Suvidha Tulip

SUVIDHA INFRA · Sangareddy · RERA P01100006068

SUVIDHA TULIP is a residential apartment project in Muthangi, Patancheru, Sangareddy district, developed by registered promoter SUVIDHA INFRA. The project is on Survey No. 29 and has a registered land extent of 334.45 sq. m, with one tower described as 1Stilt + 5 floors and 10 2BHK apartments of 97.55 sq. m saleable area each. Its TG-RERA registration number is P01100006068, and the project header records proposed completion as 21/11/2028.

More from Suvidha Infra · 4 projects →

01What we found

RegisteredTG-RERA - valid till 21 Jul 2028
17documents on file - each fact links to its page
1court case on this project's land (survey 29, Muthangi)
9items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.comPhoto from 99acres.com
▦ View all 2 photos
Muthangi, Patancheru, Sangareddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameSUVIDHA TULIP RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the available record; the registered portion is described as the project on Survey No. 29, plots 189 and 190/SOUTHERN PART. RERA filing
TG-RERA registrationP01100006068; registered from 18/04/2023 to 21/07/2028. This is the registration validity period, not the completion deadline. RERA record
Registered promoterSUVIDHA INFRA; entity type recorded as Partnership. RERA record RERA filing Parties record
RERA status in supplied recordRegistered; the project header identifies it as “New Project.” RERA record

Land and geographic identity

FieldRecord
Locality / revenue villageMuthangi; the approval identifies the site as plot nos. 189, 190/SOUTHERN PART, Muthangi Village. RERA record RERA filing
Mandal / district / PINPatancheru, Sangareddy, 502300. RERA record RERA filing
Project survey number(s)Survey No. 29; no project subdivision is specified in the RERA project record. RERA filing
Registered site extent334.45 sq. m in the project land record and HMDA approval extraction. RERA filing
Net / total areaTotal area 334.45 sq. m; net area 334.45 sq. m; affected area recorded as 00 sq. m. RERA filing
BoundariesEast: WIDE ROAD-30; west: PLOT NO 193 AND 194; north: PLOT NO 190 NOTHERN PART; south: PLOT NO 188. RERA filing

Development identity

FieldRecord
Technical approval authority / delegated sanctionHyderabad Metropolitan Development Authority (HMDA) technical approval; the letter directs the applicant to approach Muthangi Gram Panchayath for sanction and release.
Principal approval052950/SKP/R1/U6/HMDA/05032022, approved 21/07/2022. Approvals record
Approved built-up areaHMDA technical approval extraction records 941.45 sq. m as total built-up area. It separately records proposed built-up area of 1140.05 sq. m; these are distinct entries in the approval extraction.
Building countOne building/unit in the project record; one tower in the unit summary. RERA filing RERA unit table
Floor configurationHMDA approval describes a proposed 1Stilt + 5 floors residential building.
Parking provision in supplied recordThe approval extraction records 150.75 sq. m mortgage area; it does not provide a count of parking spaces. RERA filing
Approved vs. RERA-declared unitsThe project record lists 1 total building unit as per approved plan and 1 proposed building unit as per agreement; the RERA unit schedule lists 10 2BHK apartments. The available data does not explain the “building unit” field as an apartment count. RERA filing RERA unit table

Offering and status

FieldRecord
Unit type2BHK apartments. RERA unit table RERA unit details
RERA-filed saleable area97.55 sq. m per 2BHK configuration; 10 units filed. RERA unit table RERA unit table
Booked / available0 booked; 10 available, as read from the TG-RERA portal; the portal extract carries no as-of date, so counts are indicative. RERA unit table RERA unit details
Construction stageNot disclosed in the supplied project record; no independently verified site-progress evidence is provided. RERA record RERA amenities
Completion deadlinePromoter’s Form B declaration states completion by 21-07-2028. The project header gives proposed completion as 21/11/2028. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied evidence. The record does not establish that the building is complete or OC-certified. Document index

2. The project story

SUVIDHA TULIP is recorded with TG-RERA as a residential apartment project in Muthangi, Patancheru mandal, Sangareddy district, on Survey No. 29. The project land record describes the site as plots 189 and 190/SOUTHERN PART and records an extent of 334.45 sq. m. RERA record RERA filing

