Mahalaxmi Sri Nilayam
MAHALAXMI CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200002221
Mahalaxmi Sri Nilayam is a residential apartment project in Uppal, Uppal / Medchal-Malkajgiri, on 3,345.90 sq. m of land. The registered promoter is Mahalaxmi Constructions, partnership. The registered portion has one building with 1 cellar + 1 stilt + 8 upper floors and 15 3BHK apartments, each with a RERA-filed saleable area of 170.0 sq. m. It is registered under TG-RERA number P02200002221, and the promoter’s Form B dated 23 August 2023 states completion by 24-03-2026.
More from Mahalaxmi Constructions · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | Mahalaxmi Sri Nilayam |
| Project type / use | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified in the available registration record; registered land is described by the survey numbers below |
| TG-RERA registration | P02200002221 |
| Registration validity | 30/10/2020 to 23/11/2025; the certificate says five years and is not marked as extended in the supplied record. This is the registration-validity period, not the completion deadline or OC status. Approvals record |
| Registered promoter | Mahalaxmi Constructions, partnership Parties record Corporate record |
| RERA status in supplied record | Registration is recorded as valid through 23/11/2025; no extension is recorded. The supplied portal capture is dated 10/09/2026. Approvals record |
Land and geographic identity
| Field | Project record |
|---|---|
| Registered locality / village | Uppal; the RERA certificate records Uppal as locality and mandal. |
| Revenue village | Uppal Bhagat Village (also written “Uppal Bhagath” in project-filed title/approval material). |
| Mandal / district / PIN | Uppal / Medchal-Malkajgiri / 500039 |
| Project survey numbers and subdivisions | 1-40, 282 to 368, 369/P, 370 to 373, 374/P, 375 to 387, 395 to 401, 454, 456 to 459, 505/P, 510 to 564 |
| Registered site extent | 3,345.90 sq. m in the RERA-filed HMDA technical approval; the project record also gives total/net area as 3,345.90 sq. m. RERA filing |
| Boundaries | East: Road width 18 Meters; West: Road width 24 Meters; North: Plot 907 91 4; South: Plot 909 912. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Technical planning authority / principal approval | HMDA technical approval 021026/GHT/R1/U6/HMDA/28022019, dated 23/11/2019. It describes Plot Nos. 908 and 913 at Uppal Bhagat Village and directs that building plans be sanctioned by the Executive Authority in conformity with HMDA’s technical approval. |
| Local building sanction | GHMC Building Permit 0526/GHMC/SEC/2023-BP, dated 24 March 2023. The filed permit describes 1 cellar + 1 stilt + 8 upper floors. |
| Approved built-up area | 10,333.49 sq. m is stated in the HMDA approval’s “Built up Area” parameter. The same document separately states 11,741.66 sq. m as “Total Built up Area”; these labels are retained as recorded and are not treated as interchangeable. |
| Building / block count | One building/unit is recorded in the project fields. RERA filing |
| RERA-filed apartment configuration | 3BHK; 15 units in the supplied unit record. RERA unit table RERA unit details |
| GHMC permit particulars | The GHMC permit on file describes a residential building on 748.01 sq. m at East Marredpally 18, with 1 stilt + 5 upper floors; its scope is identified in the permit as Survey No. 74/10. |
| Building configuration for the registered Uppal site | The HMDA technical approval describes 1 cellar + 1 stilt + 8 upper floors on 3,345.90 sq. m. |
Offering and status
| Field | Project record |
|---|---|
| Unit type | 3BHK apartments RERA unit table |
| RERA-filed saleable area | 170.0 sq. m RERA unit table |
| Booked / available | 7 booked / 8 available, out of 15 recorded units. The portal-derived counts have no as-of date in the supplied unit record and should be treated as indicative. RERA unit table |
| Promoter-declared completion undertaking | Form B dated 23 August 2023 states completion by 24-03-2026. This is a promoter declaration, not a verified completion finding. |
| Earlier RERA-filed completion undertaking | The registration-era Form B records 23-05-2022. |
| Occupancy certificate | The supplied GHMC OC records the building at Survey No. 74/10, Marredpally, as fit for occupation, with completion dated 06/06/2025. Its recorded scope is that building, not the registered Uppal survey land listed above. |
2. The project story
Mahalaxmi Sri Nilayam is registered as a residential apartment project under TG-RERA number P02200002221, with its RERA-filed location identified as Uppal Bhagat Village, Uppal Mandal, Medchal-Malkajgiri District. The registered land record describes the full survey-number range and subdivisions in the identity table above, and the HMDA technical approval identifies Plot Nos. 908 and 913 on 3,345.90 sq. m.
