Suvidha Tulip
SUVIDHA INFRA · Sangareddy · RERA P01100006068
SUVIDHA TULIP is a residential apartment project in Muthangi, Patancheru, Sangareddy district, developed by registered promoter SUVIDHA INFRA. The project is on Survey No. 29 and has a registered land extent of 334.45 sq. m, with one tower described as 1Stilt + 5 floors and 10 2BHK apartments of 97.55 sq. m saleable area each. Its TG-RERA registration number is P01100006068, and the project header records proposed completion as 21/11/2028.
More from Suvidha Infra · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SUVIDHA TULIP RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the available record; the registered portion is described as the project on Survey No. 29, plots 189 and 190/SOUTHERN PART. RERA filing |
| TG-RERA registration | P01100006068; registered from 18/04/2023 to 21/07/2028. This is the registration validity period, not the completion deadline. RERA record |
| Registered promoter | SUVIDHA INFRA; entity type recorded as Partnership. RERA record RERA filing Parties record |
| RERA status in supplied record | Registered; the project header identifies it as “New Project.” RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Muthangi; the approval identifies the site as plot nos. 189, 190/SOUTHERN PART, Muthangi Village. RERA record RERA filing |
| Mandal / district / PIN | Patancheru, Sangareddy, 502300. RERA record RERA filing |
| Project survey number(s) | Survey No. 29; no project subdivision is specified in the RERA project record. RERA filing |
| Registered site extent | 334.45 sq. m in the project land record and HMDA approval extraction. RERA filing |
| Net / total area | Total area 334.45 sq. m; net area 334.45 sq. m; affected area recorded as 00 sq. m. RERA filing |
| Boundaries | East: WIDE ROAD-30; west: PLOT NO 193 AND 194; north: PLOT NO 190 NOTHERN PART; south: PLOT NO 188. RERA filing |
Development identity
| Field | Record |
|---|---|
| Technical approval authority / delegated sanction | Hyderabad Metropolitan Development Authority (HMDA) technical approval; the letter directs the applicant to approach Muthangi Gram Panchayath for sanction and release. |
| Principal approval | 052950/SKP/R1/U6/HMDA/05032022, approved 21/07/2022. Approvals record |
| Approved built-up area | HMDA technical approval extraction records 941.45 sq. m as total built-up area. It separately records proposed built-up area of 1140.05 sq. m; these are distinct entries in the approval extraction. |
| Building count | One building/unit in the project record; one tower in the unit summary. RERA filing RERA unit table |
| Floor configuration | HMDA approval describes a proposed 1Stilt + 5 floors residential building. |
| Parking provision in supplied record | The approval extraction records 150.75 sq. m mortgage area; it does not provide a count of parking spaces. RERA filing |
| Approved vs. RERA-declared units | The project record lists 1 total building unit as per approved plan and 1 proposed building unit as per agreement; the RERA unit schedule lists 10 2BHK apartments. The available data does not explain the “building unit” field as an apartment count. RERA filing RERA unit table |
Offering and status
| Field | Record |
|---|---|
| Unit type | 2BHK apartments. RERA unit table RERA unit details |
| RERA-filed saleable area | 97.55 sq. m per 2BHK configuration; 10 units filed. RERA unit table RERA unit table |
| Booked / available | 0 booked; 10 available, as read from the TG-RERA portal; the portal extract carries no as-of date, so counts are indicative. RERA unit table RERA unit details |
| Construction stage | Not disclosed in the supplied project record; no independently verified site-progress evidence is provided. RERA record RERA amenities |
| Completion deadline | Promoter’s Form B declaration states completion by 21-07-2028. The project header gives proposed completion as 21/11/2028. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied evidence. The record does not establish that the building is complete or OC-certified. Document index |
2. The project story
SUVIDHA TULIP is recorded with TG-RERA as a residential apartment project in Muthangi, Patancheru mandal, Sangareddy district, on Survey No. 29. The project land record describes the site as plots 189 and 190/SOUTHERN PART and records an extent of 334.45 sq. m. RERA record RERA filing
HMDA’s technical approval describes one proposed residential building with a stilt and five floors. The RERA unit schedule lists ten 2BHK apartments, all shown as available in the portal extract; that extract has no as-of date. The supplied evidence does not establish the current construction stage, completed portions, or possession status. The approval letter’s requirement to approach the local executive authority for sanction and to approach HMDA for an occupancy certificate after completion is not evidence that either subsequent step has occurred. RERA unit table
3. Master plan, architecture & building design
The supplied HMDA technical approval records a single residential building, described as 1Stilt + 5 floors, on the project site. It records 941.45 sq. m as total built-up area and separately lists 1140.05 sq. m as proposed built-up area. The evidence supplied does not define these area categories further, so they should not be treated as interchangeable.
