Thimu Kings Court Block E
THIMU AVENUES · Medchal-Malkajgiri · RERA P02200008512
THIMU KINGS COURT BLOCK E is a residential apartment project in Gundla Pochampally, Medchal Mandal, Medchal-Malkajgiri District. The registered promoter is THIMU AVENUES. The project is on a 749.45 m² site and comprises one residential building with 1 Stilt + 5 upper floors and 20 2BHK units, each with a RERA-filed saleable area of 115.02 m². It is registered under TG-RERA registration P02200008512, and the promoter’s Form B undertaking states completion by 15/06/2027.
More from Thimu Avenues · 12 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | THIMU KINGS COURT BLOCK E RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Block E is the registered project name. The RERA filing identifies one building; no separate phase description is disclosed. RERA record RERA filing |
| TG-RERA registration | P02200008512; valid from 15/07/2024 to 15/06/2027, unless extended by the Authority. The registration deadline is distinct from the construction completion date below. RERA record Approvals record |
| Registered promoter | THIMU AVENUES, identified as a partnership in the RERA filing. RERA record RERA filing |
| RERA status | Registered project. The supplied record lists status as “New Project.” RERA record Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Gundla Pochampally locality; project and approval records also identify Kaziguda Village. RERA record RERA filing |
| Mandal / district / PIN | Medchal / Medchal-Malkajgiri / 500014 RERA record RERA filing |
| Project survey number and subdivision | 34/A/AA/EE RERA record Land records |
| Registered site extent | 749.45 m²; sanctioned record states road-affected area 0 m² and net area 749.45 m². RERA filing |
| Boundaries in RERA record | East: 30FT WIDE ROAD; West: THIMU KUNGS COURT APARTMENT A BLOCK; North: LAND OF T SRINIVAS REDDY; South: LAND OF ANDE CHINNA NARSIMHA AND THIMU AVENUES. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Gundlapochampally Municipality/Municipal Corporation; the approval document identifies the permit as a building-construction approval. Approvals record |
| Principal building permit | 0016/BP/3140/2024, dated 15 June 2024. Approvals record |
| Approved built-up area | The RERA-filed approval extraction gives residential area 1,881.95 m², parking area 416.50 m², proposed built-up area excluding parking 1,881.95 m², and including parking 2,298.45 m². It separately lists TOTAL BUA: 2,310.04 and DEDUCTIONS: 11.59, with NET BUA: 1,881.95; those source labels are retained as recorded. |
| Building and floors | One residential building, A (BLDG); sanctioned as 1 Stilt + 5 upper floors. The permit extraction states height 14.99 m; the layout-plan extraction separately records 20.49 mt, 17.99 mt. from GL, and 14.99 mt. Excluding Stilt Floor. |
| Parking levels | Stilt parking is identified in the approval record. The commencement certificate says approved cellar/stilt areas for parking are to be used exclusively for vehicle parking; no cellar level is identified in the supplied floor configuration. |
| Unit counts | 20 residential dwelling units in the approval extraction and 20 RERA-filed 2BHK units. RERA unit table |
| Approved layout record | Layout/building-plan file 458432 identifies TS-DTCP as authority and lists TS/027628/2024 as the LTP licence number; the building permit is delegated to Gundla Pochampally Municipality. |
Offering and status
| Item | Project record |
|---|---|
| Unit type and filed saleable area | 2BHK; RERA-filed saleable area 115.02 m² per unit. RERA unit table RERA unit details |
| Booked / available | 7 booked and 13 available, as last read from the TG-RERA portal; the record provides no as-of date, so these counts are indicative. RERA unit table |
| Construction completion date | The promoter’s Form B undertaking states completion by 15/06/2027; the building-permit extraction also states completion before 15 June, 2027. |
| Occupancy certificate | An occupancy certificate for the residential building is recorded as 0010/OC/3140/2025, dated 24 February 2025. The supplied certificate concerns Building A on survey 34/A/AA/EE. Approvals record |
| Construction stage | The record supplies an architect’s completion certificate dated 25/02/2025 and the municipal occupancy certificate dated 24/02/2025; it does not provide a current, independently verified site-progress assessment. |
