BKS TANVI AVENUE is a residential apartment project at Plot No. 70, Atevelly, Medchal Mandal, Medchal-Malkajgiri District, developed by registered promoter BKAYS CONSTRUCTION, represented by RAVINDER SINGH. The project covers 451.95 sq. m. and comprises one building with 1 Stilt + 5 upper floors and 10 homes, configured as 3BHK units. It is registered under TG-RERA number P02200010591, with a proposed completion date of 22/06/2028.

01What we found

RegisteredTG-RERA - valid till 22 Feb 2028
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameBKS TANVI AVENUE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNot separately identified in the supplied record; the registration concerns the project at Plot No. 70
TG-RERA registrationP02200010591 RERA record
Registration validity22 February 2025 to 22 February 2028, unless extended by the Authority Approvals record
Registered promoterBKAYS CONSTRUCTION, represented by RAVINDER SINGH RERA record
RERA statusRecorded as On-Going Project; registration is valid for the period above RERA record Approvals record

Land and geographic identity

ItemProject record
Locality / plotAtevelly; Plot No. 70 RERA record
Revenue villageAtevelly in the RERA certificate; HMDA approval records Athvelli Village
MandalMedchal RERA record
DistrictMedchal-Malkajgiri RERA record
PIN501401 RERA record
Project survey numbers150/B3, 149/C, 149/D, 150/A, 150/B, 151 and 150/B2
Registered site extent451.95 sq. m. in the HMDA building-approval record
RERA land-area fieldsTotal area 451.95 sq. m.; net area 451.95 sq. m.; affected area recorded as 0 sq. m. RERA filing
BoundariesNorth: Plot No. 69; South: Plot No. 71; East: Plot No. 87; West: 10 wide road RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal approval013586/BP/HMDA/3694/MED/2024, approved 22 February 2025 Approvals record
Approved use and configurationProposed residential building; 1 Stilt + 5 upper floors
Building countOne building/unit in the RERA project fields RERA filing
Approved built-up areaThe approval records proposed built-up area of 1,262.35 sq. m. excluding parking, 1,514.82 sq. m. including parking, and 1,536.07 sq. m. total built-up area
HeightApproval records 14.90 MT. building height, 17.88 mt. from GL, and 20.38mt.; the supplied extract does not identify the measurement basis for each figure
Parking provisionStilt floor parking area recorded as 252.47 sq. m.; the plan extract does not provide a count of parking spaces
Unit count10 units in the RERA unit record; the building-plan extract also records 10 units RERA unit table

Offering and status

ItemProject record
RERA-filed configuration3BHK; 10 units RERA unit table
RERA-filed saleable area154.26 sq. m. per 3BHK RERA unit table
Booked / available0 booked and 10 available in the portal data; the portal record carries no as-of date, so counts are indicative RERA unit table
Construction stageRERA status is “On-Going Project”; no independently verified site-progress measurement is supplied RERA record RERA amenities
Completion datesRERA proposed and revised completion date: 22/06/2028 RERA record
Promoter-declared completion undertakingForm B declares completion by 22 nd February 2028
Occupancy / completion certificateNot recorded as issued; the supplied HMDA approval extract states that an occupancy certificate is required before occupation

2. The project story

BKS TANVI AVENUE is registered as a residential apartment project at Plot No. 70 in Atevelly, Medchal Mandal, Medchal-Malkajgiri District. Its RERA-identified land includes survey numbers 150/B3, 149/C, 149/D, 150/A, 150/B, 151 and 150/B2. The supplied HMDA building approval describes one proposed residential building on a 451.95 sq. m. site, configured as one stilt level and five upper floors.

The RERA unit record lists ten 3BHK homes, with zero booked and ten available in the last-read portal data; no reading date is provided for those counts. The project is recorded as ongoing, but the supplied evidence does not establish construction progress through an independent site inspection or a dated progress certificate. The registration validity period, completion target and occupancy-certificate status are separate matters: registration is valid to 22 February 2028 unless extended, the RERA completion date is 22/06/2028, and no occupancy certificate is shown as issued. RERA unit table RERA record Approvals record

3. Master plan, architecture & building design

The supplied HMDA building-approval extract identifies a single proposed residential building with 1 Stilt + 5 upper floors on a 451.95 sq. m. site. It records 1,262.35 sq. m. of proposed built-up area excluding parking, 1,514.82 sq. m. including parking, and total built-up area of 1,536.07 sq. m. These are approval-extract figures; the record does not provide a separate FSI-counted area or carpet-area total for the building.

