Kasturi Nilayam
KASTURI NILAYAM · Medchal-Malkajgiri · RERA P02200005554
KASTURI NILAYAM is a residential apartment project in Uppal, Uppal Mandal, Medchal-Malkajgiri District, developed by the registered promoter KASTURI NILAYAM. It is on 417.99 sq. m of land and comprises one building, Block A, with 1 stilt + 5 upper floors and 10 homes: five 2BHK and five 3BHK. Its TG-RERA registration is P02200005554, and the RERA filing records proposed completion on 30/04/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | KASTURI NILAYAM RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified; registered land is Plot No. 1551 PART |
| TG-RERA registration | P02200005554 |
| Registration validity | 20/12/2022 to 31/12/2026; certificate says four years, unless extended by the Authority |
| Registered promoter | KASTURI NILAYAM RERA record |
| RERA status | Registered; the supplied certificate records no extension |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / plot | Uppal; Plot No. 1551 PART RERA filing |
| Revenue village | Uppal; the approval and title documents also identify Uppal Bhagat / Uppal Bagayath RERA filing |
| Mandal | Uppal RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500039 in the project header; the certificate’s promoter-office address shows Pin 500003 RERA record |
| Project survey numbers and subdivisions, as recorded | 1TO40, 282TO368, 369(P), 370 TO 373, 374 (P)375 TO 387, 395 TO 401, 454, 456 TO 459, 505(P), 510 TO 564 |
| Registered site extent | 417.99 sq. m RERA filing |
| Net / total land area | Net 417.99 sq. m; total 417.99 sq. m; affected area reported as 0 sq. m RERA filing |
| Boundaries | East: ROAD WIDTH 18; West: PLOT NO 1548; North: PLOT NO 1550; South: PLOT NO 1551 PART AND 1552 RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) |
| Principal approval | 045699/GHT/R1/U6/HMDA/04052021; approved 31/12/2021 Approvals record |
| Approval description | HMDA technical approval for a residential apartment building, Block A; the document says building plans are to be sanctioned by the Executive Authority in conformity with the technically approved plans |
| Approved built-up area | The approval extraction lists “Total Built up Area: 1052.45 Sq.mts” and “Proposed Built-up Area: 1262.94 Sq.mts”; these are distinct recorded figures |
| Buildings / blocks | One building; Block A RERA filing |
| Floor configuration | 1 stilt + 5 upper floors |
| Parking levels / provision | Stilt is recorded; a parking count or allocation is not established in the supplied records |
| Units | 1 unit is entered in the land-details fields as total building units “as per approved plan” and 1 as proposed units “as per agreement”; the RERA configuration schedule separately records 10 homes RERA filing RERA unit table |
| Height | 14.75, as listed in the approval’s sanctioned parameters; unit not stated in the extraction |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configurations | 2BHK and 3BHK RERA unit table |
| RERA-filed saleable area | 2BHK: 112.87 sq. m; 3BHK: 142.14 sq. m RERA unit table |
| Booked / available | Portal-read figures: 0 booked and 5 available for each configuration (10 available total); the booking record has no stated as-of date RERA unit table |
| Construction stage | No construction-progress percentage or independent site-progress verification supplied; portal amenity progress entries shown in the supplied record are 0% RERA amenities |
| Completion date | RERA filing/header proposed completion: 30/04/2027; Form B declaration states completion by 31/12/2026 RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate supplied; the approval requires an occupancy certificate before occupation |
The two completion dates above are reported as separate records, not reconciled here. Registration validity, completion timing and occupancy-certificate status are separate matters.
