Sign in

Sri Ram Residency

S V R CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200005405

SRI RAM RESIDENCY is a residential apartment project in Medipally, Medipally mandal, Medchal-Malkajgiri district, developed by registered promoter S V R CONSTRUCTIONS. The registered site covers 575.16 m², and the project comprises one residential building with 1 stilt + 5 upper floors and 10 3BHK apartments, each with a filed saleable area of 143.53 m². Its TG-RERA registration number is P02200005405, issued 03/12/2022, and the promoter’s Form B undertaking states completion by 15/09/2025.

01What we found

Period endedTG-RERA registration ran to 15 Sep 2025 - check its extension on TG-RERA
11documents on file - each fact links to its page
4court cases on this project's land (survey 95, 99, Medipally)
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from magicbricks.comPhoto from magicbricks.com
▦ View all 2 photos
Medipally, Medipally, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered nameSRI RAM RESIDENCY RERA record
Project typeResidential apartment project RERA record
Phase / registered portionOne registered project; the filing identifies Plot No. 39 Northern Part. No separate phase name is disclosed. RERA record
TG-RERA registrationP02200005405, issued 03/12/2022; stated validity through 15/09/2025. RERA record
Registered promoterS V R CONSTRUCTIONS RERA record
RERA statusRegistered certificate on file. The stated registration period has ended; no extension is recorded in the supplied certificate. This is distinct from the building’s completion deadline and occupancy-certificate status. RERA record

Land and geographic identity

FieldProject record
LocalityMedipally RERA record
Revenue villageMedipally RERA record RERA filing
MandalMedipally RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500098 RERA record
Project survey numbers95, 96, 97, 98 and 99; no subdivisions are specified in the project identity record. RERA record Land records
Site identificationPlot No. 39 Northern Part RERA record
Registered site extent575.16 m² Land records
Total / net areaTotal area 575.16 m²; net area 575.16 m². RERA filing
BoundariesEast: Plot No. 39 North East Part; West: 30 ft wide road; North: Park; South: Plot No. 39 Middle Part. RERA filing

Development identity

FieldProject record
Sanctioning authorityPeerzadiguda Municipality/Municipal Corporation Approvals record
Principal building approval0019/BP/3036/2022, approved 15 September 2022 Approvals record
Related file number006667/BP/DTCP/3036/0016/2022 Approvals record
Approved built-up area1,497.88 m² as recorded in the project fields. The approval extract separately lists 1,457.45 m² for five residential upper floors and 282.83 m² for the stilt. RERA filing
Building organizationOne residential building / one tower RERA unit table
Sanctioned configuration1 stilt + 5 upper floors; sanctioned height 15 m.
Parking levels / provisionStilt is approved for parking; the approval also states that any cellar and stilt approved for parking must be used exclusively for parking. A cellar is not identified in the supplied building configuration.
Unit counts10 units in the RERA unit record; one building. The supplied approval extract does not state a separate sanctioned unit count. RERA unit table

Offering and status

FieldProject record
RERA-filed unit type3BHK; 10 units RERA unit table RERA unit details
RERA-filed saleable area143.53 m² per unit RERA unit table RERA unit table
Booked / available0 booked / 10 available in the portal data supplied; the record has no as-of date, so counts are indicative. RERA unit table RERA unit details
Construction stageRERA completeness field reports 90%; no independently verified site-progress evidence is supplied. RERA record
Completion deadlinePromoter’s Form B undertaking states completion by 15/09/2025.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The building approval says an occupancy certificate is required before occupation. Document index

2. The project story

SRI RAM RESIDENCY is registered as a single residential apartment project on Plot No. 39 Northern Part, within the Medipally village and mandal, Medchal-Malkajgiri district. The registered site is 575.16 m² and is identified across Survey Nos. 95, 96, 97, 98 and 99. RERA record Land records

The filed project and building approval describe one building with a stilt and five upper floors, intended for residential use. The RERA unit schedule lists ten 3BHK apartments, with all ten shown as available and none booked in the supplied portal data; because that data has no as-of date, those counts should be treated as indicative rather than current inventory confirmation. RERA unit table RERA unit details

The project record reports 90% completeness, while the promoter’s Form B gives 15/09/2025 as the completion undertaking date. These are filing statements, not independent site verification. No occupancy or completion certificate is supplied, so the available evidence does not establish that the building is occupancy-certified. RERA record Document index