The plan extract records a 2.50 M. WIDE PASSAGE, and road widths of 10.0m and 4.50M. It also lists a vacant plot area of 199.49 sq. m. and stilt-floor parking area of 252.47 sq. m. The supplied material does not establish a detailed building footprint, number of homes per floor, lift or stair count, landscaping arrangement, or common-area schedule.

The building-permit extract identifies rainwater harvesting, septic tank, sump, lift, staircase and electrical transformer among plan-listed features. The HMDA approval also states requirements and conditions relating to fire safety, structural safety, water and sewerage, rainwater harvesting, garbage provision and EV-charging infrastructure; these are approval conditions, not evidence that the facilities have been installed or completed.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010154.26 sq. m.120.7–121.3 sq. m. (software-measured range; median 121.2 sq. m.)21%

RERA records ten 3BHK units and a saleable area of 154.26 sq. m. RERA unit table The floor-plan software measurement, based on the supplied approved drawing, measures three 3BHK designs at a median carpet area of 121.2 sq. m., with a range of 120.7–121.3 sq. m.; it is a drawing-based measurement, not a RERA-filed carpet-area disclosure, and the measurement is marked as requiring review. The supplied room schedule for one drawn 3BHK shows living/dining, kitchen, three bedrooms, three toilets and a utility area. Floor plans RERA unit details

Carpet area describes the measured home area in the drawing; saleable area is the RERA-filed figure and is not interchangeable with carpet area. The evidence does not provide a separate RERA-filed balcony, utility or common-area-loading breakdown. Portal booking and availability figures have no stated as-of date. Floor plans RERA unit table

5. Parking & vehicle circulation

The approved-plan extract records 252.47 sq. m. of stilt-floor parking area and identifies the stilt as a parking level. It does not state the number of car or two-wheeler spaces, visitor or accessible parking, or any unit-specific parking allocation. A parking-area figure alone does not establish exclusive allocation to a home.

The HMDA approval requires the stilt/cellar area approved for parking to be used exclusively for vehicle parking and refers to EV-charging infrastructure for parking places. The evidence supplied does not confirm installation, the number of charging points, ramp or driveway arrangements, or pedestrian separation.

6. Amenities, recreation & open spaces

The RERA amenities record lists 14 project items, each with progress shown as 0%. The approval documents also identify building-service and site-utility provisions; these are listed below as recorded or required, not as independently verified completed facilities. No clubhouse or specific sports facility is identified in the supplied evidence. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not statedRERA amenities record RERA amenities0%; completion not independently verified
Water SupplySize or source not statedRERA amenities record RERA amenities0%; completion not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Size/capacity not statedRERA amenities record RERA amenities; plan-listed septic tank0%; completion not independently verified
Storm Water DrainsSize not statedRERA amenities record RERA amenities0%; completion not independently verified
Green Strip/TOT LOT/ParkArea not statedRERA amenities record RERA amenities0%; completion not independently verified
Street LightingQuantity not statedRERA amenities record RERA amenities0%; completion not independently verified
Community BuildingsDetails not statedRERA amenities record RERA amenities0%; completion not independently verified
Treatment and disposal of sewage and sullage waterSystem/capacity not statedRERA amenities record RERA amenities0%; completion not independently verified
Solid Waste Management and DisposalDetails not statedRERA amenities record RERA amenities0%; completion not independently verified
Water Conservation, Rain water HarvestingCapacity not stated; rainwater harvesting is also listed in the plan extractRERA amenities record RERA amenities0% in RERA amenities record; installation not independently verified
Energy managementDetails not statedRERA amenities record RERA amenities0%; completion not independently verified
Fire Protection and Fire Safety RequirementsSystem/capacity not statedRERA amenities record RERA amenities; HMDA approval conditions0%; completion not independently verified
Electrical Meter Room, Sub-Station, Receiving StationDetails not stated; transformer listed in plan extractRERA amenities record RERA amenities0%; completion not independently verified
Aggregate area of recreational Open SpaceArea not statedRERA amenities record RERA amenities0%; completion not independently verified