The supplied RERA unit record describes 15 three-bedroom apartments, with 7 booked and 8 available in the last-read portal data; no as-of date is supplied for those counts. The project-filed HMDA technical approval describes one proposed residential building with a cellar, stilt and eight upper floors. A GHMC building permit and GHMC occupancy certificate are also present in the project documents, but those records identify a separate Survey No. 74/10 site in East Marredpally; they do not establish occupancy certification for the Uppal-registered land. RERA unit table
The supplied documents do not provide independently verified current construction progress for the registered Uppal project. The promoter’s Form B completion date is a self-declared undertaking, not independent evidence of progress or completion.
3. Master plan, architecture & building design
The RERA-filed HMDA technical approval describes a proposed residential building on a site extent of 3,345.90 sq. m, with 1 cellar + 1 stilt + 8 upper floors. It records a building height of 23.96 and gives a “Built up Area” of 10,333.49 and a separate “Total Built up Area (In Sq.mts)” of 11,741.66. These are the approval’s separately labelled figures; the supplied material does not explain their calculation or permit treating them as equivalent.
The GHMC permit separately describes a residential building at East Marredpally 18 with 1 stilt + 5 upper floors on 748.01 sq. m. This is a different identified site and approval scope from the registered Uppal land. The supplied records do not establish that the GHMC building is part of the registered Uppal phase.
The available approved floor-plan drawing record is limited: one drawing was measured, one record has no flats, and no layout sheets are recorded. The supplied material does not establish a complete architectural arrangement for the registered Uppal site, including footprint, flat distribution per floor, lift/stair details, internal circulation, landscaping, or residential/common-area breakdown. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 15 | 7 | 8 | 170.0 sq. m | Software-measured: median 94.7 sq. m; range 86.7–104.1 sq. m | Software-measured: 44% |
The unit counts and saleable area are RERA-filed values; the booked/available counts are portal-derived and lack an as-of date. Carpet-area and loading figures are software measurements from the available drawing geometry, not RERA disclosures, and the drawing measurements are flagged for review. RERA unit table RERA unit details Floor plans
The measured sample drawing labels living, dining, kitchen, three bedrooms, three toilets, a balcony and a utility. For the illustrated flat, the drawing records a 1.20 M. WIDE BALC and a utility; the balcony and utility are excluded from the software-measured carpet calculation. These room details are drawing-derived and should be checked against the source drawing. RERA unit details
Carpet area is not the same as saleable area: the supplied drawing-measurement record notes that saleable area also counts the home’s share of common areas. No separately verified RERA-filed carpet-area figure is supplied. Floor plans
5. Parking & vehicle circulation
The RERA-filed HMDA technical approval describes a cellar and stilt approved for parking and requires those areas to be used exclusively for vehicle parking, without partition walls or rolling shutters. It records Total Parking Area 539; the supplied extraction does not state a parking-space count or specify the unit for that figure.
The GHMC permit for the separate East Marredpally site records Total Parking Area 539 and requires the cellar and stilt approved for parking to be used exclusively for vehicle parking. The available records do not establish resident/visitor/accessible-space counts, two-wheeler provision, EV charging, driveway or ramp arrangements, or legally documented parking allocation to individual units.