2. The project story
THIMU KINGS COURT BLOCK E is a registered residential apartment project on a 749.45 m² site identified in the project records as survey 34/A/AA/EE, in Gundla Pochampally, Medchal Mandal, Medchal-Malkajgiri District; the approval and title records also use Kaziguda Village. The sanctioned arrangement is a single residential building, Building A, with one stilt and five upper floors and 20 dwelling units. RERA record Land records
The RERA filing lists one 2BHK configuration, with 20 units, a saleable area of 115.02 m², and portal-recorded counts of 7 booked and 13 available. Those booking counts have no stated as-of date. The promoter’s Form B undertaking gives a completion date of 15/06/2027, while the municipal record documents an occupancy certificate for Building A dated 24 February 2025. The architect’s Form 1A certificate also records completion; these documents establish the scope stated in those records, not an independent assessment of present condition or delivery of every facility. RERA unit table RERA unit details
3. Master plan, architecture & building design
The RERA-filed building approval describes one residential block, A (BLDG), arranged as 1 Stilt + 5 upper floors on a site of 749.45 m². The approval extraction records 1,881.95 m² residential area and 416.50 m² parking area. It also gives the following separately labelled figures: proposed built-up area excluding parking 1,881.95 m², proposed built-up area including parking 2,298.45 m², TOTAL BUA: 2,310.04, deductions 11.59, and net BUA 1,881.95. These are reproduced as the source labels and are not interchangeable area measures.
The sanctioned-plan extraction identifies a 14.99 m building height; the separate layout-plan extraction lists 20.49 mt, 17.99 mt. from GL, and 14.99 mt. Excluding Stilt Floor. The occupancy certificate identifies the building as Stilt + 5 Upper Floor and records sanctioned floor area of 1,881.95 m² and site-building-plan floor area of 1,932.256 m². The supplied extracts do not describe the internal arrangement of apartments by floor, lift and stair count, building footprint, common-area distribution, or site-wide landscape/open-space dimensions.
The approval records name UTILITY and provide conditions concerning rainwater harvesting, a transformer space, a garbage house, peripheral planting and a fenced tot-lot. The occupancy certificate extraction lists a tot-lot area of 0; no further drawing-based layout of these features is supplied.
4. Homes, configurations & floor plans
The RERA filing lists one configuration, 2BHK, with 20 units and a saleable area of 115.02 m². The booking count is portal-derived and has no supplied as-of date. The floor-plan measurement record is software-measured from approved drawing geometry, not a RERA-filed carpet-area disclosure. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 7 | 13 | 115.02 m² | Median 61.6 m²; range 57.0–84.7 m² across 8 measured flat designs | 46% [software-measured] |
The drawing extraction for one first-floor flat (Flat 04) records two bedrooms, living/dining, kitchen, two toilets and a utility. The listed room areas are 11.93 m² and 11.97 m² for the bedrooms; 20.46 m² for living/dining; 5.34 m² for the kitchen; 3.78 m² and 2.88 m² for the toilets; and 5.09 m² for the utility. The utility is marked excluded from carpet area in the room extraction. These are drawing-derived measurements and should be checked against the approved drawing. RERA unit details Floor plans
Carpet area describes the enclosed home area measured from the drawing geometry in this record. Saleable area is the RERA-filed figure and includes the home’s share of common areas; it is not the same measurement. The source notes that its software-measured carpet figures need review. RERA unit details Floor plans
5. Parking & vehicle circulation
The approval record identifies 416.50 m² as parking area; the commencement certificate describes stilt parking, and its conditions say approved cellar/stilt parking areas are to be used exclusively for vehicle parking. No sanctioned count of car or two-wheeler spaces, visitor or accessible-space allocation, parking allotment by unit, ramp arrangement, or internal vehicle-circulation plan is supplied. A drawn or approved parking area does not by itself establish exclusive parking rights for a buyer.