The project record identifies one building and one tower. The supplied drawing extract contains two floor-plan drawing records, but neither is measured and both are recorded as having no flats; therefore, no reliable drawing-based information is available here on building footprint, floor-by-floor apartment arrangement, lifts, stairs, entrances, circulation, or room layouts. RERA unit table Floor plans
The HMDA approval extraction identifies a mortgage area of 150.75 sq. m and describes it as 15% of built-up area on the first floor in favour of the Metropolitan Commissioner, HMDA. Detailed approval conditions and the mortgage record are addressed in the approvals section of the report.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 97.55 sq. m | Not available: supplied floor-plan records were not measured. | Not supplied |
The 97.55 sq. m figure is the TG-RERA-filed saleable area. Saleable area is not a carpet-area measurement; the supplied floor-plan data notes that saleable area includes a share of common areas, while carpet area is smaller. No software-measured carpet area, balcony or utility area, room dimensions, or loading figure is available for this project in the supplied evidence. The booking and availability counts are portal figures without an as-of date. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The supplied evidence does not establish a number of car or two-wheeler parking spaces, visitor or accessible spaces, parking levels or ramps, or parking-allocation arrangements for individual apartments. The project record marks the 2BHK units as mortgaged, and HMDA’s technical approval records a 150.75 sq. m mortgage area; this is not a parking-space count or evidence of an allotment to a buyer. RERA unit table
The HMDA letter states that parking or construction is not to be made in setback areas. No detailed vehicle-circulation plan is available in the supplied evidence.
6. Amenities, recreation & open spaces
| Description / size | HMDA letter requires rainwater-harvesting structures on the site; the RERA amenity list marks water conservation/rainwater harvesting “YES.” |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Required / recorded in filing; progress shown as 0%. No completed status independently verified. |
| Description / size | HMDA approval requires provision for a transformer within the premises. |
|---|---|
| Declared progress / verified status | Approval condition; completion not established. |
| Description / size | HMDA approval requires provision for a garbage house within the premises. |
|---|---|
| Declared progress / verified status | Approval condition; completion not established. |
| Description / size | RERA amenity list marks water supply “YES.” |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Filing entry; progress shown as 0%. Source, capacity and completion status are not supplied. |
| Description / size | RERA amenity list marks sewerage, including STP, “YES.” |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Filing entry; progress shown as 0%. No capacity or completed status is supplied. |
| Description / size | Listed in the RERA amenity schedule. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not established. |
| Description / size | Listed in the RERA amenity schedule; no area or dimensions supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not established. |
| Description / size | Listed in the RERA amenity schedule. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not established. |
| Description / size | Listed in the RERA amenity schedule; no building description or size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not established. |
| Description / size | Listed in the RERA amenity schedule. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not established. |
| Description / size | Marked “YES” in the RERA amenity schedule. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Filing entry; progress shown as 0%; details and completion status not supplied. |
| Description / size | Marked “YES” in the RERA amenity schedule. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Filing entry; progress shown as 0%; installed systems or clearance status are not established. |
| Description / size | Marked “YES” in the RERA amenity schedule. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Filing entry; progress shown as 0%; specific provision and completion status are not supplied. |
The listed facilities above are RERA-schedule entries or approval requirements; they are not evidence of completed delivery. The supplied material does not establish clubhouse, pool, gym, children’s play area, CCTV, or other recreational facilities as sanctioned or delivered project facilities. RERA amenities
7. Utilities, building services & safety
The RERA amenity schedule records water supply, sewerage, storm-water drainage, rainwater harvesting, energy management, fire-safety requirements, and an electrical meter room/sub-station/receiving station. The entries do not provide source, capacity, equipment specifications, or verified completion status; the schedule shows progress as 0%. RERA amenities
HMDA’s technical approval requires rainwater-harvesting structures, a transformer and garbage house within the premises, and directs that the local executive authority ensure the proposed water-supply, drainage and sewerage-disposal system. It also states that the applicant must comply with the National Building Code, 2005, and provide for construction-worker safety. These are recorded approval conditions, not confirmation that the works have been completed or that an occupancy certificate has been issued.