The project story
KASTURI NILAYAM is a registered residential apartment project on Plot No. 1551 PART in Uppal, Uppal Mandal, Medchal-Malkajgiri District. The registered land extent is 417.99 sq. m. The RERA record identifies one building, while its unit schedule lists five 2BHK and five 3BHK homes. RERA record RERA filing RERA unit table
HMDA’s technical approval document describes Block A as a residential building with one stilt and five upper floors. The document records proposed built-up area of 1262.94 sq. m and calls for the applicant to approach the Executive Authority for sanction and release of the technically approved plans. The supplied evidence does not establish the current physical construction stage or independent site progress. RERA registration is valid through 31/12/2026 unless extended; the supplied records give separate completion-date entries, and no occupancy or completion certificate is provided. RERA record
Master plan, architecture & building design
The project is recorded as one residential building, Block A, on 417.99 sq. m of site area. HMDA’s technical approval describes one stilt and five upper floors and gives a building height of 14.75 (unit not stated in the extraction). Its sanctioned-parameter extraction lists “Total Built up Area: 1052.45 Sq.mts” and “Proposed Built-up Area: 1262.94 Sq.mts”; these are reported with their original labels and are not treated as interchangeable measures. RERA filing
The supplied floor-plan record contains two drawings, but neither is recorded as a measured flat drawing; no flat-level layout, room dimensions, circulation, lift or stair details, building footprint, or common-area distribution can therefore be described from this evidence. Floor plans The HMDA approval identifies a tot-lot and space for a transformer among its conditions and listed provisions. No layout-plan extraction is supplied.
Homes, configurations & floor plans
The RERA configuration schedule lists 10 homes. Booked and available figures below are portal-read and have no stated as-of date. RERA saleable areas are filed values; the supplied drawing record reports no measured flats, so no drawing-based carpet areas are available. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 112.87 sq. m | Not measured in supplied drawings | Not supplied |
| 3BHK | 5 | 0 | 5 | 142.14 sq. m | Not measured in supplied drawings | Not supplied |
The supplied floor-plan record says its two drawings have no measured flats. Accordingly, room arrangement and dimensions, balcony or utility areas, and the division between carpet and common-area loading cannot be established from the available drawing data. Floor plans
Parking & vehicle circulation
The building approval records one stilt, but the supplied evidence does not state the number of car or two-wheeler spaces, visitor or accessible spaces, parking allocations to individual homes, or whether parking is stilt, surface, mechanical or otherwise. The approval extraction also lists a tot-lot and transformer space, but does not provide circulation or ramp details.
Covered car parking appears in a vendor-listed amenities set, not as an established sanctioned count or unit allocation; no spaces-per-home figure can be verified. Promoter website
Amenities, recreation & open spaces
The RERA amenity record lists project infrastructure and facilities, but its progress entries are 0%; this is not independent evidence of site completion. HMDA’s approval extraction lists a tot-lot, transformer and rainwater-harvesting structures. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse, swimming pool, gym, children’s play area | Vendor-listed amenities; no sizes or quantities supplied | Promoter website | Marketing/vendor listing; completion not verified |
| Internal roads and footpaths | No size supplied | RERA amenities | RERA amenity record: 0%; completion not verified |
| Green strip / tot-lot / park | No size supplied; approval identifies tot-lot | RERA amenities | RERA amenity record: 0%; completion not verified |
| Community buildings | No size or use details supplied | RERA amenities | RERA amenity record: 0%; completion not verified |
| Water conservation / rainwater harvesting | Approval lists rainwater-harvesting structures; no capacity supplied | RERA amenities | RERA amenity record: 0%; completion not verified |
| Street lighting | No details supplied | RERA amenities | RERA amenity record: 0%; completion not verified |
Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available (“YES”). The same record lists sewage treatment and disposal, solid-waste management, energy management and fire protection/safety requirements, but supplies no capacities, system specifications or completion evidence; progress entries shown are 0%. RERA amenities
HMDA’s approval extraction lists a transformer, garbage house and rainwater-harvesting structures, and requires an occupancy certificate before occupation. It also requires the tot-lot to be fenced and maintained as greenery before issuance of the occupancy certificate. These are approval-record conditions, not confirmation that the facilities have been installed or that an occupancy certificate has been issued. The supplied evidence does not establish water source or storage capacity, STP capacity or reuse, backup power, lift provision, fire-system details, CCTV/security, or accessible circulation.
