Smr Vinay Boulder Woods - Block -B
SMR BUILDERS PRIVATE LIMITED · Rangareddy · RERA P02400001593
SMR VINAY BOULDER WOODS - BLOCK -B is a residential apartment project in Bandlaguda Jagir Village, Gandipet Mandal, Ranga Reddy District. The registered promoter is SMR BUILDERS PRIVATE LIMITED. The registered site has a total area of 24,891.37 sq m and net area of 24,469.46 sq m; the approved arrangement includes two residential blocks and a clubhouse, with Building A at 2 Cellar + 1 Stilt + 16 and Building B at 2 Cellar + 1 Ground + 11. The TG-RERA record lists 183 homes: 77 2BHK units and 106 3BHK units, registered as P02400001593 with proposed completion on 31/03/2024.
More from Smr Builders Pvt Ltd · 8 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | SMR VINAY BOULDER WOODS - BLOCK -B RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Block B is the registered portion in the TG-RERA certificate. The Form B declaration describes the wider development as Phase-II. |
| TG-RERA registration | P02400001593 |
| Registration validity | 31/01/2020 to 31/03/2024; certificate states a four-year term. This is registration validity, not an occupancy certificate or a statement that the project was completed. |
| Registered promoter | SMR BUILDERS PRIVATE LIMITED RERA record Corporate record |
| RERA status | The project record labels the status “New Project.” The certificate records validity ending 31/03/2024 and no extension is recorded in the supplied certificate data. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Bandlaguda Jagir Village RERA record RERA filing |
| Revenue village | Bandlaguda; approval documents also refer to Bandlaguda (Jagir) or Bandlaguda Jagir. RERA record |
| Mandal / district / PIN | Gandipet / Ranga Reddy / 500086 RERA record |
| Project survey numbers and subdivisions | 13/A, 13/AA, 13/AA/2, 13/AA/3, 13/AA/4, 13/AA/5, 13/AA/6, 13/AA/7, 13/AA/8, 13/AA/9, 13/AA/11, 13/AA/12, 13/AA/16 and 13/AA/17 RERA filing |
| Registered site extent | RERA land details: total area 24,891.37 sq m, area affected by road widening/FTL of tanks/nala widening 421.91 sq m, and net area 24,469.46 sq m. RERA filing |
| Boundaries | North: Peripheral Road; East: Kismatpur Main Road; South: Neighbours Property; West: Neighours Property (as recorded). RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority and principal approval | HMDA technical building approval 006961/SKP/R1/U6/HMDA/08012018, dated 08/03/2019; Gram Panchayat permission Roc. No. GP/BGJ/BP/122/2019, dated 08.04.2019. Approvals record |
| Approved built-up area | HMDA technical approval records 85,677.98 sq m as total built-up area and 96,058.39 sq m as proposed built-up area. These are distinct figures in the approval extraction. |
| Approved building arrangement | Two residential blocks and a clubhouse: Building A, 2 Cellar + 1 Stilt + 16; Building B, 2 Cellar + 1 Ground + 11; clubhouse, 1 Ground + 6. |
| Parking levels / counts | Cellar levels are shown in the approved building configurations. Parking-space counts and a unit-wise parking allocation are not established in the supplied record. |
| Approved and RERA-recorded homes | The RERA portal record lists 183 units in total. The approval extracts provided do not state an approved unit count that can be matched to that total here. RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 77 units; 3BHK: 106 units. RERA unit table RERA unit details |
| RERA-filed saleable areas | 2BHK: 125.46 sq m; 3BHK: 192.95 sq m. RERA unit table RERA unit details |
| Booked / available | 102 booked and 81 available in total: 2BHK, 27 booked / 50 available; 3BHK, 75 booked / 31 available. Counts are from the TG-RERA portal read; no as-of date is supplied, so treat them as indicative. RERA unit table RERA unit details |
| Completion date | RERA header states proposed completion 31/03/2024. The certificate supplied records registration validity through that date; the Form B extraction contains a completion undertaking transcribed as 31-04-2024. The completion date and certificate scope require confirmation from the underlying filed record. RERA record |
| Construction stage / OC | No independently verified construction-stage evidence or occupancy/completion certificate is supplied. The approval documents are building-permission records, not OCs. The supplied RERA amenities table includes reported progress entries, shown below. Document index RERA amenities |
2. The project story
This is a residential apartment development registered with TG-RERA as Block B of SMR VINAY BOULDER WOODS, on land recorded at Bandlaguda, Gandipet Mandal, Ranga Reddy District. The registration identifies the specified survey parcels; the HMDA technical approval describes a larger arrangement comprising Building A, Building B and a clubhouse. The RERA-filed offering lists 2BHK and 3BHK apartments. RERA unit details
The available documents establish building-plan permissions and a proposed development, but do not establish completion or occupancy certification. RERA portal progress entries report some infrastructure items at 100%, sewage treatment/disposal at 80%, and an electrical meter room/sub-station/receiving station at 85%; these are portal-reported figures, not independent site verification. RERA amenities
3. Master plan, architecture & building design
The HMDA technical approval covers a site extent of 24,469.46 sq m and identifies two residential blocks and a clubhouse. Its extracted figures distinguish 85,677.98 sq m total built-up area from 96,058.39 sq m proposed built-up area; the supplied material does not provide a separate FSI-counted-area figure.
