MAHARAJA KOSMOPOLIS TOWER B is a residential apartment project in Kollur(TM), RC PURAM Mandal, Sangareddy District. The registered promoter is SAMVIR ESTATES LLP AND OTHERS. The registered site extent is 42,393.27 sq m, and the RERA-filed homes comprise 394 3BHK units with saleable areas of 198.21–217.85 sq m; the HMDA permission describes a larger development of Blocks A–E and a clubhouse, with Blocks A–D comprising 3 Cellars + 1 Stilt + 40 upper floors each and Block E comprising 3 Cellars + 1 Stilt + 38 upper floors. Tower B is registered under TG-RERA P01100011164, and the RERA filing proposes completion by 30/11/2031.

More from Samvir Estates LLP · 2 projects →

01What we found

RegisteredTG-RERA - valid till 30 Jul 2031
52documents on file - each fact links to its page
6court cases on this project's land (survey 275, 278, Kollur)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameMAHARAJA KOSMOPOLIS TOWER B RERA record
Project type / phaseResidential apartment project; the registered project is Tower B RERA record RERA filing
TG-RERA registrationP01100011164 RERA record
Registration validity30/07/2026–30/07/2031; the certificate states five years and is dated 31/08/2026. This is the registration period, not the construction deadline. RERA record
Registered promoterSAMVIR ESTATES LLP AND OTHERS RERA record Corporate record
RERA statusRegistered; certificate granted under section 5

Land and geographic identity

ItemProject record
Locality / revenue villageKollur(TM) / KOLLUR RERA record RERA filing
Mandal / district / PINRC PURAM, Sangareddy, 502300 RERA record RERA filing
Project survey numbers and subdivisions275/PART and 278/PART RERA record Land records
Registered site extentThe RERA land record gives total area 42,393.27 sq m, affected area 2,828.07 sq m, and net area 39,565.20 sq m. RERA filing Land records
Boundaries as filedNorth: “Future Construction of Ranjitha Singh and Others”; south: “15Mts wide Existing 30Mts wide Proposed Road”; east and west: neighbours’ land. RERA filing Land records

Development identity

ItemProject record
Sanctioning authority / principal permissionHyderabad Metropolitan Development Authority (HMDA); building permission 000640/BP/HMDA/0160/SKP/2025, approved date recorded as 07-2026. Approvals record
Approved development described in the permissionMultistoried residential development comprising Blocks A–E and a clubhouse on Survey Nos. 275/PART and 278/PART, at Kollur(TM), extent stated in the permission as 39,557.44 Sq. Mt.
Buildings and sanctioned floorsBlocks A–D: 3 Cellars + 1 Stilt + 40 upper floors each; Block E: 3 Cellars + 1 Stilt + 38 upper floors; clubhouse: 3 Cellars + 1 Ground + 3 upper floors.
Approved built-up areaThe RERA-filed HMDA plan records TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 349244.08, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 449942.06, and NET BUILT UP AREA AND DWELLING UNITS DETAILS GRAND TOTAL 472544.75. These are separate plan labels, and the supplied extract does not explain their calculation or reconcile them.
Unit-count contextThe TG-RERA unit table identifies 398 total units in the registered filing, including 394 3BHK entries and four floor-label rows that are not homes for sale. The separate proposed plan extract records 1651.00 units for its plan scope. RERA unit table

Offering and status

ItemProject record
RERA-filed homes394 3BHK units; saleable area 198.21–217.85 sq m (recorded against filed unit rows). RERA unit table RERA unit details
Booked / availablePortal snapshot lists 0 booked / 394 available 3BHK units; the record has no as-of date, so these counts are indicative. RERA unit table
Construction stageNo verified site-progress measurement is supplied. The RERA amenity record shows 0% against its listed infrastructure entries; that is a filed progress field, not an independent site inspection. RERA amenities
Completion deadlineRERA filing proposes completion by 30/11/2031; the Form-B declaration instead undertakes completion by 30/07/2031. The supplied records do not establish a revised completion date. RERA record RERA filing
Occupancy / completion certificateNo OC or completion certificate for Tower B is identified in the supplied records. Its status is therefore not established in this evidence set. Document index Approvals record

2. The project story

MAHARAJA KOSMOPOLIS TOWER B is registered as a residential apartment project at Kollur(TM), in revenue village KOLLUR, RC PURAM Mandal, Sangareddy District, on Survey Nos. 275/PART and 278/PART. The HMDA permission describes a larger high-rise scheme of five residential blocks (A–E) and a clubhouse; the project’s RERA registration and unit table are for Tower B, rather than a declaration that all five blocks are part of this registered phase. RERA record Land records

The RERA-filed unit table records 394 3BHK homes and currently lists none as booked, but the portal snapshot is undated. No independently verified construction-stage information or Tower B occupancy certificate is supplied. Accordingly, the completion timeline is a promoter-filed undertaking, not evidence that construction is underway or that a particular completion date has been achieved. RERA unit table RERA amenities

3. Master plan, architecture & building design

The HMDA permission describes Blocks A–D as 3 Cellars + 1 Stilt + 40 upper floors and Block E as 3 Cellars + 1 Stilt + 38 upper floors, with a clubhouse of 3 Cellars + 1 Ground + 3 upper floors. The RERA-filed plan extract assigns building heights of 119.20 MT for Blocks A–D, 119.70 MT for Block E and 15.10 MT for the clubhouse.