Location, access & connectivity
The registered project location is Plot No. 1551 PART, Uppal, Uppal Mandal, Medchal-Malkajgiri District, PIN 500039. RERA record RERA filing The cadastral parcel-centroid record gives coordinates 17.40121, 78.35418. Location record
The supplied location dataset lists the Financial District (Nanakramguda) at 2.0 km, ICICI Bank at 1.7 km, Holy Mary College at 2.4 km, Sankaraya Eye Hospital at 0.4 km, ADP at 1.6 km, an unnamed park at 0.4 km and Keystone International School at 1.3 km. These are listed distances; no travel times or route details are supplied. Location record No approach-road or public-transport details are established in the supplied structured location record.
Developer & development status
The registered promoter is KASTURI NILAYAM, identified in the promoter information as a partnership and with GSTIN 36AAYFK7134P1ZB. The supplied promoter address is KASTURI NILAYAM, Uppal Bhagayth, Uppal Bhagat, Uppal, Uppal Mandal, Medchal-Malkajgiri, 500039. RERA record Corporate record RERA filing The RERA record names MEKALA SAI KIRAN REDDY as partner and REVANTH REDDY KANUGANTI as authorized signatory. Parties record
The Form B affidavit is a promoter declaration that the project land is free from encumbrances, that 70% of amounts realized will be placed in a separate account and used for land and construction costs, and that the project would be completed by 31/12/2026. The project header separately records proposed completion as 30/04/2027. No construction-progress percentage or independent site verification is supplied. RERA record No occupancy or completion certificate is supplied.
Approvals, official records & documents
| Details | FORM ‘C’; project KASTURI NILAYAM; registration P02200005554; valid 20/12/2022–31/12/2026 unless extended |
|---|
| Details | Approval no. 045699/GHT/R1/U6/HMDA/04052021; approved 31/12/2021; Block A, one stilt and five upper floors |
|---|
| Details | Affidavit by M Sai Kiran as authorized signatory of M/s. Kasturi Nilayam; includes title, encumbrance, completion and fund-handling declarations |
|---|
| Details | Not supplied in the reviewed project records; HMDA approval says an occupancy certificate is compulsory before occupation |
|---|
| Details | No extracted layout-plan or measured flat-plan details supplied; the drawing record lists two sheets and no measured flats |
|---|---|
| Evidence | Floor plans |
The HMDA technical approval extraction records a mortgage in favour of MC, HMDA of 10.00% of built-up area—111.15 sq. m on the second floor—under mortgage deed No. 15377/2021 dated 30/9/2021. The approval also states that the mortgaged built-up area may be registered only after an occupancy certificate is produced.
Project at a glance
Project identity
Registered project name: KASTURI NILAYAM
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified; registered land is Plot No. 1551 PART
TG-RERA registration: P02200005554
Registration validity: 20/12/2022 to 31/12/2026; certificate says four years, unless extended by the Authority
Registered promoter: KASTURI NILAYAM
RERA status: Registered; the supplied certificate records no extension
Land and geographic identity
Locality / plot: Uppal; Plot No. 1551 PART
Revenue village: Uppal; the approval and title documents also identify Uppal Bhagat / Uppal Bagayath
Mandal: Uppal
District: Medchal-Malkajgiri
PIN: 500039 in the project header; the certificate’s promoter-office address shows Pin 500003
Project survey numbers and subdivisions, as recorded: 1TO40, 282TO368, 369(P), 370 TO 373, 374 (P)375 TO 387, 395 TO 401, 454, 456 TO 459, 505(P), 510 TO 564
Registered site extent: 417.99 sq. m
Net / total land area: Net 417.99 sq. m; total 417.99 sq. m; affected area reported as 0 sq. m
Boundaries: East: ROAD WIDTH 18; West: PLOT NO 1548; North: PLOT NO 1550; South: PLOT NO 1551 PART AND 1552
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal approval: 045699/GHT/R1/U6/HMDA/04052021; approved 31/12/2021
Approval description: HMDA technical approval for a residential apartment building, Block A; the document says building plans are to be sanctioned by the Executive Authority in conformity with the technically approved plans
Approved built-up area: The approval extraction lists “Total Built up Area: 1052.45 Sq.mts” and “Proposed Built-up Area: 1262.94 Sq.mts”; these are distinct recorded figures
Buildings / blocks: One building; Block A
Floor configuration: 1 stilt + 5 upper floors
Parking levels / provision: Stilt is recorded; a parking count or allocation is not established in the supplied records
Units: 1 unit is entered in the land-details fields as total building units “as per approved plan” and 1 as proposed units “as per agreement”; the RERA configuration schedule separately records 10 homes
Height: 14.75, as listed in the approval’s sanctioned parameters; unit not stated in the extraction
Offering and status
RERA-filed configurations: 2BHK and 3BHK
RERA-filed saleable area: 2BHK: 112.87 sq. m; 3BHK: 142.14 sq. m
Booked / available: Portal-read figures: 0 booked and 5 available for each configuration (10 available total); the booking record has no stated as-of date
Construction stage: No construction-progress percentage or independent site-progress verification supplied; portal amenity progress entries shown in the supplied record are 0%
Completion date: RERA filing/header proposed completion: 30/04/2027; Form B declaration states completion by 31/12/2026
Occupancy / completion certificate: No occupancy or completion certificate supplied; the approval requires an occupancy certificate before occupation
The two completion dates above are reported as separate records, not reconciled here. Registration validity, completion timing and occupancy-certificate status are separate matters.