HMDA’s technical approval describes one proposed residential building with a stilt and five floors. The RERA unit schedule lists ten 2BHK apartments, all shown as available in the portal extract; that extract has no as-of date. The supplied evidence does not establish the current construction stage, completed portions, or possession status. The approval letter’s requirement to approach the local executive authority for sanction and to approach HMDA for an occupancy certificate after completion is not evidence that either subsequent step has occurred. RERA unit table

3. Master plan, architecture & building design

The supplied HMDA technical approval records a single residential building, described as 1Stilt + 5 floors, on the project site. It records 941.45 sq. m as total built-up area and separately lists 1140.05 sq. m as proposed built-up area. The evidence supplied does not define these area categories further, so they should not be treated as interchangeable.

The project record identifies one building and one tower. The supplied drawing extract contains two floor-plan drawing records, but neither is measured and both are recorded as having no flats; therefore, no reliable drawing-based information is available here on building footprint, floor-by-floor apartment arrangement, lifts, stairs, entrances, circulation, or room layouts. RERA unit table Floor plans

The HMDA approval extraction identifies a mortgage area of 150.75 sq. m and describes it as 15% of built-up area on the first floor in favour of the Metropolitan Commissioner, HMDA. Detailed approval conditions and the mortgage record are addressed in the approvals section of the report.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001097.55 sq. mNot available: supplied floor-plan records were not measured.Not supplied

The 97.55 sq. m figure is the TG-RERA-filed saleable area. Saleable area is not a carpet-area measurement; the supplied floor-plan data notes that saleable area includes a share of common areas, while carpet area is smaller. No software-measured carpet area, balcony or utility area, room dimensions, or loading figure is available for this project in the supplied evidence. The booking and availability counts are portal figures without an as-of date. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The supplied evidence does not establish a number of car or two-wheeler parking spaces, visitor or accessible spaces, parking levels or ramps, or parking-allocation arrangements for individual apartments. The project record marks the 2BHK units as mortgaged, and HMDA’s technical approval records a 150.75 sq. m mortgage area; this is not a parking-space count or evidence of an allotment to a buyer. RERA unit table

The HMDA letter states that parking or construction is not to be made in setback areas. No detailed vehicle-circulation plan is available in the supplied evidence.

6. Amenities, recreation & open spaces

Rainwater harvesting
Description / sizeHMDA letter requires rainwater-harvesting structures on the site; the RERA amenity list marks water conservation/rainwater harvesting “YES.”
Evidence sourceRERA amenities
Declared progress / verified statusRequired / recorded in filing; progress shown as 0%. No completed status independently verified.
Transformer
Description / sizeHMDA approval requires provision for a transformer within the premises.
Declared progress / verified statusApproval condition; completion not established.
Garbage house
Description / sizeHMDA approval requires provision for a garbage house within the premises.
Declared progress / verified statusApproval condition; completion not established.
Water supply
Description / sizeRERA amenity list marks water supply “YES.”
Evidence sourceRERA amenities
Declared progress / verified statusFiling entry; progress shown as 0%. Source, capacity and completion status are not supplied.
Sewerage / sewage treatment
Description / sizeRERA amenity list marks sewerage, including STP, “YES.”
Evidence sourceRERA amenities
Declared progress / verified statusFiling entry; progress shown as 0%. No capacity or completed status is supplied.
Storm-water drains
Description / sizeListed in the RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0%; completion not established.
Green strip / park and recreational open space
Description / sizeListed in the RERA amenity schedule; no area or dimensions supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0%; completion not established.
Street lighting
Description / sizeListed in the RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0%; completion not established.
Community buildings
Description / sizeListed in the RERA amenity schedule; no building description or size supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0%; completion not established.
Solid-waste management and disposal
Description / sizeListed in the RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0%; completion not established.
Energy management
Description / sizeMarked “YES” in the RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified statusFiling entry; progress shown as 0%; details and completion status not supplied.
Fire protection and fire-safety requirements
Description / sizeMarked “YES” in the RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified statusFiling entry; progress shown as 0%; installed systems or clearance status are not established.
Electrical meter room / sub-station / receiving station
Description / sizeMarked “YES” in the RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified statusFiling entry; progress shown as 0%; specific provision and completion status are not supplied.