6. Amenities, recreation & open spaces
| Description / size | GHMC permit refers to a tot-lot and periphery greenery; its permit schedule lists “Tot Lot NA.” |
|---|---|
| Declared progress / verified status | Permit condition / schedule; no independent completion evidence supplied |
| Description / size | HMDA approval lists rainwater-harvesting structures; GHMC permit specifies 10 rainwater-harvesting pits and requires a percolation pit. |
|---|---|
| Declared progress / verified status | Approval/permit requirement; completion not independently verified |
| Description / size | HMDA and GHMC records require space for a transformer. |
|---|---|
| Declared progress / verified status | Approval/permit requirement; completion not independently verified |
| Description / size | HMDA and GHMC records specify a garbage house within the premises. |
|---|---|
| Declared progress / verified status | Approval/permit requirement; completion not independently verified |
| Description / size | These are listed in promoter/third-party vendor material, not established by the supplied RERA-filed approval or amenity schedule. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Promoter-marketed claims; delivery is not verified |
The RERA amenity schedule marks water supply, sewerage, storm-water drains, green strip/tot-lot/park, sewage treatment/disposal, solid-waste management, rainwater harvesting, fire protection and electrical meter/sub-station/receiving station as “YES” at 100%. Those entries are project-record declarations, not independent verification of completion. The same schedule records 0% for internal roads and footpaths, street lighting, community buildings, energy management and aggregate recreational open space. RERA amenities
7. Utilities, building services & safety
The RERA amenity schedule records water supply, sewerage, storm-water drains, treatment and disposal of sewage/sullage water, solid-waste management, water conservation/rainwater harvesting, fire protection, and electrical meter-room/sub-station/receiving-station provision as “YES” at 100%. These are declared schedule entries; the supplied evidence does not independently verify current operational status or provide capacities, treatment/reuse details, backup-power particulars, or service specifications. RERA amenities
The GHMC permit requires a rainwater-harvesting structure, transformer space and garbage house. It also requires the sanctioned plan to be followed, a commencement notice before construction, a completion notice and occupancy certificate after completion, and an occupancy certificate before occupation. These are permit conditions; they are not, by themselves, proof that the requirements have been met for the registered Uppal site.
The HMDA approval requires the approved cellar and stilt to be used exclusively for parking and states that the applicant should approach HMDA for an occupancy certificate after completion. The supplied evidence does not establish lift provision, lift capacity, fire-system specifications, escape-stair arrangement, accessibility features, CCTV, access-control systems, or independent fire-clearance status for the registered Uppal project.
8. Location, access & connectivity
The registered RERA location is Uppal, Uppal Mandal, Medchal-Malkajgiri District, PIN 500039; the filed land and HMDA approval identify Uppal Bhagat Village and the survey-number range listed in the identity table.
The project fields record roads on the east and west boundaries, with stated widths of 18 Meters and 24 Meters respectively. The HMDA approval identifies Plot Nos. 908 and 913. No project approach-road plan, public-transport information, or verified nearby-landmark distances are supplied for this registered location. RERA filing
The supplied location record contains a coordinate labelled “cadastral parcel centroid” at 17.41528, 78.35459, and a listed distance of 1.2 km to Financial District (Nanakramguda). The supplied evidence does not establish this as a verified route distance from the registered site. Location record
9. Developer & development status
The registered promoter is Mahalaxmi Constructions, recorded as a partnership. The project record names PABBA SIDESHWAR as an authorized signatory and SUNITHA PABBA as a partner. The promoter’s GSTIN is 36ABBFM5790M2ZP; a masked identifier appears as xxxxxx790M. The supplied record does not provide a fully verified registered-office address or project contact details. Parties record Corporate record RERA filing
The project registration certificate records validity through 23/11/2025, without an extension in the supplied record. A Form B dated 23 August 2023 states a promoter undertaking to complete by 24-03-2026; the registration-era Form B states 23-05-2022. These are promoter-filed completion declarations, not independent evidence of completed construction or a revised registration validity.
No independently verified construction-progress measurement for the registered Uppal project is supplied. The supplied GHMC occupancy documents relate to a building identified as Survey No. 74/10 in Marredpally and are not evidence of an OC for the registered Uppal survey land.