No project-specific evidence supplied here establishes lift count or capacity, backup power, fire-fighting equipment, escape-stair details, accessibility provisions, CCTV, access control, waste segregation arrangements, or utility capacities. Document index RERA amenities
8. Location, access & connectivity
The registered project location is Muthangi, Patancheru mandal, Sangareddy district, Telangana, PIN 502300. The project is identified on Survey No. 29. RERA record RERA filing RERA filing
The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 3.9 km. Location record No other measured road, public-transport or landmark distances are supplied. The available evidence does not establish project-specific travel times or a detailed access-road route.
9. Developer & development status
The registered promoter is SUVIDHA INFRA, recorded as a partnership. The project record provides GSTIN 36AEPFS3097E1ZL. The promoter’s recorded address is 16-2-100/578, GOPAL NAGAR, MUTHANGI, PATANCHERU, Sangareddy, 502300. The supplied evidence does not provide an official project contact number or promoter website. RERA record RERA filing Corporate record RERA filing
The promoter’s Form B declaration states a completion undertaking of 21-07-2028 and includes declarations concerning title basis, encumbrances and project-account obligations. The project header separately records proposed completion as 21/11/2028. The supplied record does not establish an extension decision or a current construction-progress assessment. RERA record
The RERA project record identifies two landowners, NULU VENKATA SAI SUMANTH and MASHETTY PRABHAKAR, with RevenueShare agreement types. The project’s TG-RERA certificate remains valid through 21/07/2028; this is separate from the completion dates stated in the project records. Parties record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for SUVIDHA TULIP, registration P01100006068, issued 18/04/2023, valid through 21/07/2028. |
| HMDA technical building approval | Approval 052950/SKP/R1/U6/HMDA/05032022, dated 21/07/2022, for a proposed residential 1Stilt + 5 floors building; the letter directs the applicant to approach Muthangi Gram Panchayath for sanction and release. |
| Mortgage record cited in approval | Registered mortgage document 15170/2022, dated 22.04.2022, for 150.74 sq. m on the first floor in favour of the Metropolitan Commissioner, HMDA, as extracted from the approval document. |
| Form B declaration | Promoter declaration for SUVIDHA INFRA (SUVIDHA TULIP), including the stated completion undertaking and project disclosures. |
| Title-related filed documents | Title-search report and connected title instruments are present in the RERA filing. The supplied record does not include an occupancy or completion certificate. Document index |
| Layout-plan document | A layout-plan document is listed in the RERA filing, but the available extraction does not provide an extracted plan description. Document index |
The HMDA technical-approval letter lists conditions including local-authority sanction, rainwater harvesting, transformer and garbage-house provisions, restrictions on parking or construction in setbacks, an HMDA occupancy-certificate application after completion, BT-road formation before release of occupancy, and submission of a NALA conversion certificate before release of occupancy. These are conditions recorded in the approval letter; the supplied evidence does not establish their subsequent completion.
