Sign in

Thimu Kings Court Block - G

THIMU AVENUES · Medchal-Malkajgiri · RERA P02200011184

THIMU KINGS COURT BLOCK - G is a residential apartment project in Gundla Pochampally, Medchal Mandal, Medchal-Malkajgiri District, developed by registered promoter THIMU AVENUES, a partnership. It is on a 639.07 sq. m site and comprises one block with 1 Stilt + 5 Floors and 15 homes, configured as 2BHK units. Its TG-RERA registration number is P02200011184, and the proposed completion date is 03/12/2028.

More from Thimu Avenues · 12 projects →

01What we found

RegisteredTG-RERA - valid till 3 Dec 2028
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameTHIMU KINGS COURT BLOCK - G RERA record
Project typeResidential apartment project; new project RERA record RERA filing
Registered portion / phaseBlock G; the registration and building-permit record concern this block. No further phase description is disclosed.
TG-RERA registrationP02200011184
Registration validity03/12/2025–03/12/2028; the certificate states three years, unless extended by the Authority. This is registration validity, not a statement that the building has an occupancy certificate.
Registered promoterTHIMU AVENUES, a partnership Corporate record RERA filing
RERA status in supplied recordRegistration granted under section 5; the certificate records the above validity.

Land and geographic identity

ItemRecord
Locality / village recorded for the projectGundla Pochampally; the building-permit extraction also identifies Kaziguda Village. RERA record Land records
MandalMedchal RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500100 RERA record
Project survey numbers / subdivisions34/A/AA/EE, 34/AA, 34/A Land records
Registered site extent639.07 sq. m
Total / net / affected area in the permit recordPlot area 639.07 sq. m; road-affected area 0 sq. m; nala-affected area 0 sq. m; net plot area 639.07 sq. m.
Boundaries in RERA-filed land detailsNorth: THIMU AVENUES; South: 33 FT WIDE ROAD; East: LAND IN SY NO 3; West: THIMU KINGS COURT. Land records
Road-width figures in supplied permit extractionsOne extracted plan records 10.0; the other records 18 mt.

Development identity

ItemRecord
Sanctioning authority / principal approvalBuilding permit order, approval no. 0024/GUDL/SWBP/2025, dated 03/12/2025; the filed approval records identify Gundlapochampally Municipality. The plan extraction also labels HMDA as authority. Approvals record
File number010842/GUDL/00028/SWBP/2025
Approved built-up area1513.8 sq. m residential upper floors; permit extraction separately states proposed BUA excluding parking 1513.8 sq. m and including parking 1851.63 sq. m.
Building count and nameOne residential block: KING COURT G BLOCK
Sanctioned floor configuration1 Stilt + 5 Floors
HeightPermit extraction records building height 14.99 m; another plan parameter records proposed height 17.99 m and height excluding stilt 14.99 m.
Parking provision in permit extractionStilt/cellar parking is subject to the permit condition requiring approved parking areas to be used exclusively for vehicle parking. The extracted sanctioned parameters record Car Parking Spaces: 1.00 and total parking area 337.83 sq. m.
Approved units / RERA-filed units15 dwelling units in one block; the RERA unit record also shows 15 units. RERA unit table

Offering and status

ItemRecord
RERA-filed configuration2BHK RERA unit table
RERA-filed saleable area120.93 sq. m per unit RERA unit table
Booked / available0 booked / 15 available, as last read from the TG-RERA portal; the record supplies no as-of date, so counts are indicative. RERA unit table
Construction stageThe supplied records identify a proposed building and set a construction commencement deadline; no site-inspected or independently verified construction stage is supplied.
Permit deadlinesConstruction to commence before 01/06/2026 and be completed before 03/12/2028, according to the permit extraction.
Promoter-declared completionThe Form B affidavit undertakes completion by 03/12/2028.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The permit makes an occupancy certificate compulsory before occupation.

2. The project story

THIMU KINGS COURT BLOCK - G is a single-block residential apartment development registered with TG-RERA for 15 homes on a 639.07 sq. m site. The permit record describes the block as one stilt level with five floors and names it KING COURT G BLOCK.

The RERA filing lists 15 2BHK units, all shown as available in the portal data supplied here. That count is indicative because the portal record has no as-of date. The project is documented as proposed; the supplied evidence does not establish construction progress through an independent site inspection. The permit sets a commencement deadline of 01/06/2026 and completion deadline of 03/12/2028, while the promoter’s Form B separately declares the same completion date. Neither a completion certificate nor an occupancy certificate is supplied. RERA unit table

3. Master plan, architecture & building design

The permit material describes one residential block, KING COURT G BLOCK, with 1 Stilt + 5 Floors, on a net plot area of 639.07 sq. m. The extracted plan records proposed coverage of 337.83 sq. m, vacant plot area of 287.86 sq. m, and proposed BUA of 1513.8 sq. m excluding parking and 1851.63 sq. m including parking. These are separate permit figures; they should not be treated as carpet area or saleable area.