10. Approvals, official records & documents
| Identifier / date | P02200002221, issued 30/10/2020; validity to 23/11/2025 |
|---|---|
| What the supplied record establishes | Registration of Mahalaxmi Sri Nilayam; certificate includes a separate-account condition. |
| Identifier / date | 021026/GHT/R1/U6/HMDA/28022019, 23/11/2019 |
|---|---|
| What the supplied record establishes | Technical approval for a proposed residential building at Plot Nos. 908 and 913, Uppal Bhagat Village; directs the applicant to obtain local Executive Authority sanction. |
| Identifier / date | Registered mortgage deed 13336/2019, dated 04.09.2019 |
|---|---|
| What the supplied record establishes | Approval extract records a mortgage in favour of MC, HMDA, over the stated area. |
| Identifier / date | 0526/GHMC/SEC/2023-BP, 24 March 2023 |
|---|---|
| What the supplied record establishes | Permit record for a residential building at East Marredpally 18, Survey No. 74/10, with 1 stilt and 5 upper floors. |
| Identifier / date | 002347/GHMC/01275/SWOC/SEC2/2025, completion date 06/06/2025 |
|---|---|
| What the supplied record establishes | Certificate says the inspected Survey No. 74/10 Marredpally building is fit for occupation; records built-up area 1,910.6 sq. m and no deviated built-up area. |
| Identifier / date | Form B dated 23 August 2023; registration-era Form B |
|---|---|
| What the supplied record establishes | Promoter-filed title/encumbrance statements and completion undertakings; these are declarations, not independent title verification. |
| Identifier / date | Document 355928 |
|---|---|
| What the supplied record establishes | Drawing-derived measurements used for the software-measured unit figures; not a RERA-filed carpet-area disclosure. |
| Identifier / date | Partnership deeds 361109 and 130486 |
|---|---|
| What the supplied record establishes | Partnership/entity documents; the supplied extracts state that they do not establish land title. |
The supplied evidence also includes title opinions and encumbrance material, but this Overview does not determine title or current encumbrance status. The approval and certificate entries above are limited to their identified document scopes; the supplied records do not establish that the Marredpally GHMC permit and OC are approvals or completion certification for the registered Uppal land.
1. Project at a glance
Project identity
Registered project name: Mahalaxmi Sri Nilayam
Project type / use: Residential apartment project
Phase / registered portion: Phase not separately identified in the available registration record; registered land is described by the survey numbers below
TG-RERA registration: P02200002221
Registration validity: 30/10/2020 to 23/11/2025; the certificate says five years and is not marked as extended in the supplied record. This is the registration-validity period, not the completion deadline or OC status.
Registered promoter: Mahalaxmi Constructions, partnership
RERA status in supplied record: Registration is recorded as valid through 23/11/2025; no extension is recorded. The supplied portal capture is dated 10/09/2026.
Land and geographic identity
Registered locality / village: Uppal; the RERA certificate records Uppal as locality and mandal.
Revenue village: Uppal Bhagat Village (also written “Uppal Bhagath” in project-filed title/approval material).
Mandal / district / PIN: Uppal / Medchal-Malkajgiri / 500039
Project survey numbers and subdivisions: 1-40, 282 to 368, 369/P, 370 to 373, 374/P, 375 to 387, 395 to 401, 454, 456 to 459, 505/P, 510 to 564
Registered site extent: 3,345.90 sq. m in the RERA-filed HMDA technical approval; the project record also gives total/net area as 3,345.90 sq. m.
Boundaries: East: Road width 18 Meters; West: Road width 24 Meters; North: Plot 907 91 4; South: Plot 909 912.
Development identity
Technical planning authority / principal approval: HMDA technical approval 021026/GHT/R1/U6/HMDA/28022019, dated 23/11/2019. It describes Plot Nos. 908 and 913 at Uppal Bhagat Village and directs that building plans be sanctioned by the Executive Authority in conformity with HMDA’s technical approval.
Local building sanction: GHMC Building Permit 0526/GHMC/SEC/2023-BP, dated 24 March 2023. The filed permit describes 1 cellar + 1 stilt + 8 upper floors.
