Sri Sai Mahalakshmi
CHINTALA · Nizamabad · RERA P03100004294
SRI SAI MAHALAKSHMI is a plotted development in Mentrajpalle, DICHPALLY Mandal, Nizamabad District. The registered promoter is Chintala Dharshan Goud. The registered site area is 9914 sq. m; the supplied record does not state the number or sizes of plots or any towers or floors. It is registered under TG-RERA number P03100004294, with proposed completion recorded as 31/12/2021.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SRI SAI MAHALAKSHMI RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Not separately identified; the registration certificate covers the project registered under P03100004294. |
| TG-RERA registration number | P03100004294 RERA record |
| Registration validity | Certificate states validity commencing 24/03/2022 and ending 31/12/2021; the supplied record identifies no extension. This is the certificate’s stated registration-validity information, separate from the completion undertaking below. |
| Registered promoter | Chintala Dharshan Goud (certificate spelling); the Form B declaration names C. DHARSHAN GOUD. |
| RERA record status | The certificate records registration under section 5; no current status beyond the supplied certificate is established here. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Mentrajpalle; the layout order describes Mentrajpally (G.P) and “Mentrajpally Village Shivar.” RERA record |
| Mandal | DICHPALLY (also rendered “Dichpally” in the layout order). RERA record |
| District / PIN | Nizamabad / 503230 RERA record |
| Project survey numbers and subdivisions | 566/AA and 566/E (certificate and RERA filing); the layout order describes land in 566/P1. RERA filing |
| Registered site extent | 9914 sq. m total area and 9914.00 sq. m net area, as recorded in the RERA filing. RERA filing |
| Layout-order extent | Ac. 2.18 Gts, as stated in the NUDA order. |
| Boundaries in RERA filing | East: LAND OF BIYYA MANIKYAM; West: LAND OF NAYUDU PRABHAKAR; North: CART WAY; South: LAND OF BIYYA MANIKYAM. RERA filing |
Development identity
| Field | Record |
|---|---|
| Authority / principal approval reference | The RERA filing identifies DTCP and plan approval 1804/2019/H, approved date 24/10/2019. The supplied layout-order document is from Nizamabad Urban Development Authority (NUDA) and describes a draft technical layout pattern. RERA filing Approvals record |
| Other layout-order references | Roc. No. 59/NUDA/2019 (date recorded as “-03-2021”); L.P. No. 28/2019/NUDA; Director of Town and Country Planning letters 1804/2019/H dated 24-10-2019 and 3840/2019/H dated 24-09-2019; D.D. No. 075179 dated 30-12-2020; mortgage deed Doc. No. 2162/2021 dated 02-02-2021. |
| Approved built-up area | 5989 sq. m is recorded in the RERA filing; no supplied drawing-derived breakdown clarifies its scope. RERA filing |
| Buildings / floors | Not disclosed in the supplied evidence for this plotted development. RERA filing Document index |
| Parking | The supplied project evidence does not give a parking count, parking levels, or plot-wise parking allocation. RERA amenities |
| Layout land-use figures in NUDA order | Open space: 7.50%, Ac. 0.184 cents; social infrastructure: 2.5%, Ac. 0.0613cents; roads: 28.57, Ac.0.70 cents; utilities: 1.0%, Ac.0.025 cents; salable area: 15.54%, Ac.0.23 Cents or 1113.2.0 Sq Yards. These are the figures stated in the supplied order. |
Offering and status
| Field | Record |
|---|---|
| Unit type / plot count and sizes | Plotted development; plot count, plot-size bands, and RERA-filed saleable-size range are not provided in the supplied data. RERA record RERA unit table Layout record |
| Booked / available counts | Not disclosed in the supplied data. RERA unit table |
| Construction stage | The RERA amenities record gives declared completion percentages for selected infrastructure items; this is not independent site verification. A vendor-supplied description calls the development completed, but it is not the primary RERA record. RERA amenities Promoter website |
| Completion dates | RERA header proposed completion: 31/12/2021. Form B declaration undertaking: completion on or before 06/12/2022. RERA record |
| Completion / occupancy certificate | No completion certificate or occupancy certificate is identified in the supplied documents. Document index |
2. The project story