The building-permit conditions state that parking places are to include EV-charging infrastructure. The supplied records do not establish the number or installation status of chargers.
6. Amenities, recreation & open spaces
The RERA amenity record lists 14 categories. Rainwater harvesting is marked available at 100%; the other listed categories are shown at 0%. These percentages are filing-record values, not independent verification of facility completion. The approval documents also prescribe a transformer space and garbage house and refer to peripheral greenery and a tot-lot. RERA amenities
| Description / size | 1 rainwater-harvesting structure; RERA amenity record marks water conservation/rainwater harvesting YES, 100%. RERA amenities |
|---|---|
| Evidence source | Building permit and RERA amenity record |
| Declared progress / verified status | Declared available in RERA record; no independent site verification supplied |
| Description / size | Approval requires a fenced tot-lot and peripheral planting; area is recorded as NA in the commencement-certificate extraction and 0 in the occupancy-certificate extraction. |
|---|---|
| Evidence source | Building-plan conditions and occupancy-certificate extraction |
| Declared progress / verified status | Required by approval condition; delivered area/status not independently verified |
| Description / size | RERA amenity category shown at 0%. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | No completion evidence supplied |
| Description / size | RERA amenity category shown at 0%. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | No completion evidence supplied |
| Description / size | Sewerage and treatment/disposal categories shown at 0%. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | No completion evidence supplied |
| Description / size | RERA amenity category shown at 0%. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | No completion evidence supplied |
| Description / size | RERA amenity category shown at 0%. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | No completion evidence supplied |
| Description / size | RERA amenity category shown at 0%; building approval requires a garbage house within the premises. RERA amenities |
|---|---|
| Evidence source | TG-RERA record and building-permit condition |
| Declared progress / verified status | No completion evidence supplied |
| Description / size | Each corresponding RERA amenity category is shown at 0%. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | No completion evidence supplied |
The promoter’s marketing material lists a clubhouse, community hall, gym, indoor games, parks/green spaces, children’s play areas, security and power backup. These are marketing claims, not established as sanctioned or delivered facilities in the supplied RERA amenity record. Promoter website
7. Utilities, building services & safety
The building approval identifies one rainwater-harvesting structure and requires space for a transformer and an on-site garbage house. It also includes conditions addressing construction-period safety, worker protection, dust control, debris handling and planting. The RERA amenity record marks water supply, sewerage, storm-water drainage, sewage treatment/disposal, energy management and fire protection/safety at 0%; no system capacities or independent commissioning evidence are supplied. RERA amenities
The approval conditions require occupancy certification before occupation and state that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. The submitted extracts do not specify the lift number or capacity, water source or storage capacity, STP capacity, backup-power capacity, fire-system equipment, CCTV/security system, or accessible routes and facilities. The plan extract describes dual-piping requirements for specified project thresholds; the supplied evidence does not establish that those thresholds apply to this building or confirm installation.
8. Location, access & connectivity
The registered project location is Gundla Pochampally, Medchal Mandal, Medchal-Malkajgiri District, Telangana 500014, with survey 34/A/AA/EE. The project records also identify the site as Kaziguda Village. The RERA-filed boundaries include a 30FT WIDE ROAD on the east; the building-plan extraction refers to a 9.00MT WIDE MAIN ROAD. RERA record RERA filing RERA filing
The supplied location record gives a cadastral parcel-centroid coordinate of 17.58246, 78.94834 and an approximate 32.0 km distance to the nearest sampled Outer Ring Road interchange. This is a dataset-derived location measure, not a travel-time estimate. Location record
9. Developer & development status
The registered promoter is THIMU AVENUES, identified in the RERA filing as a partnership. The filing gives GSTIN 36AAPFT2542L1ZM and lists KATTA PRASANTHI as authorized signatory and BUSAREDDY SRIKANTH as partner. The supplied material does not establish a separate company-registration identifier or provide verified official contact details. RERA filing Corporate record Parties record
The promoter’s Form B affidavit, signed by KATTA PRASANTHI on 03-07-2024, states that the project would be completed by 15/06/2027 and contains the promoter’s declarations concerning land title, encumbrances, project funds and pending approvals. The municipal occupancy certificate records Building A as completed, with completion date 11 January, 2025, and the architect’s Form 1A certificate is dated 25/02/2025. These documents concern the building identified in the certificate; no separate phase-wise construction status is supplied.
