DURGA is a residential apartment project in Begumpet, Hyderabad, Hyderabad district; the mandal is not disclosed. The registered promoter is SRI DURGA DEVELOPERS. The project has a total site area of 1,084.78 sq m and one proposed residential building with a cellar, stilt and 5 residential upper floors, comprising 10 4BHK units. It is registered under TG-RERA number P02500000381, with a proposed completion date of 10-04-2024.

More from Sri Durga Developers · 4 projects →

01What we found

Period endedTG-RERA registration ran to 10 Apr 2024 - check its extension on TG-RERA
23documents on file - each fact links to its page
5court cases on this project's land (survey 30, 40, Begumpet)
9items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemTG-RERA record
Registered project nameDURGA
Project typeResidential apartment project
Phase / registered portionNot separately identified in the supplied record
TG-RERA registrationP02500000381
Registration validity2 March 2019 to 10 April 2024, unless extended by the Authority; the supplied certificate records no extension
Registered promoterSRI DURGA DEVELOPERS
RERA statusThe registration certificate’s stated validity ended on 10 April 2024. Current registration status is not established by the supplied certificate.
Registered project status“New Project” in the RERA project record

RERA record RERA filing Approvals record

Land and geographic identity

ItemRERA-filed / document record
LocalityBegumpet; the building permit describes Cheekoti Garden, Begumpet
Revenue villageBegumpet
MandalNot disclosed
District / PINHyderabad / 500016
Survey numbers30, 39 & 40; no subdivision numbers are specified in the supplied project identity record
Plot / premises references1-10-68/B & 1-10-68/C, Plot Nos. 14 & 15
Site extentTotal site area 1,084.78 sq m; road-affected area 59.52 sq m; net area 1,025.26 sq m
BoundariesNorth: Plot Nos. 13 and 26; South: road; East: Plot No. 16; West: road

RERA filing RERA filing Land records

Development identity

ItemSanctioned / filed record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Building permitPermit No. 1/18B/06189/2018, dated 10 April 2018; file No. 1/18B/15015/2017
Approved residential area2,642.85 sq m
Building countOne proposed residential building, identified in the permit as “Building - A (PROPOSED)”
Sanctioned configurationCellar + stilt + 5 residential upper floors; stated height 14.84 m
Parking levelsCellar (614.28 sq m) and stilt (691.20 sq m), both identified in the permit for parking
Tot-lot85.97 sq m
Approved versus RERA-declared unitsThe supplied extract gives no numerical sanctioned unit count. The RERA filing records 10 units.

Approvals record RERA filing RERA unit table

Offering and status

ItemRERA-filed record
Configuration4BHK
Units / booking10 units; 0 booked and 10 available in the portal data supplied. No as-of date is stated, so counts are indicative.
RERA saleable area297.29 sq m per unit
Construction stageNot established by the supplied evidence; no independently verified site-progress record is provided.
Completion datePromoter’s Form-B declaration undertakes completion by 10-04-2024. No revised completion date is supplied.
Occupancy certificateNo occupancy certificate is included in the supplied records; its issuance or current status is not established.

RERA unit table RERA unit table Document index

2. The project story

DURGA is registered with TG-RERA as a residential apartment project for the Begumpet site identified by Survey Nos. 30, 39 & 40, at the premises described as 1-10-68/B & 1-10-68/C, Plot Nos. 14 & 15. The GHMC building-permit extract describes one proposed building, Building A, with a cellar, stilt and five upper floors, and a residential area of 2,642.85 sq m. RERA record RERA filing

The RERA unit record describes ten 4BHK units, with 0 booked and 10 available in the supplied portal data; the portal data has no as-of date. The promoter’s Form-B affidavit, dated 28 November 2018, declared a completion undertaking of 10 April 2024. The evidence supplied here does not establish subsequent construction progress, completion, or issuance of an occupancy certificate. The GHMC permit states that an occupancy certificate is compulsory before occupation. RERA unit table RERA unit table

3. Master plan, architecture & building design

The GHMC building-permit extract records the building height as 14.84 m, residential area as 2,642.85 sq m, site area as 1,084.78 sq m, net area as 1,025.26 sq m, and road-affected area as 59.52 sq m. These are permit-extract figures; the supplied materials do not provide a separately labelled FSI-counted area or gross built-up area. RERA filing

The permit lists cellar parking of 614.28 sq m, stilt parking of 691.20 sq m, and an 85.97 sq m tot-lot. It also refers to five rainwater-harvesting structures and 50 trees. The supplied material does not establish the building footprint, number of flats per floor, lifts or stair arrangements, entrances, internal circulation, or detailed common-area distribution.