SRI SAI MAHALAKSHMI is registered as a plotted development in Mentrajpalle, Dichpally Mandal, Nizamabad District. The RERA record identifies the registered land by Survey Nos. 566/AA and 566/E and records a site area of 9914 sq. m. The supplied NUDA order concerns a proposed layout on Sy.No. 566/P1 and calls the layout pattern a draft technical layout; it lists roads, open space, social infrastructure and utilities as layout components. RERA record RERA filing
The project is presented as a plot layout, not an apartment or villa scheme. The available evidence does not state the number or dimensions of sale plots, booked or available plots, or a plot-wise construction programme. The NUDA order directs the applicant to complete development works within THREE (3) YEARS; the order’s listed layout components and the RERA amenities record’s declared progress percentages are set out below. These percentages are filing data, not independent confirmation of completed works. RERA amenities
3. Master plan, architecture & building design
This is a plotted layout, so apartment tower, floor, flat-per-floor and building-height information is not applicable on the supplied record. The RERA filing records 9914 sq. m total and 9914.00 sq. m net site area, and 5989 sq. m as approved built-up area; the supplied evidence does not explain the built-up-area scope or provide a building-by-building drawing schedule. RERA filing RERA filing
The NUDA order describes a draft technical layout pattern, with road widths recorded as 18 mts and above. The order’s stated land-use figures and the identification of Plot Nos 24 & 26 to 30 as mortgage plots in favour of the Vice-Chairman, NUDA-Nizamabad, under mortgage deed Doc. No. 2162/2021, are recorded above. The supplied evidence does not provide a complete plot schedule or detailed layout drawing for analysis.
4. Homes, configurations & floor plans
This project is a plotted development. Plot counts, plot-size bands, booked and available counts, and RERA-filed saleable areas are not present in the supplied data, so a configuration table cannot be populated without inventing values. RERA unit table Layout record
Two plan drawings are recorded, but both are scans pending review and none has been software-measured. The supplied floor-plan data therefore does not support measured carpet areas or room-level descriptions. Floor plans
5. Parking & vehicle circulation
Parking is listed as an amenity by the vendor, but no parking-space count, visitor or accessible provision, parking arrangement, or plot-wise allocation is supplied. The NUDA order records roads of 18 mts and above and refers to demarcating the layout on the ground as per the draft plan; the provided evidence does not describe vehicle entries, exits, ramps, pedestrian separation, or EV charging. Promoter website
6. Amenities, recreation & open spaces
The NUDA order’s proposed layout infrastructure and land-use components are recorded above. The RERA amenities record separately reports progress percentages for selected items. Neither set of information independently verifies completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Roads | Roads area stated as Ac.0.70 cents; road widths 18 mts and above | NUDA layout order | RERA amenities record does not give a roads percentage; no independent verification supplied. |
| Open space / park | Open space 7.50%, Ac. 0.184 cents; park development also listed | NUDA order; amenities record | Green Strip/TOT LOT/Park: 80% declared. RERA amenities |
| Social infrastructure | 2.5%, Ac. 0.0613cents | NUDA layout order | No completion status supplied. |
| Utilities land | 1.0%, Ac.0.025 cents | NUDA layout order | No completion status supplied. |
| Avenue plantation | Listed as a layout development item | NUDA layout order | No progress percentage supplied. |
| Internal roads and footpaths | Listed in amenities record | Amenities record | 90% declared. RERA amenities |
| Street lighting | Listed in amenities record | Amenities record | 75% declared. RERA amenities |
7. Utilities, building services & safety
The NUDA order lists a common septic tank /STP, internal water-supply pipelines, an overhead tank, a transformer, rainwater-harvesting pits, storm-water drains and underground drainage lines. These are listed as layout development items; the supplied record does not provide capacities, technical specifications, commissioning evidence or independent verification.