The permit extraction lists setbacks of 3.0 m at the front and 3.5 m at the rear and each side. It also records one rainwater-harvesting pit and 25 trees. The supplied extracts do not establish flat distribution by floor, lift or stair details, building entrances, internal circulation, or a site-measured construction status.

The building-permit conditions include a tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate, peripheral greenery and tree planting, a rainwater-harvesting structure, transformer space and a garbage house. These are permit conditions or stated provisions, not evidence that the items have been completed.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK15015120.93 sq. mSoftware-measured median 74.3 sq. m; range 68.9–79.7 sq. m39%

The 2BHK configuration and unit count are from the TG-RERA record. The portal’s booked and available counts are indicative because no as-of date is supplied. The carpet-area figures and loading are software measurements from the approved floor-plan drawing, not RERA-filed carpet-area disclosures; the drawing-based measurements are flagged as needing review. Saleable area is the RERA-filed figure and includes a different area basis from carpet area, including the home’s share of common areas. Balcony and utility areas shown in the measured drawing are separately identified and excluded from the software-measured carpet area. RERA unit table RERA unit details Floor plans

The measured drawing identifies a living area, dining and kitchen, two bedrooms, two toilets, an open-to-air balcony and a utility area. One measured flat’s drawing labels include a bedroom of 3.52 × 3.11 m, a master bedroom of 4.6 × 3.3 m, living area of 4.07 × 3.3 m, an open-to-air balcony of 1.2 × 3.34 m, and a utility area of 1.2 × 3.3 m. These are drawing-based software measurements, not RERA disclosures. RERA unit details

5. Parking & vehicle circulation

The building-permit extraction records total parking area of 337.83 sq. m and a sanctioned-parameters entry of Car Parking Spaces: 1.00. The permit conditions state that the cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not converted or misused. The supplied record does not establish a complete car or two-wheeler space count, visitor or accessible parking, EV charging installation status, parking allocation to individual units, or the location and design of ramps and driveways. A parking provision in the plan does not by itself establish exclusive ownership or allocation to a buyer.

6. Amenities, recreation & open spaces

Tot-lot / green area
Description / sizePermit condition: fence and maintain the tot-lot as greenery before issue of occupancy certificate. No size supplied.
Declared progress / verified statusRequired by permit condition; completion not established.
Peripheral greenery and trees
Description / sizePermit extraction records 25 trees and requires tree planting/peripheral greenery.
Declared progress / verified statusPermit-recorded provision; completion not independently verified.
Rainwater harvesting
Description / sizeOne rainwater-harvesting pit is recorded; plan condition also refers to a percolation pit.
Declared progress / verified statusPermit-recorded provision; completion not established.
Clubhouse; swimming pool; gymnasium; indoor games room; community hall; jogging and strolling track; kids’ play area
Description / sizeListed in vendor-provided amenity information; no sizes supplied.
Evidence sourcePromoter website
Declared progress / verified statusMarketing/vendor listing only; not established as sanctioned or delivered in the supplied project record.
Security and CCTV camera
Description / sizeListed in vendor-provided amenity information; no system details supplied.
Evidence sourcePromoter website
Declared progress / verified statusMarketing/vendor listing only; operational status not established.
Lift and reserved parking
Description / sizeListed in vendor-provided amenity information; no lift or parking allocation details supplied.
Evidence sourcePromoter website
Declared progress / verified statusMarketing/vendor listing only; sanctioned or delivered status not established.

The TG-RERA amenity record lists infrastructure categories including internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, community buildings, sewage treatment/disposal, solid-waste management, energy management, fire safety, electrical meter/substation/receiving station and recreational open space. The listed completion percentage is 0 for each of the 14 entries; this is a portal declaration, not an independent inspection. RERA amenities

7. Utilities, building services & safety

The permit material records a rainwater-harvesting structure and one rainwater-harvesting pit, a septic provision in the plan extraction, a transformer, and a garbage house requirement. It does not provide capacities or establish that these facilities are installed or operating. The TG-RERA amenity record lists water supply, sewerage, storm-water drainage, sewage treatment/disposal, solid-waste management, energy management and fire-safety categories, with 0 progress recorded for each. RERA amenities

A vendor listing describes pneumatic water supply with an electric pump and a bore well to supplement corporation water; it also claims generator backup for common areas and lifts and 6KVA backup for each apartment. These are vendor-provided claims, not verified installation or operation. The vendor also lists one 8-passenger Johnson lift per block; no independent lift schedule or capacity certification is supplied. Promoter website

The permit conditions require an occupancy fire NOC before issue of the occupancy certificate, fire-fighting installations and structural-safety and means-of-escape provisions. They also refer to EV charging infrastructure in parking areas, broadband/digital-connectivity provisions and a transformer space. The supplied record does not establish that these works or clearances have been completed.

