Sign in

Maharaja Kosmopolis Tower A

SAMVIR ESTATES LLP AND OTHERS · Sangareddy · RERA P01100011169

MAHARAJA KOSMOPOLIS TOWER A is a residential apartments project in Kollur, RC PURAM mandal, Sangareddy district, developed by SAMVIR ESTATES LLP AND OTHERS. The RERA land details state a total area of 42,393.27 sq.m, and the wider filed development plan identifies five residential blocks, Towers A–E, and a clubhouse. The RERA unit schedule lists 394 3BHK homes, each with a saleable area of 198.21 sq.m; Blocks A–D have 3 Cellars + 1 Stilt + 40 upper floors each, while Block E has 3 Cellars + 1 Stilt + 38 upper floors. The TG-RERA registration is P01100011169, and the proposed completion date recorded in the project header is 30/11/2031.

More from Samvir Estates LLP · 2 projects →

01What we found

RegisteredTG-RERA - valid till 30 Jul 2031
52documents on file - each fact links to its page
6court cases on this project's land (survey 275, 278, Kollur)
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameMAHARAJA KOSMOPOLIS TOWER A RERA record
Project typeResidential apartments RERA record RERA filing
Phase / registered portionThe RERA record names Tower A; the filed phased development plan identifies Towers A–E and a clubhouse. The precise scope of “Tower A” within the wider planned development is not further explained in the supplied record. RERA record
TG-RERA registrationP01100011169 RERA record
Registration validity30/07/2026–30/07/2031 (five years); this is the registration period, not an occupancy certificate. RERA record
Registered promoterSAMVIR ESTATES LLP AND OTHERS RERA record Corporate record
RERA statusRegistration certificate issued under section 5; captured 12/09/2026.

Land and geographic identity

FieldProject record
Locality / revenue villageKollur (TM) / KOLLUR RERA record RERA filing
Mandal / district / PINRC PURAM / Sangareddy / 502300 RERA record
Project survey numbers and subdivisions275/PART and 278/PART RERA record Land records
Site extentRERA land details: total 42,393.27 sq.m, affected area 2,828.07 sq.m, net area 39,565.20 sq.m. RERA filing
HMDA plan extent39,557.44 Sq. Mt; the approval document describes this as the extent for the permitted development.
Boundaries filed with RERAEast and west: neighbours’ land; north: “Future Construction of Ranjitha Singh and others”; south: “15Mts wide Existing 30Mts wide Proposed Road.” RERA filing

Development identity

FieldProject record
Sanctioning authority / approvalHMDA building permission 000640/BP/HMDA/0160/SKP/2025; approval document date is recorded as .07.2026. RERA record
Approved built-up areaThe filed plan extraction records 349244.08 as total proposed built-up area excluding parking and 449942.06 including parking. These are separate plan figures, not saleable or carpet area.
Buildings in the wider planFive residential blocks (A–E) and a clubhouse/amenities building.
Sanctioned floor configurationBlocks A–D: 3 Cellars + 1 Stilt + 40 upper floors each; Block E: 3 Cellars + 1 Stilt + 38 upper floors; clubhouse: 3 Cellars + 1 Ground + 3 upper floors.
Heights recorded in plan extractionBlocks A–D: 119.20 MT each; Block E: 119.70 MT; clubhouse: 15.10 MT.
Parking recorded in plan extractionNo of Cars Proposed 1986.
Unit countsThe RERA filing lists 394 3BHK homes. Four other rows are floor labels, not homes for sale. The approved-plan extraction separately states “num_units” as 1651.00; its meaning is not clarified in the supplied material. RERA unit table RERA unit details

Offering and status

FieldProject record
RERA-filed home type and saleable area3BHK; 198.21 sq.m saleable area per filed configuration. RERA unit table RERA unit details
Filed booking / availability0 booked; 394 available, as last read from the RERA portal; the portal record supplies no as-of date, so counts are indicative. RERA unit table
Construction stageNot established by an independently verified site-progress record in the supplied material. RERA amenities entries show 0% progress for the listed items. RERA amenities
Completion datePromoter’s Form B undertaking: 30/07/2031. The project header separately records proposed completion 30/11/2031; the supplied evidence does not explain this distinction. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents. The permission requires an HMDA Fit for Occupancy certificate before occupation.