1. Project at a glance
Project identity
Registered project name: SUVIDHA TULIP
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the available record; the registered portion is described as the project on Survey No. 29, plots 189 and 190/SOUTHERN PART.
TG-RERA registration: P01100006068; registered from 18/04/2023 to 21/07/2028. This is the registration validity period, not the completion deadline.
Registered promoter: SUVIDHA INFRA; entity type recorded as Partnership.
RERA status in supplied record: Registered; the project header identifies it as “New Project.”
Land and geographic identity
Locality / revenue village: Muthangi; the approval identifies the site as plot nos. 189, 190/SOUTHERN PART, Muthangi Village.
Mandal / district / PIN: Patancheru, Sangareddy, 502300.
Project survey number(s): Survey No. 29; no project subdivision is specified in the RERA project record.
Registered site extent: 334.45 sq. m in the project land record and HMDA approval extraction.
Net / total area: Total area 334.45 sq. m; net area 334.45 sq. m; affected area recorded as 00 sq. m.
Boundaries: East: WIDE ROAD-30; west: PLOT NO 193 AND 194; north: PLOT NO 190 NOTHERN PART; south: PLOT NO 188.
Development identity
Technical approval authority / delegated sanction: Hyderabad Metropolitan Development Authority (HMDA) technical approval; the letter directs the applicant to approach Muthangi Gram Panchayath for sanction and release.
Principal approval: 052950/SKP/R1/U6/HMDA/05032022, approved 21/07/2022.
Approved built-up area: HMDA technical approval extraction records 941.45 sq. m as total built-up area. It separately records proposed built-up area of 1140.05 sq. m; these are distinct entries in the approval extraction.
Building count: One building/unit in the project record; one tower in the unit summary.
Floor configuration: HMDA approval describes a proposed 1Stilt + 5 floors residential building.
Parking provision in supplied record: The approval extraction records 150.75 sq. m mortgage area; it does not provide a count of parking spaces.
Approved vs. RERA-declared units: The project record lists 1 total building unit as per approved plan and 1 proposed building unit as per agreement; the RERA unit schedule lists 10 2BHK apartments. The available data does not explain the “building unit” field as an apartment count.
Offering and status
Unit type: 2BHK apartments.
RERA-filed saleable area: 97.55 sq. m per 2BHK configuration; 10 units filed.
Booked / available: 0 booked; 10 available, as read from the TG-RERA portal; the portal extract carries no as-of date, so counts are indicative.
Construction stage: Not disclosed in the supplied project record; no independently verified site-progress evidence is provided.
Completion deadline: Promoter’s Form B declaration states completion by 21-07-2028. The project header gives proposed completion as 21/11/2028.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied evidence. The record does not establish that the building is complete or OC-certified.
2. The project story
SUVIDHA TULIP is recorded with TG-RERA as a residential apartment project in Muthangi, Patancheru mandal, Sangareddy district, on Survey No. 29. The project land record describes the site as plots 189 and 190/SOUTHERN PART and records an extent of 334.45 sq. m.
HMDA’s technical approval describes one proposed residential building with a stilt and five floors. The RERA unit schedule lists ten 2BHK apartments, all shown as available in the portal extract; that extract has no as-of date. The supplied evidence does not establish the current construction stage, completed portions, or possession status. The approval letter’s requirement to approach the local executive authority for sanction and to approach HMDA for an occupancy certificate after completion is not evidence that either subsequent step has occurred.
3. Master plan, architecture & building design
The supplied HMDA technical approval records a single residential building, described as 1Stilt + 5 floors, on the project site. It records 941.45 sq. m as total built-up area and separately lists 1140.05 sq. m as proposed built-up area. The evidence supplied does not define these area categories further, so they should not be treated as interchangeable.