Approved built-up area: 10,333.49 sq. m is stated in the HMDA approval’s “Built up Area” parameter. The same document separately states 11,741.66 sq. m as “Total Built up Area”; these labels are retained as recorded and are not treated as interchangeable.
Building / block count: One building/unit is recorded in the project fields.
RERA-filed apartment configuration: 3BHK; 15 units in the supplied unit record.
GHMC permit particulars: The GHMC permit on file describes a residential building on 748.01 sq. m at East Marredpally 18, with 1 stilt + 5 upper floors; its scope is identified in the permit as Survey No. 74/10.
Building configuration for the registered Uppal site: The HMDA technical approval describes 1 cellar + 1 stilt + 8 upper floors on 3,345.90 sq. m.
Offering and status
Unit type: 3BHK apartments
RERA-filed saleable area: 170.0 sq. m
Booked / available: 7 booked / 8 available, out of 15 recorded units. The portal-derived counts have no as-of date in the supplied unit record and should be treated as indicative.
Promoter-declared completion undertaking: Form B dated 23 August 2023 states completion by 24-03-2026. This is a promoter declaration, not a verified completion finding.
Earlier RERA-filed completion undertaking: The registration-era Form B records 23-05-2022.
Occupancy certificate: The supplied GHMC OC records the building at Survey No. 74/10, Marredpally, as fit for occupation, with completion dated 06/06/2025. Its recorded scope is that building, not the registered Uppal survey land listed above.
2. The project story
Mahalaxmi Sri Nilayam is registered as a residential apartment project under TG-RERA number P02200002221, with its RERA-filed location identified as Uppal Bhagat Village, Uppal Mandal, Medchal-Malkajgiri District. The registered land record describes the full survey-number range and subdivisions in the identity table above, and the HMDA technical approval identifies Plot Nos. 908 and 913 on 3,345.90 sq. m.
The supplied RERA unit record describes 15 three-bedroom apartments, with 7 booked and 8 available in the last-read portal data; no as-of date is supplied for those counts. The project-filed HMDA technical approval describes one proposed residential building with a cellar, stilt and eight upper floors. A GHMC building permit and GHMC occupancy certificate are also present in the project documents, but those records identify a separate Survey No. 74/10 site in East Marredpally; they do not establish occupancy certification for the Uppal-registered land.
The supplied documents do not provide independently verified current construction progress for the registered Uppal project. The promoter’s Form B completion date is a self-declared undertaking, not independent evidence of progress or completion.
3. Master plan, architecture & building design
The RERA-filed HMDA technical approval describes a proposed residential building on a site extent of 3,345.90 sq. m, with 1 cellar + 1 stilt + 8 upper floors. It records a building height of 23.96 and gives a “Built up Area” of 10,333.49 and a separate “Total Built up Area (In Sq.mts)” of 11,741.66. These are the approval’s separately labelled figures; the supplied material does not explain their calculation or permit treating them as equivalent.
The GHMC permit separately describes a residential building at East Marredpally 18 with 1 stilt + 5 upper floors on 748.01 sq. m. This is a different identified site and approval scope from the registered Uppal land. The supplied records do not establish that the GHMC building is part of the registered Uppal phase.
The available approved floor-plan drawing record is limited: one drawing was measured, one record has no flats, and no layout sheets are recorded. The supplied material does not establish a complete architectural arrangement for the registered Uppal site, including footprint, flat distribution per floor, lift/stair details, internal circulation, landscaping, or residential/common-area breakdown.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 15 | 7 | 8 | 170.0 sq. m | Software-measured: median 94.7 sq. m; range 86.7–104.1 sq. m | Software-measured: 44% |
The unit counts and saleable area are RERA-filed values; the booked/available counts are portal-derived and lack an as-of date. Carpet-area and loading figures are software measurements from the available drawing geometry, not RERA disclosures, and the drawing measurements are flagged for review.