7. Utilities, building services & safety

The building-plan extract lists a sump, septic tank, rainwater harvesting, lift, staircase and electrical transformer. The HMDA approval contains conditions requiring water storage, sewerage arrangements and treatment, rainwater harvesting, a garbage house, generator backup, emergency lighting and fire-safety provisions. It specifies separate underground and terrace water-storage tanks of 25,000 lts. each and describes fire-protection requirements, including hose reel/down corner and specified extinguishers. These are approval-document conditions or plan listings; the supplied evidence does not confirm installation, capacity beyond the stated tanks, or completion.

The HMDA approval requires the local body to allow occupation only after the stated conditions are met and a fit-for-occupancy certificate is issued; it also states that an occupancy certificate is compulsory before occupation. The evidence does not provide an issued occupancy certificate, verified fire clearance, lift capacity, accessible route or ramp details, CCTV installation status, or completed utility connections.

8. Location, access & connectivity

The project’s registered location is Plot No. 70, Atevelly, Medchal, Medchal-Malkajgiri, PIN 501401. The HMDA approval identifies the site as Athvelli Village, Medchal Mandal, Medchal-Malkajgiri District, and lists the same project survey numbers. The cadastral parcel centroid is 17.66501, 78.49092. Cadastral map

The project boundary record identifies a 10 wide road to the west. The supplied location data gives the nearest sampled Outer Ring Road interchange as approximately 4.1 km; this is a location-data measurement, not a travel-time estimate. The supplied evidence does not provide public-transport routes or additional verified nearby landmarks. RERA filing Location record

9. Developer & development status

The registered promoter is BKAYS CONSTRUCTION, represented by RAVINDER SINGH. The RERA fields identify the organization type as Proprietorship. The supplied registration record identifies the promoter’s representative but does not provide a verified corporate registration identifier or official contact details/site. Parties record RERA filing

Ravinder Singh’s Form B declaration, verified at Hyderabad on 18-12-2025, states that the project will be completed by 22 nd February 2028 and includes declarations about project funds, approvals and audits. The RERA project fields separately record the proposed and revised completion date as 22/06/2028. The evidence does not include independent construction-progress verification or an issued occupancy certificate. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200010591; valid 22 February 2025–22 February 2028 unless extended
What the supplied record establishesForm C certificate for BKS TANVI AVENUE, naming BKAYS CONSTRUCTION represented by RAVINDER SINGH as promoter
HMDA building-construction technical approval
Identifier / date013586/BP/HMDA/3694/MED/2024; 22 February 2025
What the supplied record establishesTechnical approval for a proposed residential building at Plot No. 70, 1 Stilt + 5 upper floors; construction and occupation are subject to the stated approval conditions
Building-plan extract
Identifier / dateHMDA approval record
What the supplied record establishesRecords the site area, unit count, floor configuration, built-up-area figures, stilt parking area and listed plan features
Layout-plan filing
Identifier / dateDocument filed as layout-plan material
What the supplied record establishesContains building-plan details and site/survey information; a separate approved-layout record is not established by this extract
Form B declaration
Identifier / date18-12-2025
What the supplied record establishesPromoter declaration including a completion undertaking by 22 nd February 2028 and project-fund and approval commitments
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesThe HMDA approval states that occupancy certification is required before occupation; the supplied records do not show an issued certificate

Frequently asked questions

Is BKS TANVI AVENUE registered with Telangana RERA?

Yes. BKS TANVI AVENUE is registered with the Telangana Real Estate Regulatory Authority as P02200010591; the registration status is On-Going Project.

Who is the developer of BKS TANVI AVENUE?

The promoter named in the RERA registration is BKAYS CONSTRUCTION represented by Ravinder singh.

Where is BKS TANVI AVENUE located?

BKS TANVI AVENUE is in ATEVELLY, Medchal, Medchal-Malkajgiri, Telangana (501401).

When will BKS TANVI AVENUE be completed?

The promoter's proposed date of completion filed with RERA is 22/06/2028. This is the promoter's declaration, not a guarantee.

More projects in Atevelly