The RERA amenities record reports declared progress of 90% for water supply, 85% for sewerage (chambers, lines, septic tank, STP), and 80% for water conservation/rainwater harvesting. It records 0% for storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, fire protection and fire-safety requirements, and electrical meter room/sub-station/receiving station. These are the supplied declared figures, not a finding that a facility is absent or a certification of statutory compliance. RERA amenities
8. Location, access & connectivity
The registered location is Mentrajpalle, DICHPALLY Mandal, Nizamabad District, Telangana, PIN 503230; the RERA filing gives the street/locality as VILLAGE ROAD / VILLAGE. The boundary description identifies a CART WAY to the north. RERA record RERA filing RERA filing
A supplied location record lists the nearest sampled Outer Ring Road interchange at 112.7 km (approx). This is a measured distance in the supplied location data; no travel time or public-transport information is provided. Location record
9. Developer & development status
The registration certificate names Chintala Dharshan Goud as promoter; the Form B affidavit is by C. DHARSHAN GOUD, who declares title to the land, that it is free from encumbrances, and an undertaking to complete the project on or before 06/12/2022. These are promoter declarations in the filed documents. The supplied data does not establish the promoter’s legal-entity type, company identifier, registered office, official project website or contact details. Corporate record
The RERA header records proposed completion as 31/12/2021; the Form B declaration states a completion undertaking of 06/12/2022. No construction progress report, completion certificate or occupancy certificate is supplied here. RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | FORM ‘C’ certificate for SRI SAI MAHALAKSHMI, registration P03100004294, issued 24/03/2022, under section 5. |
| Principal approval reference | RERA filing identifies DTCP plan approval 1804/2019/H, date 24/10/2019. RERA filing |
| Layout order | NUDA order, Roc. No. 59/NUDA/2019 (date shown as “-03-2021”), describing a draft technical layout pattern for Sy.No. 566/P1, Mentrajpally; includes conditions and land-use figures. |
| Related references in layout order | L.P. No. 28/2019/NUDA; letters 1804/2019/H and 3840/2019/H; D.D. No. 075179 dated 30-12-2020; mortgage deed Doc. No. 2162/2021 dated 02-02-2021. |
| Promoter declaration | Form B affidavit by C. DHARSHAN GOUD, dated 21ª day of February, 2022, including the stated title, encumbrance, fund-account and completion declarations. |
| Completion / occupancy documents | No completion certificate or occupancy certificate is identified in the supplied documents. Document index |
The supplied approval document is described as a draft layout order. The evidence provided does not include a final layout release or a complete approved plot schedule.
1. Project at a glance
Project identity
Registered project name: SRI SAI MAHALAKSHMI
Project type: Plotted development
Phase / registered portion: Not separately identified; the registration certificate covers the project registered under P03100004294.
TG-RERA registration number: P03100004294
Registration validity: Certificate states validity commencing 24/03/2022 and ending 31/12/2021; the supplied record identifies no extension. This is the certificate’s stated registration-validity information, separate from the completion undertaking below.
Registered promoter: Chintala Dharshan Goud (certificate spelling); the Form B declaration names C. DHARSHAN GOUD.
RERA record status: The certificate records registration under section 5; no current status beyond the supplied certificate is established here.
Land and geographic identity
Locality / revenue village: Mentrajpalle; the layout order describes Mentrajpally (G.P) and “Mentrajpally Village Shivar.”
Mandal: DICHPALLY (also rendered “Dichpally” in the layout order).
District / PIN: Nizamabad / 503230
Project survey numbers and subdivisions: 566/AA and 566/E (certificate and RERA filing); the layout order describes land in 566/P1.
Registered site extent: 9914 sq. m total area and 9914.00 sq. m net area, as recorded in the RERA filing.
Layout-order extent: Ac. 2.18 Gts, as stated in the NUDA order.
Boundaries in RERA filing: East: LAND OF BIYYA MANIKYAM; West: LAND OF NAYUDU PRABHAKAR; North: CART WAY; South: LAND OF BIYYA MANIKYAM.
Development identity
Authority / principal approval reference: The RERA filing identifies DTCP and plan approval 1804/2019/H, approved date 24/10/2019. The supplied layout-order document is from Nizamabad Urban Development Authority (NUDA) and describes a draft technical layout pattern.
Other layout-order references: Roc. No. 59/NUDA/2019 (date recorded as “-03-2021”); L.P. No. 28/2019/NUDA; Director of Town and Country Planning letters 1804/2019/H dated 24-10-2019 and 3840/2019/H dated 24-09-2019; D.D. No. 075179 dated 30-12-2020; mortgage deed Doc. No. 2162/2021 dated 02-02-2021.