The plan extract separately labels proposed built-up area excluding parking (349244.08), including parking (449942.06) and a “NET BUILT UP AREA AND DWELLING UNITS DETAILS GRAND TOTAL” (472544.75). These labels are reproduced as recorded; the supplied material does not provide a reconciliation or define them as carpet area, saleable area or FSI-counted area.

The RERA filing also records a 12.00M, 15.00 MT and 30.00 MT road-width notation in the plan extract. HMDA’s permission requires that open space and internal circulation be maintained as approved, and states that parking or construction is not to be placed in setback areas.

A separate phased-wise plan lists the clubhouse and Towers A–E but does not itself identify an approval number or sanction decision. The plan and permission extracts supplied do not establish Tower B’s floor-by-floor apartment arrangement, flats per floor, lift or stair counts, building footprint, or landscaping/open-space measurements.

4. Homes, configurations & floor plans

The TG-RERA unit record identifies 394 3BHK apartments, including one row filed as “3609 3BHL” and 393 rows filed as “3BHK.” The reported saleable-area range is 198.21–217.85 sq m. These are RERA-filed saleable figures, not carpet-area measurements. RERA unit table RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK3940394198.21–217.85 sq mNot measured in supplied drawing reviewNot supplied

The filing also contains four rows labelled “FIRST FLOOR,” “GROUND FLOOR,” “SECOND FLOOR” and “THIRD FLOOR.” These are not classified as homes for sale and are excluded from the apartment count above. RERA unit table RERA unit table

The drawing-review record says 17 drawings were identified, with 16 scans pending and 0 measured; therefore no software-measured carpet area or room dimensions are available to report. Carpet area, where later measured from drawings, would be distinct from the RERA saleable area, which the supplied measurement note says includes the home’s share of common areas. Floor plans

5. Parking & vehicle circulation

The RERA-filed plan extract records No of Cars Proposed 1986. HMDA’s permission describes three cellar levels and one stilt level for each residential block; a separate HMDA plan condition states that cellar/stilt floors are for parking purposes only. The supplied records do not give a Tower B-only parking count, visitor or accessible-space allocation, two-wheeler count, ramp layout, or unit-specific parking allotments.

The permission also requires one entry and one exit to the premises, each with minimum width 4.5 mtrs and height clearance 5 mtrs. The available evidence does not establish that these works have been completed.

6. Amenities, recreation & open spaces

The TG-RERA amenity record lists infrastructure and facilities with a filed progress value of 0% for each entry shown. “Available: YES” in that record is a filed availability field, not independent verification of completion. RERA amenities

Community / clubhouse building
Description / sizeClubhouse: 3 Cellars + 1 Ground + 3 upper floors; no facility-by-facility internal schedule or area supplied.
Evidence sourceHMDA permission
Declared progress / verified statusSanctioned description; completion not verified.
Green strip / tot-lot / park
Description / sizeListed as “Green Strip/TOT LOT/Park”; size not supplied.
Evidence sourceRERA amenity record RERA amenities; HMDA plan
Declared progress / verified statusRERA progress field: 0%; completion not verified.
Community buildings
Description / sizeListed in the RERA amenity schedule; further description not supplied.
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusRERA progress field: 0%; completion not verified.
Internal roads and footpaths
Description / sizeListed; dimensions and completion evidence not supplied beyond the plan road-width notations.
Evidence sourceRERA amenity record RERA amenities; plan
Declared progress / verified statusRERA progress field: 0%; completion not verified.
Storm-water drains and street lighting
Description / sizeListed in the RERA amenity schedule; capacities and details not supplied.
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusRERA progress field: 0%; completion not verified.

The vendor record lists additional advertised features, including kids’ play areas, sand pits, central green, power backup, treated water supply, security, CCTV, community hall and a landscape garden. These are vendor/marketing descriptions, not evidence of RERA-sanctioned or delivered facilities. Promoter website

7. Utilities, building services & safety

HMDA’s permission requires rainwater-harvesting structures, a transformer and garbage house within the premises, a sewerage treatment plant (STP), use of recycled water for gardening, a refuse chute with proper garbage disposal, sump/septic tank and water-harvesting pits, generator backup, and emergency lighting in corridors, common passages and staircases. It specifies separate underground static water storage tank capacity of 25.000 lts and separate terrace tank capacity of 25,000 lits for residential buildings. These are permission requirements; completion is not evidenced here.