3. Master plan, architecture & building design

The building approval describes a single proposed residential building on a 575.16 m² site, with one stilt and five upper floors and a sanctioned height of 15 m. It records 1,457.45 m² for the residential upper floors and 282.83 m² for the stilt. Separately, the project fields state an approved built-up area of 1,497.88 m². These are distinct figures as recorded in the supplied materials; no further area reconciliation is provided here. RERA filing

The approval extract lists setbacks as Front 3.00, 3.50, Rear 3.50, Side I 3.50 and Side II 3.50; it does not identify the units for these setback figures. The filed boundary description identifies a 30 ft wide road to the west and a park to the north. RERA filing

The approved plan document is identified in the RERA record as a layout-plan document, but its extracted content is unavailable. The evidence supplied therefore does not establish the floor-by-floor apartment arrangement, building footprint, flats per floor, lifts or stair configuration, internal circulation, or detailed common-area distribution. Document index

4. Homes, configurations & floor plans

The RERA unit schedule lists ten 3BHK apartments, with a filed saleable area of 143.53 m² per unit. The supplied portal counts show zero booked and ten available, without an as-of date. RERA unit details RERA unit table

The approved floor-plan drawings were measured using software. For the 3BHK design, the measured carpet area ranges from 108.2 to 109.3 m² (median 108.8 m²); this is a drawing-based measurement, not a RERA-filed carpet-area disclosure, and the supplied measurement record says it needs review. The RERA figure is saleable area, which is not interchangeable with carpet area and includes a share of common areas; balconies and utility areas are also separately excluded from carpet-area measurement under the stated drawing methodology. Floor plans RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010143.53 m²108.2–109.3 m²; median 108.8 m² (software-measured from drawings)24% (drawing-measurement record)

One measured typical-plan panel is labelled “W1-H:1.8 TYPICAL - 1, 3, 4, 5 FLOOR PLAN (SCALE=1:100).” Its listed rooms include bedrooms, living/dining, kitchen, puja, toilets and dress area; the drawing record also identifies a utility and balconies. These are drawing-derived observations, not a substitute for verifying the applicable approved drawing for a specific apartment. RERA unit details

5. Parking & vehicle circulation

The building approval identifies the stilt as a parking level and requires any cellar and stilt approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters and without conversion to another use. Although the condition refers to a cellar, the supplied building configuration describes only one stilt plus five upper floors and does not confirm a cellar.

The project record does not provide a verified parking-space count, visitor or accessible-space provision, EV charging provision, ramp or driveway details, or a unit-by-unit parking allocation. The vendor record mentions “Closed Car Parking” and “Reserved Parking,” but does not establish sanctioned quantities or legally documented allocation to individual apartments. RERA amenities Promoter website

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 facility categories and shows 0% progress for each; water conservation/rainwater harvesting is marked “YES.” The building approval separately requires a rainwater-harvesting structure and tree planting along the site periphery and in front of the premises. No supplied record independently verifies that these facilities are complete. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsNo size or further detail suppliedRERA amenitiesRERA record: 0%; completion not independently verified
Water supplyNo source, capacity or further detail suppliedRERA amenitiesRERA record: 0%; completion not independently verified
Sewerage, treatment and disposalRecord lists sewerage (chambers, lines, septic tank, STP) and treatment/disposal of sewage and sullage water; no capacity suppliedRERA amenitiesRERA record: 0%; completion not independently verified
Storm-water drainsNo further detail suppliedRERA amenitiesRERA record: 0%; completion not independently verified
Green strip / tot-lot / parkNo size supplied; approval requires peripheral planting and refers to a fenced tot-lot maintained as greeneryRERA amenitiesRERA record: 0%; completion not independently verified
Street lightingNo further detail suppliedRERA amenitiesRERA record: 0%; completion not independently verified
Community buildingsNo type or size suppliedRERA amenitiesRERA record: 0%; completion not independently verified
Solid-waste management and disposalNo system details supplied; approval requires a garbage house within the premisesRERA amenitiesRERA record: 0%; completion not independently verified
Water conservation / rainwater harvestingApproval requires a percolation-pit structure and lists four rainwater-harvesting pitsRERA amenitiesRERA record marks “YES” and 0%; installation not independently verified
Energy managementNo further detail suppliedRERA amenitiesRERA record: 0%; completion not independently verified
Fire protection and fire safetyListed in the RERA amenity record; no equipment or system specifications suppliedRERA amenitiesRERA record: 0%; completion not independently verified
Electrical meter room / sub-station / receiving stationListed; no capacity or configuration supplied. Approval requires transformer space on site.RERA amenitiesRERA record: 0%; completion not independently verified
Recreational open spaceAggregate area not suppliedRERA amenitiesRERA record: 0%; completion not independently verified