| Approved component | Floor configuration | Built-up area / height recorded |
|---|---|---|
| Building A — residential | 2 Cellar + 1 Stilt + 16 | 55,865.71 sq m; height 45.6 |
| Building B — residential | 2 Cellar + 1 Ground + 11 | 26,831.99 sq m; height 36.83 |
| Clubhouse | 1 Ground + 6 | 2,980.28 sq m; height 23.9 |
The HMDA approval requires construction to follow the sanctioned plan and states that changes need prior approval. It also specifies that earmarked open space and the approved internal circulation and parking pattern are not to be altered. The supplied extracts do not establish building footprints, flats per floor, lift or stair counts, road dimensions for the site, or a measured residential/common-area breakdown.
4. Homes, configurations & floor plans
The unit counts and saleable areas below are RERA-filed figures. Saleable area is not the same as carpet area: the supplied notes say saleable area includes a home’s share of common areas and is greater than carpet area. No drawing-based carpet-area measurements are available: eight floor-plan drawings are listed, but all eight are pending scanning. RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 77 | 27 | 50 | 125.46 sq m | Not available | Not supplied |
| 3BHK | 106 | 75 | 31 | 192.95 sq m | Not available | Not supplied |
The supplied filing data does not include room dimensions, orientation, balcony or utility measurements, or typical floor arrangements. Booked and available counts are indicative because the portal data has no stated as-of date. RERA unit details Floor plans
5. Parking & vehicle circulation
The HMDA approval shows cellar parking levels within the building configurations and requires the approved parking area and internal circulation pattern to be maintained. The supplied material does not establish the number or type of parking spaces, visitor or accessible parking, ramp arrangements, EV charging, or unit-specific parking allocations. An approved parking bay or plan indication, by itself, would not establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The RERA amenities table lists the following progress figures. They are portal-reported and are not independent verification of completion. HMDA approval extracts also identify certain site facilities and impose conditions concerning open space and STP provision. RERA amenities
| Facility | Clubhouse |
|---|---|
| Description / size | Approved as 1 Ground + 6, built-up area 2,980.28 sq m |
| Evidence source | HMDA technical approval |
| Declared progress / verified status | Sanctioned; delivery status not independently verified |
| Facility | Green strip / tot-lot / park |
|---|---|
| Description / size | No size or capacity supplied |
| Evidence source | RERA amenities; HMDA approval lists “Tot-lot” RERA amenities |
| Declared progress / verified status | RERA portal: 100%; not independently verified |
| Facility | Aggregate area of recreational open space |
|---|---|
| Description / size | Area not supplied; approval requires the earmarked open space to remain open RERA amenities |
| Evidence source | RERA amenities; HMDA technical approval |
| Declared progress / verified status | RERA portal: 0%; not independently verified |
| Facility | Community buildings |
|---|---|
| Description / size | No size supplied |
| Evidence source | RERA amenities RERA amenities |
| Declared progress / verified status | RERA portal: 0%; not independently verified |
| Facility | Internal roads and footpaths |
|---|---|
| Description / size | No dimensions supplied |
| Evidence source | RERA amenities RERA amenities |
| Declared progress / verified status | RERA portal: 100%; not independently verified |
| Facility | Street lighting |
|---|---|
| Description / size | No quantity supplied |
| Evidence source | RERA amenities RERA amenities |
| Declared progress / verified status | RERA portal: 100%; not independently verified |
7. Utilities, building services & safety
| Evidence in the supplied record | RERA lists water supply at 100%. The Gram Panchayat permission refers to a bore-well, sump and terrace tank, each specified as 25,000 litres, and requires water disinfection. RERA amenities |
|---|---|
| Status / limitation | Portal-reported progress; the permission specifies provisions but does not establish independent completion or current operation. |
| Evidence in the supplied record | RERA lists sewerage infrastructure at 100% and sewage treatment/disposal at 80%. HMDA approval requires an STP before OC; the Gram Panchayat permission also refers to a septic tank, sewerage disposal and no drainage overflow onto public roads. RERA amenities |