The measured sample drawing labels living, dining, kitchen, three bedrooms, three toilets, a balcony and a utility. For the illustrated flat, the drawing records a 1.20 M. WIDE BALC and a utility; the balcony and utility are excluded from the software-measured carpet calculation. These room details are drawing-derived and should be checked against the source drawing.
Carpet area is not the same as saleable area: the supplied drawing-measurement record notes that saleable area also counts the home’s share of common areas. No separately verified RERA-filed carpet-area figure is supplied.
5. Parking & vehicle circulation
The RERA-filed HMDA technical approval describes a cellar and stilt approved for parking and requires those areas to be used exclusively for vehicle parking, without partition walls or rolling shutters. It records Total Parking Area 539; the supplied extraction does not state a parking-space count or specify the unit for that figure.
The GHMC permit for the separate East Marredpally site records Total Parking Area 539 and requires the cellar and stilt approved for parking to be used exclusively for vehicle parking. The available records do not establish resident/visitor/accessible-space counts, two-wheeler provision, EV charging, driveway or ramp arrangements, or legally documented parking allocation to individual units.
6. Amenities, recreation & open spaces
| Description / size | GHMC permit refers to a tot-lot and periphery greenery; its permit schedule lists “Tot Lot NA.” |
|---|---|
| Declared progress / verified status | Permit condition / schedule; no independent completion evidence supplied |
| Description / size | HMDA approval lists rainwater-harvesting structures; GHMC permit specifies 10 rainwater-harvesting pits and requires a percolation pit. |
|---|---|
| Declared progress / verified status | Approval/permit requirement; completion not independently verified |
| Description / size | HMDA and GHMC records require space for a transformer. |
|---|---|
| Declared progress / verified status | Approval/permit requirement; completion not independently verified |
| Description / size | HMDA and GHMC records specify a garbage house within the premises. |
|---|---|
| Declared progress / verified status | Approval/permit requirement; completion not independently verified |
| Description / size | These are listed in promoter/third-party vendor material, not established by the supplied RERA-filed approval or amenity schedule. |
|---|---|
| Declared progress / verified status | Promoter-marketed claims; delivery is not verified |
The RERA amenity schedule marks water supply, sewerage, storm-water drains, green strip/tot-lot/park, sewage treatment/disposal, solid-waste management, rainwater harvesting, fire protection and electrical meter/sub-station/receiving station as “YES” at 100%. Those entries are project-record declarations, not independent verification of completion. The same schedule records 0% for internal roads and footpaths, street lighting, community buildings, energy management and aggregate recreational open space.
7. Utilities, building services & safety
The RERA amenity schedule records water supply, sewerage, storm-water drains, treatment and disposal of sewage/sullage water, solid-waste management, water conservation/rainwater harvesting, fire protection, and electrical meter-room/sub-station/receiving-station provision as “YES” at 100%. These are declared schedule entries; the supplied evidence does not independently verify current operational status or provide capacities, treatment/reuse details, backup-power particulars, or service specifications.
The GHMC permit requires a rainwater-harvesting structure, transformer space and garbage house. It also requires the sanctioned plan to be followed, a commencement notice before construction, a completion notice and occupancy certificate after completion, and an occupancy certificate before occupation. These are permit conditions; they are not, by themselves, proof that the requirements have been met for the registered Uppal site.
The HMDA approval requires the approved cellar and stilt to be used exclusively for parking and states that the applicant should approach HMDA for an occupancy certificate after completion. The supplied evidence does not establish lift provision, lift capacity, fire-system specifications, escape-stair arrangement, accessibility features, CCTV, access-control systems, or independent fire-clearance status for the registered Uppal project.
8. Location, access & connectivity
The registered RERA location is Uppal, Uppal Mandal, Medchal-Malkajgiri District, PIN 500039; the filed land and HMDA approval identify Uppal Bhagat Village and the survey-number range listed in the identity table.
The project fields record roads on the east and west boundaries, with stated widths of 18 Meters and 24 Meters respectively. The HMDA approval identifies Plot Nos. 908 and 913. No project approach-road plan, public-transport information, or verified nearby-landmark distances are supplied for this registered location.