The project story
KASTURI NILAYAM is a registered residential apartment project on Plot No. 1551 PART in Uppal, Uppal Mandal, Medchal-Malkajgiri District. The registered land extent is 417.99 sq. m. The RERA record identifies one building, while its unit schedule lists five 2BHK and five 3BHK homes.
HMDA’s technical approval document describes Block A as a residential building with one stilt and five upper floors. The document records proposed built-up area of 1262.94 sq. m and calls for the applicant to approach the Executive Authority for sanction and release of the technically approved plans. The supplied evidence does not establish the current physical construction stage or independent site progress. RERA registration is valid through 31/12/2026 unless extended; the supplied records give separate completion-date entries, and no occupancy or completion certificate is provided.
Master plan, architecture & building design
The project is recorded as one residential building, Block A, on 417.99 sq. m of site area. HMDA’s technical approval describes one stilt and five upper floors and gives a building height of 14.75 (unit not stated in the extraction). Its sanctioned-parameter extraction lists “Total Built up Area: 1052.45 Sq.mts” and “Proposed Built-up Area: 1262.94 Sq.mts”; these are reported with their original labels and are not treated as interchangeable measures.
The supplied floor-plan record contains two drawings, but neither is recorded as a measured flat drawing; no flat-level layout, room dimensions, circulation, lift or stair details, building footprint, or common-area distribution can therefore be described from this evidence. The HMDA approval identifies a tot-lot and space for a transformer among its conditions and listed provisions. No layout-plan extraction is supplied.
Homes, configurations & floor plans
The RERA configuration schedule lists 10 homes. Booked and available figures below are portal-read and have no stated as-of date. RERA saleable areas are filed values; the supplied drawing record reports no measured flats, so no drawing-based carpet areas are available.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 112.87 sq. m | Not measured in supplied drawings | Not supplied |
| 3BHK | 5 | 0 | 5 | 142.14 sq. m | Not measured in supplied drawings | Not supplied |
The supplied floor-plan record says its two drawings have no measured flats. Accordingly, room arrangement and dimensions, balcony or utility areas, and the division between carpet and common-area loading cannot be established from the available drawing data.
Parking & vehicle circulation
The building approval records one stilt, but the supplied evidence does not state the number of car or two-wheeler spaces, visitor or accessible spaces, parking allocations to individual homes, or whether parking is stilt, surface, mechanical or otherwise. The approval extraction also lists a tot-lot and transformer space, but does not provide circulation or ramp details.
Covered car parking appears in a vendor-listed amenities set, not as an established sanctioned count or unit allocation; no spaces-per-home figure can be verified.