10. Approvals, official records & documents
| Identifier / date | P02200008512; valid 15/07/2024–15/06/2027 |
|---|---|
| Scope and evidence | Form C certificate for THIMU KINGS COURT BLOCK E and promoter Thimu Avenues. |
| Identifier / date | 0016/BP/3140/2024; 15 June 2024; file 005629/BP/DTCP/3140/0023/2024 |
|---|---|
| Scope and evidence | Gundlapochampally Municipality/Municipal Corporation approval for Building A, survey 34/A/AA/EE. |
| Identifier / date | LTP licence TS/027628/2024 |
|---|---|
| Scope and evidence | RERA-filed plan document describing one residential building with 1 Stilt + 5 upper floors and 20 units. |
| Identifier / date | 25/02/2025 |
|---|---|
| Scope and evidence | Form 1A certificate identifies the project and occupancy certificate 0010/OC/3140/2025. |
| Identifier / date | 0010/OC/3140/2025; 24 February 2025; application 000360/OC/GUDL/3140/0003/2025 |
|---|---|
| Scope and evidence | Municipal certificate for Building A, survey 34/A/AA/EE. |
| Identifier / date | Form B dated 03-07-2024 |
|---|---|
| Scope and evidence | Promoter declaration and completion undertaking for THIMU KINGS COURT BLOCK E. |
| Identifier / date | Master Plan 2031 sheet available; exact survey-level zone not determined from the image-only sheet. HMDA DPMS layout lookup unavailable publicly in the supplied record. |
|---|---|
| Scope and evidence | Map coverage and portal-access limitations are recorded; no survey-level land-use conclusion is established here. HMDA |
1. Project at a glance
Project identity
Registered name: THIMU KINGS COURT BLOCK E
Project type: Residential apartment project
Phase / registered portion: Block E is the registered project name. The RERA filing identifies one building; no separate phase description is disclosed.
TG-RERA registration: P02200008512; valid from 15/07/2024 to 15/06/2027, unless extended by the Authority. The registration deadline is distinct from the construction completion date below.
Registered promoter: THIMU AVENUES, identified as a partnership in the RERA filing.
RERA status: Registered project. The supplied record lists status as “New Project.”
Land and geographic identity
Locality / revenue village: Gundla Pochampally locality; project and approval records also identify Kaziguda Village.
Mandal / district / PIN: Medchal / Medchal-Malkajgiri / 500014
Project survey number and subdivision: 34/A/AA/EE
Registered site extent: 749.45 m²; sanctioned record states road-affected area 0 m² and net area 749.45 m².
Boundaries in RERA record: East: 30FT WIDE ROAD; West: THIMU KUNGS COURT APARTMENT A BLOCK; North: LAND OF T SRINIVAS REDDY; South: LAND OF ANDE CHINNA NARSIMHA AND THIMU AVENUES.
Development identity
Sanctioning authority: Gundlapochampally Municipality/Municipal Corporation; the approval document identifies the permit as a building-construction approval.
Principal building permit: 0016/BP/3140/2024, dated 15 June 2024.
Approved built-up area: The RERA-filed approval extraction gives residential area 1,881.95 m², parking area 416.50 m², proposed built-up area excluding parking 1,881.95 m², and including parking 2,298.45 m². It separately lists TOTAL BUA: 2,310.04 and DEDUCTIONS: 11.59, with NET BUA: 1,881.95; those source labels are retained as recorded.