|---|---|
| Status / limitation | Reported progress is not independent verification; STP capacity and reuse arrangements are not supplied. |
| Evidence in the supplied record | RERA lists storm-water drains at 100% and water conservation/rainwater harvesting at 100%. Approval extracts specify rainwater-harvesting structures, including a percolation pit. RERA amenities |
|---|---|
| Status / limitation | Portal-reported progress; capacity and independent completion status are not supplied. |
| Evidence in the supplied record | RERA lists electrical meter room/sub-station/receiving station at 85%; the approval extracts list a transformer. RERA amenities |
|---|---|
| Status / limitation | Portal-reported progress; supply capacity and backup arrangements are not supplied. |
| Evidence in the supplied record | RERA lists fire protection and fire-safety requirements at 100%. The Gram Panchayat permission calls for fire-safety compliance and fire-services clearance before applying for OC. RERA amenities |
|---|---|
| Status / limitation | Portal-reported progress does not itself establish clearance or statutory compliance. |
| Evidence in the supplied record | HMDA approval lists a garbage house and refuse chute; RERA lists solid-waste management and disposal at 0%. RERA amenities |
|---|---|
| Status / limitation | Provision is listed in approval extraction; RERA portal progress is 0%; operating arrangements are not supplied. |
| Evidence in the supplied record | No lift, service-lift, ramp, accessible-route, or capacity details are supplied. |
|---|---|
| Status / limitation | Not established in the supplied record. |
8. Location, access & connectivity
The registered project location is Bandlaguda Jagir Village, Gandipet Mandal, Ranga Reddy District, Telangana, PIN 500086. The land-record boundary information identifies Kismatpur Main Road to the east and Peripheral Road to the north. RERA record RERA filing
The supplied location data gives Financial District (Nanakramguda), 9.7 km as an anchor distance. No public-transport details, travel times, or additional verified connectivity distances are provided. Location record
9. Developer & development status
The registered promoter is SMR BUILDERS PRIVATE LIMITED, a company. The supplied company address is SMR HOUSE 5TH FLOOR, NAGARJUNA HILLS, KISMATPUR ROAD, BANDLAGUDA JAGIR VILLAGE, Gandipet, Ranga Reddy, 500086. The RERA certificate separately records the promoter office as Village Punjagutta, Mandal Khairtabad, District Hyderabad, PIN 500082. Corporate record Parties record
The RERA record describes the registered portion as Block B. The HMDA technical approval and Form B materials describe a larger development with Buildings A and B and a clubhouse. The promoter’s Form B affidavit declares that Phase-II would be completed by 31-04-2024; the RERA header states 31/03/2024 as the proposed completion date. Neither completion nor an OC is established by the supplied materials. RERA record
10. Approvals, official records & documents
| Record | What the supplied record establishes |
|---|---|
| TG-RERA certificate, P02400001593 | Form C registration for SMR VINAY BOULDER WOODS - BLOCK -B, issued 31/01/2020 and valid through 31/03/2024. |
| HMDA technical approval, 006961/SKP/R1/U6/HMDA/08012018 | Technical building approval dated 08/03/2019 for the apartment development and clubhouse; the document states that local-authority sanction and an occupancy certificate are required. |
| Gram Panchayat permission, Roc. No. GP/BGJ/BP/122/2019 | Building permission dated 08.04.2019 for the residential buildings, with listed conditions; it is a building permit, not an occupancy certificate. |
| Form B affidavit and board authorization | Promoter declaration dated 21 September 2019 and certified board-minute extract authorizing the Managing Director to sign registration documents. |
| Occupancy / completion certificate | Not present in the supplied documents. Document index |
| Layout approval record | No layout approval document is established in the supplied material. Document index |
1. Project at a glance
Project identity
Registered name: SMR VINAY BOULDER WOODS - BLOCK -B
Project type: Residential apartment project
Phase / registered portion: Block B is the registered portion in the TG-RERA certificate. The Form B declaration describes the wider development as Phase-II.