8. Location, access & connectivity

The project is registered at Gundla Pochampally, Medchal Mandal, Medchal-Malkajgiri District, PIN 500100; the building-permit material also names Kaziguda Village. The recorded survey numbers are 34/A/AA/EE, 34/AA and 34/A. The land-details boundaries identify a 33 FT WIDE ROAD on the south. The supplied permit extractions contain road-width entries of 10.0 and 18 mt.; no further verified approach-road description is supplied here. RERA record Land records

The location dataset supplies a cadastral parcel-centroid coordinate of 17.41528, 78.35459. Its listed nearby points include ADP (0.0 km), IndusInd Bank (0.4 km), Nanakramguda Govt primary school (0.5 km), Manuu Polytechnic Hyderabad (1.6 km), Sankaraya Eye Hospital (1.6 km), an unnamed bus station (2.2 km) and South India Shopping Mall (2.6 km). These are location-dataset distances, not stated travel times. Location record

9. Developer & development status

The registered promoter is THIMU AVENUES, identified in the RERA record as a partnership. The supplied corporate identifier is GSTIN 36AAPFT2542L1ZM. The registered office address and official contact details are not fully established in the supplied data: the project record gives an address in Harivihar Colony, Kaziguda, Gundla Pochampally, while the registration certificate’s promoter-office field is incomplete and lists Hyderabad, PIN 500029. Corporate record RERA filing

The RERA record identifies Katta Prasanthi as authorized signatory and Busareddy Srikanth as partner. The permit record names architect Zunaira Fatima Khusro and structural engineer Kasiviswanath Sadasivuni. Parties record

No independently verified construction-progress assessment is supplied. The building-permit extraction sets commencement before 01/06/2026 and completion before 03/12/2028; the promoter’s Form B affidavit also declares completion by 03/12/2028. No occupancy or completion certificate is supplied.

10. Approvals, official records & documents

TG-RERA registration certificate (Form C)
Identifier / dateP02200011184; valid 03/12/2025–03/12/2028
What the supplied record establishesRegistration of THIMU KINGS COURT BLOCK - G under section 5, with certificate conditions including the separate-account deposit and quarterly updates.
Building-permit order
Identifier / dateApproval no. 0024/GUDL/SWBP/2025; file no. 010842/GUDL/00028/SWBP/2025; dated 03/12/2025
What the supplied record establishesPermit extraction identifies the 1 Stilt + 5 Floors residential block and 15 dwelling units, subject to stated conditions.
Plan filed as layout/building-plan material
Identifier / date0024/GUDL/SWBP/2025; dated 03/12/2025
What the supplied record establishesSupplied plan extraction describes KING COURT G BLOCK and its sanctioned parameters.
Form B affidavit-cum-declaration
Identifier / dateDated 17-07-2026
What the supplied record establishesPromoter declaration of title basis, encumbrance position, fund management and completion by 03/12/2028.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo certificate establishing completion or occupancy approval is present in the supplied project documents. Document index
Approved layout approval lookup
Identifier / dateNot established from supplied material
What the supplied record establishesThe HMDA DPMS approved-layout lookup is reported as unavailable publicly; this is not evidence of approval refusal. HMDA

Other registrations of Thimu Kings Court

Frequently asked questions

Is THIMU KINGS COURT BLOCK - G registered with Telangana RERA?

Yes. THIMU KINGS COURT BLOCK - G is registered with the Telangana Real Estate Regulatory Authority as P02200011184; the registration status is New Project.

Who is the developer of THIMU KINGS COURT BLOCK - G?

The promoter named in the RERA registration is THIMU AVENUES.

Where is THIMU KINGS COURT BLOCK - G located?

THIMU KINGS COURT BLOCK - G is in GUNDLA POCHAMPALLY, Medchal, Medchal-Malkajgiri, Telangana (500100).

When will THIMU KINGS COURT BLOCK - G be completed?

The promoter's proposed date of completion filed with RERA is 03/12/2028. This is the promoter's declaration, not a guarantee.

More projects in Gundlapochampally