The RERA amenity schedule lists water supply, sewerage/STP, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, fire protection, and electrical meter room/sub-station/receiving station, each with progress recorded as 0%. It does not provide service capacities or confirm completed installation. RERA amenities

The HMDA permission requires Fire Services clearance before applying for an Occupancy Certificate and provides for automatic sprinklers where basement area exceeds 200 Sq.mtrs. It also calls for fire-safety, structural-stability and airport/fire NOC conditions to be followed. These are stated conditions; the supplied evidence does not establish the project’s completed fire clearance or OC.

The plan extract includes an EV-charging-infrastructure condition and a dual-piping condition for projects above 10,000 Sq.mt and group housing buildings with 100 units and above. These are recorded plan conditions, not proof of installation. No lift count or capacity, accessible-route details, CCTV/access-control installation, or utility commissioning evidence is supplied.

8. Location, access & connectivity

The registered location is Kollur(TM), revenue village KOLLUR, RC PURAM Mandal, Sangareddy District, PIN 502300. The boundary description identifies neighbours’ land to the east and west, future construction by Ranjitha Singh and others to the north, and a “15Mts wide Existing 30Mts wide Proposed Road” to the south. HMDA’s permission also refers to proposed 40’-0” and 30 Mtrs roads and the plan extract records road-width notations of 12.00M, 15.00 MT and 30.00 MT. RERA record RERA filing

The location dataset provides geocoding and measured nearby points: Preeti Urology & Kidney Hospital, 0.1 km; Nagarjuna Grammar High School and Sri Chaitanya Junior College (Surya Towers), each 0.4 km; Bank of Baroda, 0.7 km; Lingampalli railway station, 1.4 km; Keerthi Mahal Bus Stop and Startbot, each 2.1 km; and Miyapur Metro, 5.9 km. These are dataset distances, not travel-time estimates. Location record

9. Developer & development status

The registered legal promoter is SAMVIR ESTATES LLP AND OTHERS, entity type LLP, GSTIN 36AEMFS1662J1ZM. The RERA filing gives the promoter address as 4th Floor, Flat No.401, Road No.36, Kollur(TM), RC PURAM, Sangareddy, Telangana, PIN 502300; the registration certificate separately prints the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500033.” Corporate record RERA filing

A Form-B declaration signed by authorized signatory SRI. VIVEK NAIDU G on 12 June 2026 states completion by 30/07/2031 and describes the land-title basis as Development Agreement cum General Power of Attorney Nos. 24745/2023 and 30738/2025. The RERA project record separately proposes completion by 30/11/2031. No site-verified progress or OC status is supplied. RERA record

The promoter’s affidavit dated 01.08.2026 concerning Tower B says a registered supplementary/allocation agreement was still pending final mutual consensus and undertakes not to book or offer units until it is executed. The affidavit’s stated undertaking and status are promoter declarations.

10. Approvals, official records & documents

RecordWhat the supplied record establishes
TG-RERA certificateForm C registration P01100011164 for MAHARAJA KOSMOPOLIS TOWER B; valid 30/07/2026–30/07/2031; issued 31/08/2026.
HMDA building permissionPermission 000640/BP/HMDA/0160/SKP/2025 for multistoried residential development on Survey Nos. 275/PART and 278/PART, dated in the record as 07-2026.
Phased building planRERA-filed plan lists clubhouse and Towers A–E with floor configurations; the extract does not itself state an approval number or sanction decision.
Commencement/local-body submissionPromoter clarification says the building/layout permission application had been processed through TG-bPASS, could not be traced after migration to BuildNow, and that Cyberabad Municipal Corporation Commissioner proceedings were enclosed. The supplied extract does not provide the contents of those proceedings.
Other filed project documentsForm-B declaration; Tower B supplementary/allocation affidavit; HMDA plan and RERA-filed plans; land-title search report and encumbrance statement are present in the shared project record.
OC/completion certificateNo Tower B OC or completion certificate is identified in the supplied materials. Document index

Other registrations of Maharaja Kosmopolis

Frequently asked questions

Is MAHARAJA KOSMOPOLIS TOWER B registered with Telangana RERA?

Yes. MAHARAJA KOSMOPOLIS TOWER B is registered with the Telangana Real Estate Regulatory Authority as P01100011164; the registration status is New Project.

Who is the developer of MAHARAJA KOSMOPOLIS TOWER B?

The promoter named in the RERA registration is SAMVIR ESTATES LLP AND OTHERS.

Where is MAHARAJA KOSMOPOLIS TOWER B located?

MAHARAJA KOSMOPOLIS TOWER B is in Kollur(TM), KOLLUR, RC PURAM, Sangareddy, Telangana (502300).

When will MAHARAJA KOSMOPOLIS TOWER B be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2031. This is the promoter's declaration, not a guarantee.