TG-RERA registration: P02400001593
Registration validity: 31/01/2020 to 31/03/2024; certificate states a four-year term. This is registration validity, not an occupancy certificate or a statement that the project was completed.
Registered promoter: SMR BUILDERS PRIVATE LIMITED
RERA status: The project record labels the status “New Project.” The certificate records validity ending 31/03/2024 and no extension is recorded in the supplied certificate data.
Land and geographic identity
Locality: Bandlaguda Jagir Village
Revenue village: Bandlaguda; approval documents also refer to Bandlaguda (Jagir) or Bandlaguda Jagir.
Mandal / district / PIN: Gandipet / Ranga Reddy / 500086
Project survey numbers and subdivisions: 13/A, 13/AA, 13/AA/2, 13/AA/3, 13/AA/4, 13/AA/5, 13/AA/6, 13/AA/7, 13/AA/8, 13/AA/9, 13/AA/11, 13/AA/12, 13/AA/16 and 13/AA/17
Registered site extent: RERA land details: total area 24,891.37 sq m, area affected by road widening/FTL of tanks/nala widening 421.91 sq m, and net area 24,469.46 sq m.
Boundaries: North: Peripheral Road; East: Kismatpur Main Road; South: Neighbours Property; West: Neighours Property (as recorded).
Development identity
Sanctioning authority and principal approval: HMDA technical building approval 006961/SKP/R1/U6/HMDA/08012018, dated 08/03/2019; Gram Panchayat permission Roc. No. GP/BGJ/BP/122/2019, dated 08.04.2019.
Approved built-up area: HMDA technical approval records 85,677.98 sq m as total built-up area and 96,058.39 sq m as proposed built-up area. These are distinct figures in the approval extraction.
Approved building arrangement: Two residential blocks and a clubhouse: Building A, 2 Cellar + 1 Stilt + 16; Building B, 2 Cellar + 1 Ground + 11; clubhouse, 1 Ground + 6.
Parking levels / counts: Cellar levels are shown in the approved building configurations. Parking-space counts and a unit-wise parking allocation are not established in the supplied record.
Approved and RERA-recorded homes: The RERA portal record lists 183 units in total. The approval extracts provided do not state an approved unit count that can be matched to that total here.
Offering and status
RERA-filed configurations: 2BHK: 77 units; 3BHK: 106 units.
RERA-filed saleable areas: 2BHK: 125.46 sq m; 3BHK: 192.95 sq m.
Booked / available: 102 booked and 81 available in total: 2BHK, 27 booked / 50 available; 3BHK, 75 booked / 31 available. Counts are from the TG-RERA portal read; no as-of date is supplied, so treat them as indicative.
Completion date: RERA header states proposed completion 31/03/2024. The certificate supplied records registration validity through that date; the Form B extraction contains a completion undertaking transcribed as 31-04-2024. The completion date and certificate scope require confirmation from the underlying filed record.
Construction stage / OC: No independently verified construction-stage evidence or occupancy/completion certificate is supplied. The approval documents are building-permission records, not OCs. The supplied RERA amenities table includes reported progress entries, shown below.
2. The project story
This is a residential apartment development registered with TG-RERA as Block B of SMR VINAY BOULDER WOODS, on land recorded at Bandlaguda, Gandipet Mandal, Ranga Reddy District. The registration identifies the specified survey parcels; the HMDA technical approval describes a larger arrangement comprising Building A, Building B and a clubhouse. The RERA-filed offering lists 2BHK and 3BHK apartments.
The available documents establish building-plan permissions and a proposed development, but do not establish completion or occupancy certification. RERA portal progress entries report some infrastructure items at 100%, sewage treatment/disposal at 80%, and an electrical meter room/sub-station/receiving station at 85%; these are portal-reported figures, not independent site verification.