The supplied RERA unit schedule records ten 4BHK units. No approved drawing extraction establishing the apartment-by-apartment arrangement is available in the evidence presented here. RERA unit table RERA unit table

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
4BHK10010297.29 sq mNot available in the supplied measurementsNot supplied

RERA unit table RERA unit table

The supplied drawing-measurement data covers 2BHK and 3BHK layouts, not the RERA-filed 4BHK configuration; it therefore does not provide a measured carpet area for the units reported in this table. In general, saleable area and carpet area are distinct measures; no project-specific loading figure is supplied. RERA unit details Floor plans

5. Parking & vehicle circulation

The GHMC permit identifies a cellar parking level of 614.28 sq m and a stilt parking level of 691.20 sq m, and states that both are to be used exclusively for vehicle parking. It does not provide the number of parking spaces, their allocation by unit, visitor or accessible parking counts, or information about ramps, vehicle entries, or internal driveways. The supplied RERA unit record marks the units as mortgaged; it does not establish any buyer-specific parking allocation. RERA unit table RERA unit table

6. Amenities, recreation & open spaces

The permit extract identifies a tot-lot and several site features. The RERA amenity register records specified items as “YES,” but lists 0% progress for each item; that is a filed status, not independent confirmation of delivery.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green strip85.97 sq m; permit requires fencing and maintenance as greeneryGHMC building permitPermitted / required; completion not independently verified
Aggregate recreational open spaceSize not statedRERA amenity register“YES”; 0% recorded
Internal roads and footpathsSize not statedRERA amenity register“YES”; 0% recorded
Community buildingsNo details suppliedRERA amenity registerNo availability value stated; 0% recorded

RERA amenities

The supplied records do not establish clubhouse or indoor facilities, sports facilities beyond the tot-lot, or additional community amenities. RERA amenities

7. Utilities, building services & safety

The RERA amenity register marks water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, rainwater harvesting, fire protection and safety, and an electrical meter room/substation/receiving station as “YES”; each entry shows 0% progress. The register does not provide system capacities or establish completion. RERA amenities

GHMC’s permit requires a rainwater-harvesting percolation pit, space for a transformer, and a garbage house within the premises. It also refers to an ETP, fire-safety requirements, lifts, electrical installations, and supervision by qualified technical personnel. These are permit conditions or listed requirements, not evidence that the works are complete or that statutory compliance has been independently verified. No water source or storage capacity, treatment capacity, lift count or capacity, backup power details, CCTV provision, accessibility arrangement, or waste-segregation system is established in the supplied RERA project evidence. RERA amenities

8. Location, access & connectivity

The registered project location is Begumpet, Hyderabad, PIN 500016. The permit’s site boundaries identify roads to the south and west. The supplied evidence does not establish a project-specific approach-road description beyond those boundaries, or public-transport connections and measured distances suitable for this project profile. RERA record RERA filing RERA filing

9. Developer & development status

The registered legal promoter is SRI DURGA DEVELOPERS, identified in the RERA record as a partnership. Its supplied address is Apurupa, Motilal Nehru Nagar, Chikoti Gardens, Begumpet, Hyderabad, 500016. Nikhil Paleja is listed as an authorized signatory; the supplied record does not establish a separate official project contact or promoter website. Corporate record Parties record RERA filing

The promoter’s Form-B affidavit dated 28 November 2018 declares that the project would be completed by 10 April 2024 and includes undertakings on project funds, audits and pending approvals. This is a promoter declaration, not independent confirmation of construction progress or completion. No phase-wise status or revised completion timetable is supplied. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate (Form C)
Identifier / dateP02500000381; issued 2 March 2019; stated validity through 10 April 2024 unless extended
Scope and evidenceProject DURGA; registered promoter SRI DURGA DEVELOPERS; Survey Nos. 30, 39 & 40. The supplied certificate records no extension.
GHMC building permit order
Identifier / datePermit 1/18B/06189/2018; 10 April 2018; file 1/18B/15015/2017
Scope and evidenceBuilding permission extract for the Begumpet site; identifies Building A (proposed) and its sanctioned configuration and conditions.
Form-B promoter declaration
Identifier / date28 November 2018
Scope and evidencePromoter declaration including the 10 April 2024 completion undertaking.
Occupancy certificate
Identifier / dateNot supplied
Scope and evidenceThe GHMC permit states that an occupancy certificate is compulsory before occupation; issuance is not established by the documents provided.
Approved layout plan
Identifier / dateNot established in the supplied record
Scope and evidenceNo layout approval number is disclosed in the project identity fields. RERA filing

The GHMC permit extract states that the building plan is valid for three years from the issue date if work commences within one year, and requires a completion notice and occupancy certificate before occupation. The supplied evidence does not establish whether those requirements were subsequently met.

Other registrations of Durga

Frequently asked questions

Is DURGA registered with Telangana RERA?

Yes. DURGA is registered with the Telangana Real Estate Regulatory Authority as P02500000381; the registration status is New Project.

Who is the developer of DURGA?

The promoter named in the RERA registration is SRI DURGA DEVELOPERS.

Where is DURGA located?

DURGA is in BEGUMPET, Hyderabad, Telangana (500016).

When will DURGA be completed?

The promoter's proposed date of completion filed with RERA is 10/04/2024. This is the promoter's declaration, not a guarantee.