Building and floors: One residential building, A (BLDG); sanctioned as 1 Stilt + 5 upper floors. The permit extraction states height 14.99 m; the layout-plan extraction separately records 20.49 mt, 17.99 mt. from GL, and 14.99 mt. Excluding Stilt Floor.
Parking levels: Stilt parking is identified in the approval record. The commencement certificate says approved cellar/stilt areas for parking are to be used exclusively for vehicle parking; no cellar level is identified in the supplied floor configuration.
Unit counts: 20 residential dwelling units in the approval extraction and 20 RERA-filed 2BHK units.
Approved layout record: Layout/building-plan file 458432 identifies TS-DTCP as authority and lists TS/027628/2024 as the LTP licence number; the building permit is delegated to Gundla Pochampally Municipality.
Offering and status
Unit type and filed saleable area: 2BHK; RERA-filed saleable area 115.02 m² per unit.
Booked / available: 7 booked and 13 available, as last read from the TG-RERA portal; the record provides no as-of date, so these counts are indicative.
Construction completion date: The promoter’s Form B undertaking states completion by 15/06/2027; the building-permit extraction also states completion before 15 June, 2027.
Occupancy certificate: An occupancy certificate for the residential building is recorded as 0010/OC/3140/2025, dated 24 February 2025. The supplied certificate concerns Building A on survey 34/A/AA/EE.
Construction stage: The record supplies an architect’s completion certificate dated 25/02/2025 and the municipal occupancy certificate dated 24/02/2025; it does not provide a current, independently verified site-progress assessment.
2. The project story
THIMU KINGS COURT BLOCK E is a registered residential apartment project on a 749.45 m² site identified in the project records as survey 34/A/AA/EE, in Gundla Pochampally, Medchal Mandal, Medchal-Malkajgiri District; the approval and title records also use Kaziguda Village. The sanctioned arrangement is a single residential building, Building A, with one stilt and five upper floors and 20 dwelling units.
The RERA filing lists one 2BHK configuration, with 20 units, a saleable area of 115.02 m², and portal-recorded counts of 7 booked and 13 available. Those booking counts have no stated as-of date. The promoter’s Form B undertaking gives a completion date of 15/06/2027, while the municipal record documents an occupancy certificate for Building A dated 24 February 2025. The architect’s Form 1A certificate also records completion; these documents establish the scope stated in those records, not an independent assessment of present condition or delivery of every facility.
3. Master plan, architecture & building design
The RERA-filed building approval describes one residential block, A (BLDG), arranged as 1 Stilt + 5 upper floors on a site of 749.45 m². The approval extraction records 1,881.95 m² residential area and 416.50 m² parking area. It also gives the following separately labelled figures: proposed built-up area excluding parking 1,881.95 m², proposed built-up area including parking 2,298.45 m², TOTAL BUA: 2,310.04, deductions 11.59, and net BUA 1,881.95. These are reproduced as the source labels and are not interchangeable area measures.
The sanctioned-plan extraction identifies a 14.99 m building height; the separate layout-plan extraction lists 20.49 mt, 17.99 mt. from GL, and 14.99 mt. Excluding Stilt Floor. The occupancy certificate identifies the building as Stilt + 5 Upper Floor and records sanctioned floor area of 1,881.95 m² and site-building-plan floor area of 1,932.256 m². The supplied extracts do not describe the internal arrangement of apartments by floor, lift and stair count, building footprint, common-area distribution, or site-wide landscape/open-space dimensions.
The approval records name UTILITY and provide conditions concerning rainwater harvesting, a transformer space, a garbage house, peripheral planting and a fenced tot-lot. The occupancy certificate extraction lists a tot-lot area of 0; no further drawing-based layout of these features is supplied.