3. Master plan, architecture & building design
The HMDA technical approval covers a site extent of 24,469.46 sq m and identifies two residential blocks and a clubhouse. Its extracted figures distinguish 85,677.98 sq m total built-up area from 96,058.39 sq m proposed built-up area; the supplied material does not provide a separate FSI-counted-area figure.
| Approved component | Floor configuration | Built-up area / height recorded |
|---|---|---|
| Building A — residential | 2 Cellar + 1 Stilt + 16 | 55,865.71 sq m; height 45.6 |
| Building B — residential | 2 Cellar + 1 Ground + 11 | 26,831.99 sq m; height 36.83 |
| Clubhouse | 1 Ground + 6 | 2,980.28 sq m; height 23.9 |
The HMDA approval requires construction to follow the sanctioned plan and states that changes need prior approval. It also specifies that earmarked open space and the approved internal circulation and parking pattern are not to be altered. The supplied extracts do not establish building footprints, flats per floor, lift or stair counts, road dimensions for the site, or a measured residential/common-area breakdown.
4. Homes, configurations & floor plans
The unit counts and saleable areas below are RERA-filed figures. Saleable area is not the same as carpet area: the supplied notes say saleable area includes a home’s share of common areas and is greater than carpet area. No drawing-based carpet-area measurements are available: eight floor-plan drawings are listed, but all eight are pending scanning.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 77 | 27 | 50 | 125.46 sq m | Not available | Not supplied |
| 3BHK | 106 | 75 | 31 | 192.95 sq m | Not available | Not supplied |
The supplied filing data does not include room dimensions, orientation, balcony or utility measurements, or typical floor arrangements. Booked and available counts are indicative because the portal data has no stated as-of date.
5. Parking & vehicle circulation
The HMDA approval shows cellar parking levels within the building configurations and requires the approved parking area and internal circulation pattern to be maintained. The supplied material does not establish the number or type of parking spaces, visitor or accessible parking, ramp arrangements, EV charging, or unit-specific parking allocations. An approved parking bay or plan indication, by itself, would not establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The RERA amenities table lists the following progress figures. They are portal-reported and are not independent verification of completion. HMDA approval extracts also identify certain site facilities and impose conditions concerning open space and STP provision.
| Facility | Clubhouse |
|---|---|
| Description / size | Approved as 1 Ground + 6, built-up area 2,980.28 sq m |
| Evidence source | HMDA technical approval |
| Declared progress / verified status | Sanctioned; delivery status not independently verified |
| Facility | Green strip / tot-lot / park |
|---|---|
| Description / size | No size or capacity supplied |
| Evidence source | RERA amenities; HMDA approval lists “Tot-lot” |
| Declared progress / verified status | RERA portal: 100%; not independently verified |
| Facility | Aggregate area of recreational open space |
|---|---|
| Description / size | Area not supplied; approval requires the earmarked open space to remain open |
| Evidence source | RERA amenities; HMDA technical approval |
| Declared progress / verified status | RERA portal: 0%; not independently verified |
| Facility | Community buildings |
|---|---|
| Description / size | No size supplied |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA portal: 0%; not independently verified |
| Facility | Internal roads and footpaths |
|---|---|
| Description / size | No dimensions supplied |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA portal: 100%; not independently verified |
| Facility | Street lighting |
|---|---|
| Description / size | No quantity supplied |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA portal: 100%; not independently verified |
7. Utilities, building services & safety
| Evidence in the supplied record | RERA lists water supply at 100%. The Gram Panchayat permission refers to a bore-well, sump and terrace tank, each specified as 25,000 litres, and requires water disinfection. |
|---|---|
| Status / limitation | Portal-reported progress; the permission specifies provisions but does not establish independent completion or current operation. |
| Evidence in the supplied record | RERA lists sewerage infrastructure at 100% and sewage treatment/disposal at 80%. HMDA approval requires an STP before OC; the Gram Panchayat permission also refers to a septic tank, sewerage disposal and no drainage overflow onto public roads. |