The project record identifies one building and one tower. The supplied drawing extract contains two floor-plan drawing records, but neither is measured and both are recorded as having no flats; therefore, no reliable drawing-based information is available here on building footprint, floor-by-floor apartment arrangement, lifts, stairs, entrances, circulation, or room layouts.
The HMDA approval extraction identifies a mortgage area of 150.75 sq. m and describes it as 15% of built-up area on the first floor in favour of the Metropolitan Commissioner, HMDA. Detailed approval conditions and the mortgage record are addressed in the approvals section of the report.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 97.55 sq. m | Not available: supplied floor-plan records were not measured. | Not supplied |
The 97.55 sq. m figure is the TG-RERA-filed saleable area. Saleable area is not a carpet-area measurement; the supplied floor-plan data notes that saleable area includes a share of common areas, while carpet area is smaller. No software-measured carpet area, balcony or utility area, room dimensions, or loading figure is available for this project in the supplied evidence. The booking and availability counts are portal figures without an as-of date.
5. Parking & vehicle circulation
The supplied evidence does not establish a number of car or two-wheeler parking spaces, visitor or accessible spaces, parking levels or ramps, or parking-allocation arrangements for individual apartments. The project record marks the 2BHK units as mortgaged, and HMDA’s technical approval records a 150.75 sq. m mortgage area; this is not a parking-space count or evidence of an allotment to a buyer.
The HMDA letter states that parking or construction is not to be made in setback areas. No detailed vehicle-circulation plan is available in the supplied evidence.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Rainwater harvesting | HMDA letter requires rainwater-harvesting structures on the site; the RERA amenity list marks water conservation/rainwater harvesting “YES.” | Required / recorded in filing; progress shown as 0%. No completed status independently verified. | |
| Transformer | HMDA approval requires provision for a transformer within the premises. | Approval condition; completion not established. | |
| Garbage house | HMDA approval requires provision for a garbage house within the premises. | Approval condition; completion not established. | |
| Water supply | RERA amenity list marks water supply “YES.” | Filing entry; progress shown as 0%. Source, capacity and completion status are not supplied. | |
| Sewerage / sewage treatment | RERA amenity list marks sewerage, including STP, “YES.” | Filing entry; progress shown as 0%. No capacity or completed status is supplied. | |
| Storm-water drains | Listed in the RERA amenity schedule. | Progress shown as 0%; completion not established. | |
| Green strip / park and recreational open space | Listed in the RERA amenity schedule; no area or dimensions supplied. | Progress shown as 0%; completion not established. | |
| Street lighting | Listed in the RERA amenity schedule. | Progress shown as 0%; completion not established. | |
| Community buildings | Listed in the RERA amenity schedule; no building description or size supplied. | Progress shown as 0%; completion not established. | |
| Solid-waste management and disposal | Listed in the RERA amenity schedule. | Progress shown as 0%; completion not established. | |
| Energy management | Marked “YES” in the RERA amenity schedule. | Filing entry; progress shown as 0%; details and completion status not supplied. | |
| Fire protection and fire-safety requirements | Marked “YES” in the RERA amenity schedule. | Filing entry; progress shown as 0%; installed systems or clearance status are not established. | |
| Electrical meter room / sub-station / receiving station | Marked “YES” in the RERA amenity schedule. | Filing entry; progress shown as 0%; specific provision and completion status are not supplied. |
The listed facilities above are RERA-schedule entries or approval requirements; they are not evidence of completed delivery. The supplied material does not establish clubhouse, pool, gym, children’s play area, CCTV, or other recreational facilities as sanctioned or delivered project facilities.
7. Utilities, building services & safety
The RERA amenity schedule records water supply, sewerage, storm-water drainage, rainwater harvesting, energy management, fire-safety requirements, and an electrical meter room/sub-station/receiving station. The entries do not provide source, capacity, equipment specifications, or verified completion status; the schedule shows progress as 0%.