4. Homes, configurations & floor plans
The RERA filing lists one configuration, 2BHK, with 20 units and a saleable area of 115.02 m². The booking count is portal-derived and has no supplied as-of date. The floor-plan measurement record is software-measured from approved drawing geometry, not a RERA-filed carpet-area disclosure.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 7 | 13 | 115.02 m² | Median 61.6 m²; range 57.0–84.7 m² across 8 measured flat designs | 46% [software-measured] |
The drawing extraction for one first-floor flat (Flat 04) records two bedrooms, living/dining, kitchen, two toilets and a utility. The listed room areas are 11.93 m² and 11.97 m² for the bedrooms; 20.46 m² for living/dining; 5.34 m² for the kitchen; 3.78 m² and 2.88 m² for the toilets; and 5.09 m² for the utility. The utility is marked excluded from carpet area in the room extraction. These are drawing-derived measurements and should be checked against the approved drawing.
Carpet area describes the enclosed home area measured from the drawing geometry in this record. Saleable area is the RERA-filed figure and includes the home’s share of common areas; it is not the same measurement. The source notes that its software-measured carpet figures need review.
5. Parking & vehicle circulation
The approval record identifies 416.50 m² as parking area; the commencement certificate describes stilt parking, and its conditions say approved cellar/stilt parking areas are to be used exclusively for vehicle parking. No sanctioned count of car or two-wheeler spaces, visitor or accessible-space allocation, parking allotment by unit, ramp arrangement, or internal vehicle-circulation plan is supplied. A drawn or approved parking area does not by itself establish exclusive parking rights for a buyer.
The building-permit conditions state that parking places are to include EV-charging infrastructure. The supplied records do not establish the number or installation status of chargers.
6. Amenities, recreation & open spaces
The RERA amenity record lists 14 categories. Rainwater harvesting is marked available at 100%; the other listed categories are shown at 0%. These percentages are filing-record values, not independent verification of facility completion. The approval documents also prescribe a transformer space and garbage house and refer to peripheral greenery and a tot-lot.
| Description / size | 1 rainwater-harvesting structure; RERA amenity record marks water conservation/rainwater harvesting YES, 100%. |
|---|---|
| Evidence source | Building permit and RERA amenity record |
| Declared progress / verified status | Declared available in RERA record; no independent site verification supplied |
| Description / size | Approval requires a fenced tot-lot and peripheral planting; area is recorded as NA in the commencement-certificate extraction and 0 in the occupancy-certificate extraction. |
|---|---|
| Evidence source | Building-plan conditions and occupancy-certificate extraction |
| Declared progress / verified status | Required by approval condition; delivered area/status not independently verified |
| Description / size | RERA amenity category shown at 0%. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | No completion evidence supplied |
| Description / size | RERA amenity category shown at 0%. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | No completion evidence supplied |
| Description / size | Sewerage and treatment/disposal categories shown at 0%. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | No completion evidence supplied |
| Description / size | RERA amenity category shown at 0%. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | No completion evidence supplied |
| Description / size | RERA amenity category shown at 0%. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | No completion evidence supplied |
| Description / size | RERA amenity category shown at 0%; building approval requires a garbage house within the premises. |
|---|---|
| Evidence source | TG-RERA record and building-permit condition |
| Declared progress / verified status | No completion evidence supplied |
| Description / size | Each corresponding RERA amenity category is shown at 0%. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | No completion evidence supplied |
The promoter’s marketing material lists a clubhouse, community hall, gym, indoor games, parks/green spaces, children’s play areas, security and power backup. These are marketing claims, not established as sanctioned or delivered facilities in the supplied RERA amenity record.
7. Utilities, building services & safety
The building approval identifies one rainwater-harvesting structure and requires space for a transformer and an on-site garbage house. It also includes conditions addressing construction-period safety, worker protection, dust control, debris handling and planting. The RERA amenity record marks water supply, sewerage, storm-water drainage, sewage treatment/disposal, energy management and fire protection/safety at 0%; no system capacities or independent commissioning evidence are supplied.
The approval conditions require occupancy certification before occupation and state that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. The submitted extracts do not specify the lift number or capacity, water source or storage capacity, STP capacity, backup-power capacity, fire-system equipment, CCTV/security system, or accessible routes and facilities. The plan extract describes dual-piping requirements for specified project thresholds; the supplied evidence does not establish that those thresholds apply to this building or confirm installation.