Approved built-up area: 5989 sq. m is recorded in the RERA filing; no supplied drawing-derived breakdown clarifies its scope.
Buildings / floors: Not disclosed in the supplied evidence for this plotted development.
Parking: The supplied project evidence does not give a parking count, parking levels, or plot-wise parking allocation.
Layout land-use figures in NUDA order: Open space: 7.50%, Ac. 0.184 cents; social infrastructure: 2.5%, Ac. 0.0613cents; roads: 28.57, Ac.0.70 cents; utilities: 1.0%, Ac.0.025 cents; salable area: 15.54%, Ac.0.23 Cents or 1113.2.0 Sq Yards. These are the figures stated in the supplied order.
Offering and status
Unit type / plot count and sizes: Plotted development; plot count, plot-size bands, and RERA-filed saleable-size range are not provided in the supplied data.
Booked / available counts: Not disclosed in the supplied data.
Construction stage: The RERA amenities record gives declared completion percentages for selected infrastructure items; this is not independent site verification. A vendor-supplied description calls the development completed, but it is not the primary RERA record.
Completion dates: RERA header proposed completion: 31/12/2021. Form B declaration undertaking: completion on or before 06/12/2022.
Completion / occupancy certificate: No completion certificate or occupancy certificate is identified in the supplied documents.
2. The project story
SRI SAI MAHALAKSHMI is registered as a plotted development in Mentrajpalle, Dichpally Mandal, Nizamabad District. The RERA record identifies the registered land by Survey Nos. 566/AA and 566/E and records a site area of 9914 sq. m. The supplied NUDA order concerns a proposed layout on Sy.No. 566/P1 and calls the layout pattern a draft technical layout; it lists roads, open space, social infrastructure and utilities as layout components.
The project is presented as a plot layout, not an apartment or villa scheme. The available evidence does not state the number or dimensions of sale plots, booked or available plots, or a plot-wise construction programme. The NUDA order directs the applicant to complete development works within THREE (3) YEARS; the order’s listed layout components and the RERA amenities record’s declared progress percentages are set out below. These percentages are filing data, not independent confirmation of completed works.
3. Master plan, architecture & building design
This is a plotted layout, so apartment tower, floor, flat-per-floor and building-height information is not applicable on the supplied record. The RERA filing records 9914 sq. m total and 9914.00 sq. m net site area, and 5989 sq. m as approved built-up area; the supplied evidence does not explain the built-up-area scope or provide a building-by-building drawing schedule.
The NUDA order describes a draft technical layout pattern, with road widths recorded as 18 mts and above. The order’s stated land-use figures and the identification of Plot Nos 24 & 26 to 30 as mortgage plots in favour of the Vice-Chairman, NUDA-Nizamabad, under mortgage deed Doc. No. 2162/2021, are recorded above. The supplied evidence does not provide a complete plot schedule or detailed layout drawing for analysis.
4. Homes, configurations & floor plans
This project is a plotted development. Plot counts, plot-size bands, booked and available counts, and RERA-filed saleable areas are not present in the supplied data, so a configuration table cannot be populated without inventing values.
Two plan drawings are recorded, but both are scans pending review and none has been software-measured. The supplied floor-plan data therefore does not support measured carpet areas or room-level descriptions.
5. Parking & vehicle circulation
Parking is listed as an amenity by the vendor, but no parking-space count, visitor or accessible provision, parking arrangement, or plot-wise allocation is supplied. The NUDA order records roads of 18 mts and above and refers to demarcating the layout on the ground as per the draft plan; the provided evidence does not describe vehicle entries, exits, ramps, pedestrian separation, or EV charging.