HMDA’s technical approval requires rainwater-harvesting structures, a transformer and garbage house within the premises, and directs that the local executive authority ensure the proposed water-supply, drainage and sewerage-disposal system. It also states that the applicant must comply with the National Building Code, 2005, and provide for construction-worker safety. These are recorded approval conditions, not confirmation that the works have been completed or that an occupancy certificate has been issued.
No project-specific evidence supplied here establishes lift count or capacity, backup power, fire-fighting equipment, escape-stair details, accessibility provisions, CCTV, access control, waste segregation arrangements, or utility capacities.
8. Location, access & connectivity
The registered project location is Muthangi, Patancheru mandal, Sangareddy district, Telangana, PIN 502300. The project is identified on Survey No. 29.
The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 3.9 km. No other measured road, public-transport or landmark distances are supplied. The available evidence does not establish project-specific travel times or a detailed access-road route.
9. Developer & development status
The registered promoter is SUVIDHA INFRA, recorded as a partnership. The project record provides GSTIN 36AEPFS3097E1ZL. The promoter’s recorded address is 16-2-100/578, GOPAL NAGAR, MUTHANGI, PATANCHERU, Sangareddy, 502300. The supplied evidence does not provide an official project contact number or promoter website.
The promoter’s Form B declaration states a completion undertaking of 21-07-2028 and includes declarations concerning title basis, encumbrances and project-account obligations. The project header separately records proposed completion as 21/11/2028. The supplied record does not establish an extension decision or a current construction-progress assessment.
The RERA project record identifies two landowners, NULU VENKATA SAI SUMANTH and MASHETTY PRABHAKAR, with RevenueShare agreement types. The project’s TG-RERA certificate remains valid through 21/07/2028; this is separate from the completion dates stated in the project records.
10. Approvals, official records & documents
TG-RERA registration: Form C for SUVIDHA TULIP, registration P01100006068, issued 18/04/2023, valid through 21/07/2028.
HMDA technical building approval: Approval 052950/SKP/R1/U6/HMDA/05032022, dated 21/07/2022, for a proposed residential 1Stilt + 5 floors building; the letter directs the applicant to approach Muthangi Gram Panchayath for sanction and release.
Mortgage record cited in approval: Registered mortgage document 15170/2022, dated 22.04.2022, for 150.74 sq. m on the first floor in favour of the Metropolitan Commissioner, HMDA, as extracted from the approval document.
Form B declaration: Promoter declaration for SUVIDHA INFRA (SUVIDHA TULIP), including the stated completion undertaking and project disclosures.
Title-related filed documents: Title-search report and connected title instruments are present in the RERA filing. The supplied record does not include an occupancy or completion certificate.
Layout-plan document: A layout-plan document is listed in the RERA filing, but the available extraction does not provide an extracted plan description.
The HMDA technical-approval letter lists conditions including local-authority sanction, rainwater harvesting, transformer and garbage-house provisions, restrictions on parking or construction in setbacks, an HMDA occupancy-certificate application after completion, BT-road formation before release of occupancy, and submission of a NALA conversion certificate before release of occupancy. These are conditions recorded in the approval letter; the supplied evidence does not establish their subsequent completion.
Frequently asked questions
Is SUVIDHA TULIP registered with Telangana RERA?
Yes. SUVIDHA TULIP is registered with the Telangana Real Estate Regulatory Authority as P01100006068; the registration status is New Project.
Who is the developer of SUVIDHA TULIP?
The promoter named in the RERA registration is SUVIDHA INFRA.
Where is SUVIDHA TULIP located?
SUVIDHA TULIP is in MUTHANGI, PATANCHERU, Sangareddy, Telangana (502300).
When will SUVIDHA TULIP be completed?
The promoter's proposed date of completion filed with RERA is 21/11/2028. This is the promoter's declaration, not a guarantee.
More projects in Muthangi