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage and sewage treatment/disposal, storm-water drains, solid-waste management, energy management, electrical meter room/sub-station/receiving station, fire safety, and water conservation/rainwater harvesting. It does not provide capacities, system designs or verified completion records. The building approval requires rainwater harvesting, transformer space, a garbage house, and relevant plumbing, sanitation, fire-safety and electrical works to be carried out under qualified technical supervision. RERA amenities

The approval also states that an occupancy certificate is required before occupation and that public water and electricity connections will be provided only on production of that certificate. It assigns responsibility for structural and fire safety to the owner, builder/developer, architect and site engineer, and requires the building to follow the sanctioned plan. These are approval conditions, not evidence that the systems have been installed, tested or certified.

No project-specific utility capacities, water source or storage details, STP capacity or reuse plan, electrical backup capacity, lift count or capacity, accessible-circulation details, CCTV or access-control system are established by the supplied RERA project record. The vendor lists 24-hour water supply, power backup, lifts, security and firefighting systems; those are vendor-stated features, not independently verified delivery or approval details. Promoter website

8. Location, access & connectivity

The registered location is Medipally, Medipally mandal, Medchal-Malkajgiri district, Telangana, PIN 500098. The site is identified as Plot No. 39 Northern Part in Survey Nos. 95, 96, 97, 98 and 99; the filed boundaries place a 30 ft wide road to the west and a park to the north. RERA record RERA filing

A location-data record gives an approximate distance of 12.6 km to the nearest sampled Outer Ring Road interchange. It does not supply an interchange name, route or travel time. The supplied records do not establish public-transport connections or verified distances to other landmarks. Location record

9. Developer & development status

The registered promoter is S V R CONSTRUCTIONS, identified in the RERA record as a partnership. Its GSTIN is 36AEKFS2824Q1ZC. The supplied partnership document describes the firm as carrying on builders and developers business and identifies KANDADA VIDEEP REDDY as managing partner and authorized signatory. RERA record Corporate record

The project certificate lists the promoter’s office only as “Village: Mandal: District: Ranga Reddy, Pin: 500079”; the supplied material does not identify a more specific office location or official project contact details.

The RERA record reports 90% completeness, and the promoter’s Form B undertaking states a completion date of 15/09/2025. These are filing statements; no independently verified construction inspection or occupancy/completion certificate is supplied. The registration certificate states validity through 15/09/2025 and shows no extension. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200005405; issued 03/12/2022; stated end date 15/09/2025
Evidence on fileForm C registration certificate
Building construction approval
Identifier / date0019/BP/3036/2022; 15 September 2022
Evidence on filePeerzadiguda Municipality/Municipal Corporation approval for a residential building; related file 006667/BP/DTCP/3036/0016/2022
Layout permit reference
Identifier / date10630/MP2/Plg/HMDA/2012; listed date 02/02/2021
Evidence on fileReference appearing in the building-approval extract
RERA project declaration
Identifier / dateForm B dated 04-11-2022
Evidence on filePromoter declaration, including the 15/09/2025 completion undertaking
Approved layout-plan document
Identifier / dateDocument 272069
Evidence on fileListed in the RERA record; extracted plan content is unavailable
Occupancy / completion certificate
Identifier / dateNot supplied in the reviewed project documents
Evidence on fileNo certificate established by the supplied record Document index

Frequently asked questions

Is SRI RAM RESIDENCY registered with Telangana RERA?

Yes. SRI RAM RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200005405; the registration status is New Project.

Who is the developer of SRI RAM RESIDENCY?

The promoter named in the RERA registration is S V R CONSTRUCTIONS.

Where is SRI RAM RESIDENCY located?

SRI RAM RESIDENCY is in MEDIPALLY, Medchal-Malkajgiri, Telangana (500098).

When will SRI RAM RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 15/09/2025. This is the promoter's declaration, not a guarantee.

More projects in Medipally