6. Amenities, recreation & open spaces
The NUDA order’s proposed layout infrastructure and land-use components are recorded above. The RERA amenities record separately reports progress percentages for selected items. Neither set of information independently verifies completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Roads | Roads area stated as Ac.0.70 cents; road widths 18 mts and above | NUDA layout order | RERA amenities record does not give a roads percentage; no independent verification supplied. |
| Open space / park | Open space 7.50%, Ac. 0.184 cents; park development also listed | NUDA order; amenities record | Green Strip/TOT LOT/Park: 80% declared. |
| Social infrastructure | 2.5%, Ac. 0.0613cents | NUDA layout order | No completion status supplied. |
| Utilities land | 1.0%, Ac.0.025 cents | NUDA layout order | No completion status supplied. |
| Avenue plantation | Listed as a layout development item | NUDA layout order | No progress percentage supplied. |
| Internal roads and footpaths | Listed in amenities record | Amenities record | 90% declared. |
| Street lighting | Listed in amenities record | Amenities record | 75% declared. |
7. Utilities, building services & safety
The NUDA order lists a common septic tank /STP, internal water-supply pipelines, an overhead tank, a transformer, rainwater-harvesting pits, storm-water drains and underground drainage lines. These are listed as layout development items; the supplied record does not provide capacities, technical specifications, commissioning evidence or independent verification.
The RERA amenities record reports declared progress of 90% for water supply, 85% for sewerage (chambers, lines, septic tank, STP), and 80% for water conservation/rainwater harvesting. It records 0% for storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, fire protection and fire-safety requirements, and electrical meter room/sub-station/receiving station. These are the supplied declared figures, not a finding that a facility is absent or a certification of statutory compliance.
8. Location, access & connectivity
The registered location is Mentrajpalle, DICHPALLY Mandal, Nizamabad District, Telangana, PIN 503230; the RERA filing gives the street/locality as VILLAGE ROAD / VILLAGE. The boundary description identifies a CART WAY to the north.
A supplied location record lists the nearest sampled Outer Ring Road interchange at 112.7 km (approx). This is a measured distance in the supplied location data; no travel time or public-transport information is provided.
9. Developer & development status
The registration certificate names Chintala Dharshan Goud as promoter; the Form B affidavit is by C. DHARSHAN GOUD, who declares title to the land, that it is free from encumbrances, and an undertaking to complete the project on or before 06/12/2022. These are promoter declarations in the filed documents. The supplied data does not establish the promoter’s legal-entity type, company identifier, registered office, official project website or contact details.
The RERA header records proposed completion as 31/12/2021; the Form B declaration states a completion undertaking of 06/12/2022. No construction progress report, completion certificate or occupancy certificate is supplied here.
10. Approvals, official records & documents
TG-RERA registration: FORM ‘C’ certificate for SRI SAI MAHALAKSHMI, registration P03100004294, issued 24/03/2022, under section 5.
Principal approval reference: RERA filing identifies DTCP plan approval 1804/2019/H, date 24/10/2019.
Layout order: NUDA order, Roc. No. 59/NUDA/2019 (date shown as “-03-2021”), describing a draft technical layout pattern for Sy.No. 566/P1, Mentrajpally; includes conditions and land-use figures.
Related references in layout order: L.P. No. 28/2019/NUDA; letters 1804/2019/H and 3840/2019/H; D.D. No. 075179 dated 30-12-2020; mortgage deed Doc. No. 2162/2021 dated 02-02-2021.
Promoter declaration: Form B affidavit by C. DHARSHAN GOUD, dated 21ª day of February, 2022, including the stated title, encumbrance, fund-account and completion declarations.
Completion / occupancy documents: No completion certificate or occupancy certificate is identified in the supplied documents.
The supplied approval document is described as a draft layout order. The evidence provided does not include a final layout release or a complete approved plot schedule.
Frequently asked questions
Is SRI SAI MAHALAKSHMI registered with Telangana RERA?
Yes. SRI SAI MAHALAKSHMI is registered with the Telangana Real Estate Regulatory Authority as P03100004294; the registration status is New Project.
Who is the developer of SRI SAI MAHALAKSHMI?
The promoter named in the RERA registration is CHINTALA.
Where is SRI SAI MAHALAKSHMI located?
SRI SAI MAHALAKSHMI is in VILLAGE, Mentrajpalle, DICHPALLY, Nizamabad, Telangana (503230).
When will SRI SAI MAHALAKSHMI be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2021. This is the promoter's declaration, not a guarantee.
More projects in Dichpally