Amenities, recreation & open spaces
The RERA amenity record lists project infrastructure and facilities, but its progress entries are 0%; this is not independent evidence of site completion. HMDA’s approval extraction lists a tot-lot, transformer and rainwater-harvesting structures.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse, swimming pool, gym, children’s play area | Vendor-listed amenities; no sizes or quantities supplied | Marketing/vendor listing; completion not verified | |
| Internal roads and footpaths | No size supplied | RERA amenity record: 0%; completion not verified | |
| Green strip / tot-lot / park | No size supplied; approval identifies tot-lot | RERA amenity record: 0%; completion not verified | |
| Community buildings | No size or use details supplied | RERA amenity record: 0%; completion not verified | |
| Water conservation / rainwater harvesting | Approval lists rainwater-harvesting structures; no capacity supplied | RERA amenity record: 0%; completion not verified | |
| Street lighting | No details supplied | RERA amenity record: 0%; completion not verified |
Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available (“YES”). The same record lists sewage treatment and disposal, solid-waste management, energy management and fire protection/safety requirements, but supplies no capacities, system specifications or completion evidence; progress entries shown are 0%.
HMDA’s approval extraction lists a transformer, garbage house and rainwater-harvesting structures, and requires an occupancy certificate before occupation. It also requires the tot-lot to be fenced and maintained as greenery before issuance of the occupancy certificate. These are approval-record conditions, not confirmation that the facilities have been installed or that an occupancy certificate has been issued. The supplied evidence does not establish water source or storage capacity, STP capacity or reuse, backup power, lift provision, fire-system details, CCTV/security, or accessible circulation.
Location, access & connectivity
The registered project location is Plot No. 1551 PART, Uppal, Uppal Mandal, Medchal-Malkajgiri District, PIN 500039. The cadastral parcel-centroid record gives coordinates 17.40121, 78.35418.
The supplied location dataset lists the Financial District (Nanakramguda) at 2.0 km, ICICI Bank at 1.7 km, Holy Mary College at 2.4 km, Sankaraya Eye Hospital at 0.4 km, ADP at 1.6 km, an unnamed park at 0.4 km and Keystone International School at 1.3 km. These are listed distances; no travel times or route details are supplied. No approach-road or public-transport details are established in the supplied structured location record.
Developer & development status
The registered promoter is KASTURI NILAYAM, identified in the promoter information as a partnership and with GSTIN 36AAYFK7134P1ZB. The supplied promoter address is KASTURI NILAYAM, Uppal Bhagayth, Uppal Bhagat, Uppal, Uppal Mandal, Medchal-Malkajgiri, 500039. The RERA record names MEKALA SAI KIRAN REDDY as partner and REVANTH REDDY KANUGANTI as authorized signatory.
The Form B affidavit is a promoter declaration that the project land is free from encumbrances, that 70% of amounts realized will be placed in a separate account and used for land and construction costs, and that the project would be completed by 31/12/2026. The project header separately records proposed completion as 30/04/2027. No construction-progress percentage or independent site verification is supplied. No occupancy or completion certificate is supplied.
Approvals, official records & documents
| Details | FORM ‘C’; project KASTURI NILAYAM; registration P02200005554; valid 20/12/2022–31/12/2026 unless extended |
|---|
| Details | Approval no. 045699/GHT/R1/U6/HMDA/04052021; approved 31/12/2021; Block A, one stilt and five upper floors |
|---|
| Details | Affidavit by M Sai Kiran as authorized signatory of M/s. Kasturi Nilayam; includes title, encumbrance, completion and fund-handling declarations |
|---|
| Details | Not supplied in the reviewed project records; HMDA approval says an occupancy certificate is compulsory before occupation |
|---|
| Details | No extracted layout-plan or measured flat-plan details supplied; the drawing record lists two sheets and no measured flats |
|---|
The HMDA technical approval extraction records a mortgage in favour of MC, HMDA of 10.00% of built-up area—111.15 sq. m on the second floor—under mortgage deed No. 15377/2021 dated 30/9/2021. The approval also states that the mortgaged built-up area may be registered only after an occupancy certificate is produced.
Frequently asked questions
Is KASTURI NILAYAM registered with Telangana RERA?
Yes. KASTURI NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02200005554; the registration status is New Project.
Who is the developer of KASTURI NILAYAM?
The promoter named in the RERA registration is KASTURI NILAYAM.
Where is KASTURI NILAYAM located?
KASTURI NILAYAM is in UPPAL, Medchal-Malkajgiri, Telangana (500039).
When will KASTURI NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 30/04/2027. This is the promoter's declaration, not a guarantee.
More projects in Uppal