8. Location, access & connectivity
The registered project location is Gundla Pochampally, Medchal Mandal, Medchal-Malkajgiri District, Telangana 500014, with survey 34/A/AA/EE. The project records also identify the site as Kaziguda Village. The RERA-filed boundaries include a 30FT WIDE ROAD on the east; the building-plan extraction refers to a 9.00MT WIDE MAIN ROAD.
The supplied location record gives a cadastral parcel-centroid coordinate of 17.58246, 78.94834 and an approximate 32.0 km distance to the nearest sampled Outer Ring Road interchange. This is a dataset-derived location measure, not a travel-time estimate.
9. Developer & development status
The registered promoter is THIMU AVENUES, identified in the RERA filing as a partnership. The filing gives GSTIN 36AAPFT2542L1ZM and lists KATTA PRASANTHI as authorized signatory and BUSAREDDY SRIKANTH as partner. The supplied material does not establish a separate company-registration identifier or provide verified official contact details.
The promoter’s Form B affidavit, signed by KATTA PRASANTHI on 03-07-2024, states that the project would be completed by 15/06/2027 and contains the promoter’s declarations concerning land title, encumbrances, project funds and pending approvals. The municipal occupancy certificate records Building A as completed, with completion date 11 January, 2025, and the architect’s Form 1A certificate is dated 25/02/2025. These documents concern the building identified in the certificate; no separate phase-wise construction status is supplied.
10. Approvals, official records & documents
| Identifier / date | P02200008512; valid 15/07/2024–15/06/2027 |
|---|---|
| Scope and evidence | Form C certificate for THIMU KINGS COURT BLOCK E and promoter Thimu Avenues. |
| Identifier / date | 0016/BP/3140/2024; 15 June 2024; file 005629/BP/DTCP/3140/0023/2024 |
|---|---|
| Scope and evidence | Gundlapochampally Municipality/Municipal Corporation approval for Building A, survey 34/A/AA/EE. |
| Identifier / date | LTP licence TS/027628/2024 |
|---|---|
| Scope and evidence | RERA-filed plan document describing one residential building with 1 Stilt + 5 upper floors and 20 units. |
| Identifier / date | 25/02/2025 |
|---|---|
| Scope and evidence | Form 1A certificate identifies the project and occupancy certificate 0010/OC/3140/2025. |
| Identifier / date | 0010/OC/3140/2025; 24 February 2025; application 000360/OC/GUDL/3140/0003/2025 |
|---|---|
| Scope and evidence | Municipal certificate for Building A, survey 34/A/AA/EE. |
| Identifier / date | Form B dated 03-07-2024 |
|---|---|
| Scope and evidence | Promoter declaration and completion undertaking for THIMU KINGS COURT BLOCK E. |
| Identifier / date | Master Plan 2031 sheet available; exact survey-level zone not determined from the image-only sheet. HMDA DPMS layout lookup unavailable publicly in the supplied record. |
|---|---|
| Scope and evidence | Map coverage and portal-access limitations are recorded; no survey-level land-use conclusion is established here. |
Other registrations of Thimu Kings Court
Frequently asked questions
Is THIMU KINGS COURT BLOCK E registered with Telangana RERA?
Yes. THIMU KINGS COURT BLOCK E is registered with the Telangana Real Estate Regulatory Authority as P02200008512; the registration status is New Project.
Who is the developer of THIMU KINGS COURT BLOCK E?
The promoter named in the RERA registration is THIMU AVENUES.
Where is THIMU KINGS COURT BLOCK E located?
THIMU KINGS COURT BLOCK E is in GUNDLA POCHAMPALLY, Gundlapochampally, Medchal, Medchal-Malkajgiri, Telangana (500014).
When will THIMU KINGS COURT BLOCK E be completed?
The promoter's proposed date of completion filed with RERA is 15/06/2027. This is the promoter's declaration, not a guarantee.