayout area statement Layout recordFiled area statement
Solid-waste disposal / bio-compostHMDA letter requires disposal space and a bio-compost unit; no capacity suppliedHMDA draft layout conditionsApproval condition; completion not verified
Street lightingLED lighting specified by HMDA; no fixture count suppliedHMDA draft layout conditions RERA amenitiesListed/required; completion not verified

7. Utilities, building services & safety

The HMDA draft layout letter specifies or requires utility infrastructure, but the supplied evidence does not independently verify installation, commissioning, or capacity:

  • Water: internal water-supply pipelines and an overhead tank are listed in the approval extraction. The HMDA letter requires arrangements to connect potable-water supply to a main trunk or connecting pipeline under Mission Bhagiratha or another authority-approved source. No storage capacity or supply commitment is supplied.
  • Sewerage and drainage: the filed amenity list includes sewerage (chambers, lines, septic tank/STP) and sewage/sullage treatment and disposal. The HMDA letter requires a sewerage-treatment provision for layouts over 10 acres and specifies a septage-treatment mechanism for layouts under 10 acres; it also requires an underground storm-water drainage system. The supplied record does not state a treatment capacity or confirm completion. RERA amenities
  • Rainwater and landscape: rainwater-harvesting pits are included in the approval extraction; the amenity list records water conservation/rainwater harvesting as “YES.” Progress is listed as 0%, with no independent verification. RERA amenities
  • Electrical and street services: the filed amenity list includes an electrical meter room/sub-station/receiving station. HMDA requires a transformer yard and LED street lighting; no electrical capacity or backup-power details are supplied. RERA amenities
  • Waste: HMDA requires solid-waste disposal space, a bio-compost unit and source segregation. No capacity or completion evidence is supplied.
  • Fire and accessibility: the RERA-filed list includes fire protection/fire-safety requirements, but supplies no system description or progress beyond 0%. The HMDA letter requires paved footpaths and cycling tracks; no accessible-route or fire-clearance documentation is included in the supplied overview evidence. RERA amenities

8. Location, access & connectivity

The registered location is Lemoor village, Kandukur mandal, Ranga Reddy district, PIN 501359. The RERA filing records the west boundary as an existing 12-meter road; the other three boundaries are recorded as other land. RERA record RERA filing

A supplied location record identifies an approximate Outer Ring Road sampled interchange at 11.5 km. This is a location-data distance, not a travel-time estimate. The supplied material does not provide public-transport routes, additional approach-road details, or landmark distances. Location record

9. Developer & development status

The registered promoter is Katyayani Constructions, recorded as a partnership. Its supplied corporate identifier is GSTIN 36AAWFK5611M1ZP. The registration certificate lists a promoter office as “Village: Mandal: District: Hyderabad, Pin: 500079”; the supplied record does not contain a complete registered-office address or official contact details. RERA record Corporate record

The promoter’s Form B, signed by authorised signatory Kothakapu Giridhar Reddy and dated 22 January 2022, declares that the project would be completed by 8 September 2024. The supplied record gives no independently verified construction-progress assessment and no completion or occupancy certificate. The TG-RERA certificate records validity from 25 February 2022 through 8 September 2024, with no extension shown in that certificate.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for PREMIUM COUNTY 4, registration P02400004140, under section 5; issued 25 February 2022, valid through 8 September 2024. The supplied certificate records no extension.
HMDA layout approval recordDraft layout letter, approval 000320/LO/Plg/HMDA/2021, dated 8 September 2021; application 046770/SMD/LT/U6/HMDA/01072021. The letter records forwarding to Lemoor Gram Panchayath for further action and release of plans.
Layout drawingTwo layout sheets are recorded; the extracted layout area statement supplies site and land-use figures. Plot count and plot-size schedule are incomplete in the supplied drawing-derived data. Layout record
Promoter declarationForm B dated 22 January 2022, including the promoter’s completion undertaking and other declarations.
Mortgage / road-area gift deed referencesHMDA letter cites mortgage Document No. 17063/2021, dated 23 August 2021, for the specified plots; it also records a gift deed for the road-affected area, Document No. 16757/2021, dated 17 August 2021.
Completion / occupancy recordsNo final layout release, occupancy certificate, or completion certificate is included in the supplied evidence.

Frequently asked questions

Is PREMIUM COUNTY 4 registered with Telangana RERA?

Yes. PREMIUM COUNTY 4 is registered with the Telangana Real Estate Regulatory Authority as P02400004140; the registration status is New Project.

Who is the developer of PREMIUM COUNTY 4?

The promoter named in the RERA registration is KATYAYANI CONSTRUCTIONS.

Where is PREMIUM COUNTY 4 located?

PREMIUM COUNTY 4 is in Kandukur, LEMOOR, Rangareddy, Telangana (501359).

When will PREMIUM COUNTY 4 be completed?

The promoter's proposed date of completion filed with RERA is 08/09/2024. This is the promoter's declaration, not a guarantee.