|---|---|
| Status / limitation | Reported progress is not independent verification; STP capacity and reuse arrangements are not supplied. |
| Evidence in the supplied record | RERA lists storm-water drains at 100% and water conservation/rainwater harvesting at 100%. Approval extracts specify rainwater-harvesting structures, including a percolation pit. |
|---|---|
| Status / limitation | Portal-reported progress; capacity and independent completion status are not supplied. |
| Evidence in the supplied record | RERA lists electrical meter room/sub-station/receiving station at 85%; the approval extracts list a transformer. |
|---|---|
| Status / limitation | Portal-reported progress; supply capacity and backup arrangements are not supplied. |
| Evidence in the supplied record | RERA lists fire protection and fire-safety requirements at 100%. The Gram Panchayat permission calls for fire-safety compliance and fire-services clearance before applying for OC. |
|---|---|
| Status / limitation | Portal-reported progress does not itself establish clearance or statutory compliance. |
| Evidence in the supplied record | HMDA approval lists a garbage house and refuse chute; RERA lists solid-waste management and disposal at 0%. |
|---|---|
| Status / limitation | Provision is listed in approval extraction; RERA portal progress is 0%; operating arrangements are not supplied. |
| Evidence in the supplied record | No lift, service-lift, ramp, accessible-route, or capacity details are supplied. |
|---|---|
| Status / limitation | Not established in the supplied record. |
8. Location, access & connectivity
The registered project location is Bandlaguda Jagir Village, Gandipet Mandal, Ranga Reddy District, Telangana, PIN 500086. The land-record boundary information identifies Kismatpur Main Road to the east and Peripheral Road to the north.
The supplied location data gives Financial District (Nanakramguda), 9.7 km as an anchor distance. No public-transport details, travel times, or additional verified connectivity distances are provided.
9. Developer & development status
The registered promoter is SMR BUILDERS PRIVATE LIMITED, a company. The supplied company address is SMR HOUSE 5TH FLOOR, NAGARJUNA HILLS, KISMATPUR ROAD, BANDLAGUDA JAGIR VILLAGE, Gandipet, Ranga Reddy, 500086. The RERA certificate separately records the promoter office as Village Punjagutta, Mandal Khairtabad, District Hyderabad, PIN 500082.
The RERA record describes the registered portion as Block B. The HMDA technical approval and Form B materials describe a larger development with Buildings A and B and a clubhouse. The promoter’s Form B affidavit declares that Phase-II would be completed by 31-04-2024; the RERA header states 31/03/2024 as the proposed completion date. Neither completion nor an OC is established by the supplied materials.
10. Approvals, official records & documents
TG-RERA certificate, P02400001593: Form C registration for SMR VINAY BOULDER WOODS - BLOCK -B, issued 31/01/2020 and valid through 31/03/2024.
HMDA technical approval, 006961/SKP/R1/U6/HMDA/08012018: Technical building approval dated 08/03/2019 for the apartment development and clubhouse; the document states that local-authority sanction and an occupancy certificate are required.
Gram Panchayat permission, Roc. No. GP/BGJ/BP/122/2019: Building permission dated 08.04.2019 for the residential buildings, with listed conditions; it is a building permit, not an occupancy certificate.
Form B affidavit and board authorization: Promoter declaration dated 21 September 2019 and certified board-minute extract authorizing the Managing Director to sign registration documents.
Occupancy / completion certificate: Not present in the supplied documents.
Layout approval record: No layout approval document is established in the supplied material.
Other registrations of Smr Vinay Boulder Woods
Frequently asked questions
Is SMR VINAY BOULDER WOODS - BLOCK -B registered with Telangana RERA?
Yes. SMR VINAY BOULDER WOODS - BLOCK -B is registered with the Telangana Real Estate Regulatory Authority as P02400001593; the registration status is New Project.
Who is the developer of SMR VINAY BOULDER WOODS - BLOCK -B?
The promoter named in the RERA registration is SMR BUILDERS PRIVATE LIMITED.
Where is SMR VINAY BOULDER WOODS - BLOCK -B located?
SMR VINAY BOULDER WOODS - BLOCK -B is in BANDLAGUDA JAGIR VILLAGE, Bandlaguda, Gandipet, Rangareddy, Telangana (500086).
When will SMR VINAY BOULDER WOODS - BLOCK -B be completed?
The promoter's proposed date of completion filed with RERA is 31/03/2024. This is the promoter's declaration, not a guarantee.
More projects in Bandlaguda