The supplied location record contains a coordinate labelled “cadastral parcel centroid” at 17.41528, 78.35459, and a listed distance of 1.2 km to Financial District (Nanakramguda). The supplied evidence does not establish this as a verified route distance from the registered site.
9. Developer & development status
The registered promoter is Mahalaxmi Constructions, recorded as a partnership. The project record names PABBA SIDESHWAR as an authorized signatory and SUNITHA PABBA as a partner. The promoter’s GSTIN is 36ABBFM5790M2ZP; a masked identifier appears as xxxxxx790M. The supplied record does not provide a fully verified registered-office address or project contact details.
The project registration certificate records validity through 23/11/2025, without an extension in the supplied record. A Form B dated 23 August 2023 states a promoter undertaking to complete by 24-03-2026; the registration-era Form B states 23-05-2022. These are promoter-filed completion declarations, not independent evidence of completed construction or a revised registration validity.
No independently verified construction-progress measurement for the registered Uppal project is supplied. The supplied GHMC occupancy documents relate to a building identified as Survey No. 74/10 in Marredpally and are not evidence of an OC for the registered Uppal survey land.
10. Approvals, official records & documents
| Identifier / date | P02200002221, issued 30/10/2020; validity to 23/11/2025 |
|---|---|
| What the supplied record establishes | Registration of Mahalaxmi Sri Nilayam; certificate includes a separate-account condition. |
| Identifier / date | 021026/GHT/R1/U6/HMDA/28022019, 23/11/2019 |
|---|---|
| What the supplied record establishes | Technical approval for a proposed residential building at Plot Nos. 908 and 913, Uppal Bhagat Village; directs the applicant to obtain local Executive Authority sanction. |
| Identifier / date | Registered mortgage deed 13336/2019, dated 04.09.2019 |
|---|---|
| What the supplied record establishes | Approval extract records a mortgage in favour of MC, HMDA, over the stated area. |
| Identifier / date | 0526/GHMC/SEC/2023-BP, 24 March 2023 |
|---|---|
| What the supplied record establishes | Permit record for a residential building at East Marredpally 18, Survey No. 74/10, with 1 stilt and 5 upper floors. |
| Identifier / date | 002347/GHMC/01275/SWOC/SEC2/2025, completion date 06/06/2025 |
|---|---|
| What the supplied record establishes | Certificate says the inspected Survey No. 74/10 Marredpally building is fit for occupation; records built-up area 1,910.6 sq. m and no deviated built-up area. |
| Identifier / date | Form B dated 23 August 2023; registration-era Form B |
|---|---|
| What the supplied record establishes | Promoter-filed title/encumbrance statements and completion undertakings; these are declarations, not independent title verification. |
| Identifier / date | Document 355928 |
|---|---|
| What the supplied record establishes | Drawing-derived measurements used for the software-measured unit figures; not a RERA-filed carpet-area disclosure. |
| Identifier / date | Partnership deeds 361109 and 130486 |
|---|---|
| What the supplied record establishes | Partnership/entity documents; the supplied extracts state that they do not establish land title. |
The supplied evidence also includes title opinions and encumbrance material, but this Overview does not determine title or current encumbrance status. The approval and certificate entries above are limited to their identified document scopes; the supplied records do not establish that the Marredpally GHMC permit and OC are approvals or completion certification for the registered Uppal land.
Frequently asked questions
Is Mahalaxmi Sri Nilayam registered with Telangana RERA?
Yes. Mahalaxmi Sri Nilayam is registered with the Telangana Real Estate Regulatory Authority as P02200002221; the registration status is New Project.
Who is the developer of Mahalaxmi Sri Nilayam?
The promoter named in the RERA registration is MAHALAXMI CONSTRUCTIONS.
Where is Mahalaxmi Sri Nilayam located?
Mahalaxmi Sri Nilayam is in Uppal, Medchal-Malkajgiri, Telangana (500039).
When will Mahalaxmi Sri Nilayam be completed?
The promoter's proposed date of completion filed with RERA is 23/11/2025. This is the promoter's declaration, not a guarantee.