2. The project story

MAHARAJA KOSMOPOLIS TOWER A is registered as a residential apartment project at Kollur, in RC PURAM mandal, Sangareddy district. The project’s RERA identity covers survey subdivisions 275/PART and 278/PART. Its HMDA-filed building permission describes a high-rise residential scheme with five residential blocks and a separate clubhouse/amenities building. RERA record Land records

The RERA unit schedule records 394 3BHK homes, each with a filed saleable area of 198.21 sq.m. The RERA portal snapshot reports none booked and 394 available, but does not date those counts. The four additional “first,” “ground,” “second” and “third floor” rows are floor labels, not saleable homes. RERA unit table RERA unit details

The promoter’s Form B declaration undertakes completion by 30/07/2031. That is distinct from the RERA registration validity period ending 30/07/2031 and from the header’s proposed completion date of 30/11/2031. No independent construction-progress evidence or occupancy certificate is supplied, so the project’s physical completion and occupation status cannot be confirmed here. RERA record

3. Master plan, architecture & building design

The HMDA permission describes a multistoried residential development on 39,557.44 Sq. Mt in Survey Nos. 275/PART and 278/PART, Kollur (TM) Village. Its building schedule comprises Blocks A–D, each with three cellars, one stilt and 40 upper floors; Block E with three cellars, one stilt and 38 upper floors; and a clubhouse with three cellars, one ground floor and three upper floors.

The plan extraction records total proposed built-up area of 349244.08 excluding parking and 449942.06 including parking. It also records vacant plot area 28621.38, road-affected area 2828.07, net plot area 39557.44, and balance plot area 34377.76. These are distinct figures as stated in the plan extraction; no FSI-counted area, carpet area, or separate building-footprint figure is supplied.

A phased development plan lists the clubhouse and Towers A–E, but does not specify the phase boundaries or construction sequence. The available extracts do not establish flats per floor, lift or stair counts, internal circulation details, or a measured landscaping/open-space plan.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK3940394198.21 sq.mNot measured in supplied drawing dataNot supplied

Counts and saleable area above are from the TG-RERA filing; booking counts have no stated portal as-of date. The unit schedule also contains four floor-label rows, which are not homes and are excluded from the home count. RERA unit table RERA unit details

The drawing review reports 17 floor-plan documents: 16 scans pending measurement, one sheet with no flats, and 0 measured. Therefore no drawing-based carpet area or room dimensions can be reported. The filed saleable area is not a carpet-area measurement; no loading figure is supplied. Floor plans

5. Parking & vehicle circulation

The plan extraction records No of Cars Proposed 1986. The building permission describes three cellar levels and a stilt level for each residential block, and three cellars in the clubhouse; the plan condition states that cellar/stilt floors are for parking use only. No count of two-wheeler, visitor, or accessible spaces, nor a unit-wise parking allocation, is available in the supplied material.

The permission also specifies one entry and one exit, each with minimum width 4.5 mtrs and height clearance 5 mtrs. It does not provide enough information here to describe ramp geometry, pedestrian separation, or individual buyer parking rights.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
ClubhouseSeparate clubhouse/amenities building: 3 Cellars + 1 Ground + 3 upper floorsIncluded in the building-permission record; completion not verified
Tot-lot / green stripRERA amenity categories include “Green Strip/TOT LOT/Park”; plan extraction lists “Tot-lot” and “Green Strip”RERA amenitiesRERA progress recorded as 0%; no independent completion evidence
ParkListed in third-party vendor data; no size or capacity suppliedPromoter websiteMarketing/vendor claim; not independently verified
Kids’ play areas / sand pitsListed in third-party vendor data; no size or capacity suppliedPromoter websiteMarketing/vendor claim; not independently verified
Landscape garden / central greenListed in third-party vendor data; no size suppliedPromoter websiteMarketing/vendor claim; not independently verified

The available project record does not provide a facility-by-facility clubhouse fit-out schedule, amenity dimensions, or evidence that any amenity has been completed. RERA amenities

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage/STP, storm-water drains, sewage treatment/disposal, solid-waste management, rainwater harvesting, fire protection and electrical meter/sub-station/receiving-station provisions as available in the filing; each listed item carries 0% progress. This is a filed status, not confirmation of completed or operating services. RERA amenities

The HMDA permission requires rainwater-harvesting structures and pits, storm-water drains, a sewage treatment plant with treated water reused for gardening, and garbage/refuse-chute arrangements. It specifies separate underground static water storage of 25.000 lts and a 25,000 lits terrace tank for residential buildings. It also directs the applicant to approach HMWS&SB for bulk water supply or provide a water treatment plant; a permanent water/sewerage connection is conditioned on production of an occupancy certificate.

The permission includes fire-safety provisions such as hose reels and down-comers, extinguishers, emergency lighting, an alarm system, and sprinklers if basement area exceeds 200 sq.m. It also requires Fire Services clearance before seeking an occupancy certificate. A generator is specified as an alternate electricity source. No lift counts or capacities, backup capacity, water-treatment capacity, STP capacity, CCTV or security-system details, or accessibility features are established in the supplied project documents.