The listed facilities above are RERA-schedule entries or approval requirements; they are not evidence of completed delivery. The supplied material does not establish clubhouse, pool, gym, children’s play area, CCTV, or other recreational facilities as sanctioned or delivered project facilities. RERA amenities

7. Utilities, building services & safety

The RERA amenity schedule records water supply, sewerage, storm-water drainage, rainwater harvesting, energy management, fire-safety requirements, and an electrical meter room/sub-station/receiving station. The entries do not provide source, capacity, equipment specifications, or verified completion status; the schedule shows progress as 0%. RERA amenities

HMDA’s technical approval requires rainwater-harvesting structures, a transformer and garbage house within the premises, and directs that the local executive authority ensure the proposed water-supply, drainage and sewerage-disposal system. It also states that the applicant must comply with the National Building Code, 2005, and provide for construction-worker safety. These are recorded approval conditions, not confirmation that the works have been completed or that an occupancy certificate has been issued.

No project-specific evidence supplied here establishes lift count or capacity, backup power, fire-fighting equipment, escape-stair details, accessibility provisions, CCTV, access control, waste segregation arrangements, or utility capacities. Document index RERA amenities

8. Location, access & connectivity

The registered project location is Muthangi, Patancheru mandal, Sangareddy district, Telangana, PIN 502300. The project is identified on Survey No. 29. RERA record RERA filing RERA filing

The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 3.9 km. Location record No other measured road, public-transport or landmark distances are supplied. The available evidence does not establish project-specific travel times or a detailed access-road route.

9. Developer & development status

The registered promoter is SUVIDHA INFRA, recorded as a partnership. The project record provides GSTIN 36AEPFS3097E1ZL. The promoter’s recorded address is 16-2-100/578, GOPAL NAGAR, MUTHANGI, PATANCHERU, Sangareddy, 502300. The supplied evidence does not provide an official project contact number or promoter website. RERA record RERA filing Corporate record RERA filing

The promoter’s Form B declaration states a completion undertaking of 21-07-2028 and includes declarations concerning title basis, encumbrances and project-account obligations. The project header separately records proposed completion as 21/11/2028. The supplied record does not establish an extension decision or a current construction-progress assessment. RERA record

The RERA project record identifies two landowners, NULU VENKATA SAI SUMANTH and MASHETTY PRABHAKAR, with RevenueShare agreement types. The project’s TG-RERA certificate remains valid through 21/07/2028; this is separate from the completion dates stated in the project records. Parties record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for SUVIDHA TULIP, registration P01100006068, issued 18/04/2023, valid through 21/07/2028.
HMDA technical building approvalApproval 052950/SKP/R1/U6/HMDA/05032022, dated 21/07/2022, for a proposed residential 1Stilt + 5 floors building; the letter directs the applicant to approach Muthangi Gram Panchayath for sanction and release.
Mortgage record cited in approvalRegistered mortgage document 15170/2022, dated 22.04.2022, for 150.74 sq. m on the first floor in favour of the Metropolitan Commissioner, HMDA, as extracted from the approval document.
Form B declarationPromoter declaration for SUVIDHA INFRA (SUVIDHA TULIP), including the stated completion undertaking and project disclosures.
Title-related filed documentsTitle-search report and connected title instruments are present in the RERA filing. The supplied record does not include an occupancy or completion certificate. Document index
Layout-plan documentA layout-plan document is listed in the RERA filing, but the available extraction does not provide an extracted plan description. Document index

The HMDA technical-approval letter lists conditions including local-authority sanction, rainwater harvesting, transformer and garbage-house provisions, restrictions on parking or construction in setbacks, an HMDA occupancy-certificate application after completion, BT-road formation before release of occupancy, and submission of a NALA conversion certificate before release of occupancy. These are conditions recorded in the approval letter; the supplied evidence does not establish their subsequent completion.

Frequently asked questions

Is SUVIDHA TULIP registered with Telangana RERA?

Yes. SUVIDHA TULIP is registered with the Telangana Real Estate Regulatory Authority as P01100006068; the registration status is New Project.

Who is the developer of SUVIDHA TULIP?

The promoter named in the RERA registration is SUVIDHA INFRA.

Where is SUVIDHA TULIP located?

SUVIDHA TULIP is in MUTHANGI, PATANCHERU, Sangareddy, Telangana (502300).

When will SUVIDHA TULIP be completed?

The promoter's proposed date of completion filed with RERA is 21/11/2028. This is the promoter's declaration, not a guarantee.