8. Location, access & connectivity

The registered project location is Kollur (TM), revenue village KOLLUR, RC PURAM mandal, Sangareddy district, PIN 502300. The project boundary information identifies a road along the south, described in the RERA filing as “15Mts wide Existing 30Mts wide Proposed Road.” The HMDA approval record also refers to proposed road gift deeds, including a proposed 30-metre-wide road and a proposed 40-foot-wide peripheral road. RERA record RERA filing

Supplied location data lists these nearby points and distances: Preeti Urology & Kidney Hospital, BHEL, Lingampally (0.1 km); Nagarjuna Grammar High School (0.4 km); Sri Chaitanya Junior College (Surya Towers) (0.4 km); Balaji Dresses (0.5 km); Rock Garden (0.5 km); Bank of Baroda (0.7 km); Lingampalli railway station (1.4 km); Keerthi Mahal Bus Stop (2.1 km); Startbot (2.1 km); and Miyapur Metro (5.9 km). These are supplied location-data distances; no travel times are provided. Location record

9. Developer & development status

The registered promoter is SAMVIR ESTATES LLP AND OTHERS, identified as an LLP, with GSTIN 36AEMFS1662J1ZM. The project filing gives the promoter address as 4th Floor, Flat No.401, Road No.36, Kollur (TM), RC PURAM, Sangareddy, 502300. The RERA certificate separately prints the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500033”; a fuller office address and official contact details are not supplied here. RERA record Corporate record Parties record

The filed development agreements record a 25% landowner / 75% developer share of developed residential apartments or flats. A promoter affidavit dated 01.08.2026 states that a supplementary allocation agreement was still pending and undertakes not to book or offer units until it is executed. This is a promoter declaration; the supplied evidence does not establish subsequent execution. Parties record

The RERA record provides no independently verified construction progress. The completion undertaking in Form B is 30/07/2031; the registration certificate is valid through 30/07/2031, and the header records proposed completion as 30/11/2031. No occupancy certificate is supplied. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100011169; issued 31/08/2026; valid 30/07/2026–30/07/2031
What the supplied material establishesRegistration of MAHARAJA KOSMOPOLIS TOWER A under section 5.
HMDA building permission
Identifier / date000640/BP/HMDA/0160/SKP/2025; approval date recorded as .07.2026
What the supplied material establishesPermission document for the multistoried residential development and clubhouse on Survey Nos. 275/PART and 278/PART.
Phased development plan
Identifier / dateNo separate number stated
What the supplied material establishesLists Towers A–E and clubhouse with their floor configurations.
Project plan / plan extraction
Identifier / dateFile no. TS/001178/2025
What the supplied material establishesPlan extraction with building, area and parking figures; OCR description does not itself establish a separate approval date.
Commencement-certificate shortfall clarification
Identifier / dateNo certificate number stated
What the supplied material establishesPromoter clarification says local-body proceedings were issued digitally by the Commissioner of Cyberabad Municipal Corporation after manual processing; the supplied extract does not include the proceedings themselves.
Form B affidavit-cum-declaration
Identifier / dateDated 12 June 2026
What the supplied material establishesPromoter declaration, including a completion undertaking of 30/07/2031 and 70% separate-account undertaking.
Supplementary share/allocation affidavit
Identifier / dateDated 01.08.2026
What the supplied material establishesStates that the supplementary allocation agreement was pending and includes an undertaking not to offer units for sale until execution.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied material establishesNo certificate establishing occupancy or completion is included in the reviewed material.

The HMDA permission document lists environmental clearance SEIAAEC No. EC24B3812TG5107564N dated 11.02.2025, structural clearance certificate JNTU/CEH/CIVIL/PC/10510/2025 dated 04.11.2025, and construction-period risk insurance policy 6700010535 dated 16.04.2026. These are references recorded in the permission document.

Other registrations of Maharaja Kosmopolis

Frequently asked questions

Is MAHARAJA KOSMOPOLIS TOWER A registered with Telangana RERA?

Yes. MAHARAJA KOSMOPOLIS TOWER A is registered with the Telangana Real Estate Regulatory Authority as P01100011169; the registration status is New Project.

Who is the developer of MAHARAJA KOSMOPOLIS TOWER A?

The promoter named in the RERA registration is SAMVIR ESTATES LLP AND OTHERS.

Where is MAHARAJA KOSMOPOLIS TOWER A located?

MAHARAJA KOSMOPOLIS TOWER A is in Kollur(TM), KOLLUR, RC PURAM, Sangareddy, Telangana (502300).

When will MAHARAJA KOSMOPOLIS TOWER A be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2031. This is the promoter's declaration, not a guarantee.

More projects in Kollur